CHAPTER 103 —COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY
SUBCHAPTER I—HAZARDOUS SUBSTANCES RELEASES, LIABILITY, COMPENSATION
SUBCHAPTER II—HAZARDOUS SUBSTANCE RESPONSE REVENUE
Part A—Hazardous Substance Response Trust Fund
Part B—Post-closure Liability Trust Fund
SUBCHAPTER III—MISCELLANEOUS PROVISIONS
SUBCHAPTER IV—POLLUTION INSURANCE
SUBCHAPTER I—HAZARDOUS SUBSTANCES RELEASES, LIABILITY, COMPENSATION
§9601. Definitions
For purpose of this subchapter—
(1) The term "act of God" means an unanticipated grave natural disaster or other natural phenomenon of an exceptional, inevitable, and irresistible character, the effects of which could not have been prevented or avoided by the exercise of due care or foresight.
(2) The term "Administrator" means the Administrator of the United States Environmental Protection Agency.
(3) The term "barrel" means forty-two United States gallons at sixty degrees Fahrenheit.
(4) The term "claim" means a demand in writing for a sum certain.
(5) The term "claimant" means any person who presents a claim for compensation under this chapter.
(6) The term "damages" means damages for injury or loss of natural resources as set forth in
(7) The term "drinking water supply" means any raw or finished water source that is or may be used by a public water system (as defined in the Safe Drinking Water Act [
(8) The term "environment" means (A) the navigable waters, the waters of the contiguous zone, and the ocean waters of which the natural resources are under the exclusive management authority of the United States under the Magnuson-Stevens Fishery Conservation and Management Act [
(9) The term "facility" means (A) any building, structure, installation, equipment, pipe or pipeline (including any pipe into a sewer or publicly owned treatment works), well, pit, pond, lagoon, impoundment, ditch, landfill, storage container, motor vehicle, rolling stock, or aircraft, or (B) any site or area where a hazardous substance has been deposited, stored, disposed of, or placed, or otherwise come to be located; but does not include any consumer product in consumer use or any vessel.
(10) The term "federally permitted release" means (A) discharges in compliance with a permit under section 402 of the Federal Water Pollution Control Act [
(11) The term "Fund" or "Trust Fund" means the Hazardous Substance Superfund established by
(12) The term "ground water" means water in a saturated zone or stratum beneath the surface of land or water.
(13) The term "guarantor" means any person, other than the owner or operator, who provides evidence of financial responsibility for an owner or operator under this chapter.
(14) The term "hazardous substance" means (A) any substance designated pursuant to section 311(b)(2)(A) of the Federal Water Pollution Control Act [
(15) The term "navigable waters" or "navigable waters of the United States" means the waters of the United States, including the territorial seas.
(16) The term "natural resources" means land, fish, wildlife, biota, air, water, ground water, drinking water supplies, and other such resources belonging to, managed by, held in trust by, appertaining to, or otherwise controlled by the United States (including the resources of the fishery conservation zone established by the Magnuson-Stevens Fishery Conservation and Management Act [
(17) The term "offshore facility" means any facility of any kind located in, on, or under, any of the navigable waters of the United States, and any facility of any kind which is subject to the jurisdiction of the United States and is located in, on, or under any other waters, other than a vessel or a public vessel.
(18) The term "onshore facility" means any facility (including, but not limited to, motor vehicles and rolling stock) of any kind located in, on, or under, any land or nonnavigable waters within the United States.
(19) The term "otherwise subject to the jurisdiction of the United States" means subject to the jurisdiction of the United States by virtue of United States citizenship, United States vessel documentation or numbering, or as provided by international agreement to which the United States is a party.
(20)(A) The term "owner or operator" means (i) in the case of a vessel, any person owning, operating, or chartering by demise, such vessel, (ii) in the case of an onshore facility or an offshore facility, any person owning or operating such facility, and (iii) in the case of any facility, title or control of which was conveyed due to bankruptcy, foreclosure, tax delinquency, abandonment, or similar means to a unit of State or local government, any person who owned, operated, or otherwise controlled activities at such facility immediately beforehand. Such term does not include a person, who, without participating in the management of a vessel or facility, holds indicia of ownership primarily to protect his security interest in the vessel or facility.
(B) In the case of a hazardous substance which has been accepted for transportation by a common or contract carrier and except as provided in section 9607(a)(3) or (4) of this title, (i) the term "owner or operator" shall mean such common carrier or other bona fide for hire carrier acting as an independent contractor during such transportation, (ii) the shipper of such hazardous substance shall not be considered to have caused or contributed to any release during such transportation which resulted solely from circumstances or conditions beyond his control.
(C) In the case of a hazardous substance which has been delivered by a common or contract carrier to a disposal or treatment facility and except as provided in section 9607(a)(3) or (4) of this title, (i) the term "owner or operator" shall not include such common or contract carrier, and (ii) such common or contract carrier shall not be considered to have caused or contributed to any release at such disposal or treatment facility resulting from circumstances or conditions beyond its control.
(D) The term "owner or operator" does not include a unit of State or local government which acquired ownership or control through seizure or otherwise in connection with law enforcement activity, or through bankruptcy, tax delinquency, abandonment, or other circumstances in which the government acquires title by virtue of its function as sovereign. The exclusion provided under this paragraph shall not apply to any State or local government which has caused or contributed to the release or threatened release of a hazardous substance from the facility, and such a State or local government shall be subject to the provisions of this chapter in the same manner and to the same extent, both procedurally and substantively, as any nongovernmental entity, including liability under
(E)
(i)
(I) the Native village or Native Corporation that received the facility from the United States Government; or
(II) a successor in interest to which the facility was conveyed under section 14(c) of such Act [
(ii)
(F)
(i)
(ii)
(I) forecloses on the vessel or facility; and
(II) after foreclosure, sells, re-leases (in the case of a lease finance transaction), or liquidates the vessel or facility, maintains business activities, winds up operations, undertakes a response action under
if the person seeks to sell, re-lease (in the case of a lease finance transaction), or otherwise divest the person of the vessel or facility at the earliest practicable, commercially reasonable time, on commercially reasonable terms, taking into account market conditions and legal and regulatory requirements.
(G)
(i) the term "participate in management"—
(I) means actually participating in the management or operational affairs of a vessel or facility; and
(II) does not include merely having the capacity to influence, or the unexercised right to control, vessel or facility operations;
(ii) a person that is a lender and that holds indicia of ownership primarily to protect a security interest in a vessel or facility shall be considered to participate in management only if, while the borrower is still in possession of the vessel or facility encumbered by the security interest, the person—
(I) exercises decisionmaking control over the environmental compliance related to the vessel or facility, such that the person has undertaken responsibility for the hazardous substance handling or disposal practices related to the vessel or facility; or
(II) exercises control at a level comparable to that of a manager of the vessel or facility, such that the person has assumed or manifested responsibility—
(aa) for the overall management of the vessel or facility encompassing day-to-day decisionmaking with respect to environmental compliance; or
(bb) over all or substantially all of the operational functions (as distinguished from financial or administrative functions) of the vessel or facility other than the function of environmental compliance;
(iii) the term "participate in management" does not include performing an act or failing to act prior to the time at which a security interest is created in a vessel or facility; and
(iv) the term "participate in management" does not include—
(I) holding a security interest or abandoning or releasing a security interest;
(II) including in the terms of an extension of credit, or in a contract or security agreement relating to the extension, a covenant, warranty, or other term or condition that relates to environmental compliance;
(III) monitoring or enforcing the terms and conditions of the extension of credit or security interest;
(IV) monitoring or undertaking 1 or more inspections of the vessel or facility;
(V) requiring a response action or other lawful means of addressing the release or threatened release of a hazardous substance in connection with the vessel or facility prior to, during, or on the expiration of the term of the extension of credit;
(VI) providing financial or other advice or counseling in an effort to mitigate, prevent, or cure default or diminution in the value of the vessel or facility;
(VII) restructuring, renegotiating, or otherwise agreeing to alter the terms and conditions of the extension of credit or security interest, exercising forbearance;
(VIII) exercising other remedies that may be available under applicable law for the breach of a term or condition of the extension of credit or security agreement; or
(IX) conducting a response action under
if the actions do not rise to the level of participating in management (within the meaning of clauses (i) and (ii)).
(H)
(i)
(I) in which the lessor does not initially select the leased vessel or facility and does not during the lease term control the daily operations or maintenance of the vessel or facility; or
(II) that conforms with regulations issued by the appropriate Federal banking agency or the appropriate State bank supervisor (as those terms are defined in
(ii)
(iii)
(I)(aa) purchase at sale under a judgment or decree, power of sale, or nonjudicial foreclosure sale;
(bb) a deed in lieu of foreclosure, or similar conveyance from a trustee; or
(cc) repossession,
if the vessel or facility was security for an extension of credit previously contracted;
(II) conveyance pursuant to an extension of credit previously contracted, including the termination of a lease agreement; or
(III) any other formal or informal manner by which the person acquires, for subsequent disposition, title to or possession of a vessel or facility in order to protect the security interest of the person.
(iv)
(I) an insured depository institution (as defined in
(II) an insured credit union (as defined in
(III) a bank or association chartered under the Farm Credit Act of 1971 (
(IV) a leasing or trust company that is an affiliate of an insured depository institution;
(V) any person (including a successor or assignee of any such person) that makes a bona fide extension of credit to or takes or acquires a security interest from a nonaffiliated person;
(VI) the Federal National Mortgage Association, the Federal Home Loan Mortgage Corporation, the Federal Agricultural Mortgage Corporation, or any other entity that in a bona fide manner buys or sells loans or interests in loans;
(VII) a person that insures or guarantees against a default in the repayment of an extension of credit, or acts as a surety with respect to an extension of credit, to a nonaffiliated person; and
(VIII) a person that provides title insurance and that acquires a vessel or facility as a result of assignment or conveyance in the course of underwriting claims and claims settlement.
(v)
(vi)
(21) The term "person" means an individual, firm, corporation, association, partnership, consortium, joint venture, commercial entity, United States Government, State, municipality, commission, political subdivision of a State, or any interstate body.
(22) The term "release" means any spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into the environment (including the abandonment or discarding of barrels, containers, and other closed receptacles containing any hazardous substance or pollutant or contaminant), but excludes (A) any release which results in exposure to persons solely within a workplace, with respect to a claim which such persons may assert against the employer of such persons, (B) emissions from the engine exhaust of a motor vehicle, rolling stock, aircraft, vessel, or pipeline pumping station engine, (C) release of source, byproduct, or special nuclear material from a nuclear incident, as those terms are defined in the Atomic Energy Act of 1954 [
(23) The terms "remove" or "removal" means 2 the cleanup or removal of released hazardous substances from the environment, such actions as may be necessary taken in the event of the threat of release of hazardous substances into the environment, such actions as may be necessary to monitor, assess, and evaluate the release or threat of release of hazardous substances, the disposal of removed material, or the taking of such other actions as may be necessary to prevent, minimize, or mitigate damage to the public health or welfare or to the environment, which may otherwise result from a release or threat of release. The term includes, in addition, without being limited to, security fencing or other measures to limit access, provision of alternative water supplies, temporary evacuation and housing of threatened individuals not otherwise provided for, action taken under
(24) The terms "remedy" or "remedial action" means 2 those actions consistent with permanent remedy taken instead of or in addition to removal actions in the event of a release or threatened release of a hazardous substance into the environment, to prevent or minimize the release of hazardous substances so that they do not migrate to cause substantial danger to present or future public health or welfare or the environment. The term includes, but is not limited to, such actions at the location of the release as storage, confinement, perimeter protection using dikes, trenches, or ditches, clay cover, neutralization, cleanup of released hazardous substances and associated contaminated materials, recycling or reuse, diversion, destruction, segregation of reactive wastes, dredging or excavations, repair or replacement of leaking containers, collection of leachate and runoff, onsite treatment or incineration, provision of alternative water supplies, and any monitoring reasonably required to assure that such actions protect the public health and welfare and the environment. The term includes the costs of permanent relocation of residents and businesses and community facilities where the President determines that, alone or in combination with other measures, such relocation is more cost-effective than and environmentally preferable to the transportation, storage, treatment, destruction, or secure disposition offsite of hazardous substances, or may otherwise be necessary to protect the public health or welfare; the term includes offsite transport and offsite storage, treatment, destruction, or secure disposition of hazardous substances and associated contaminated materials.
(25) The terms "respond" or "response" means 2 remove, removal, remedy, and remedial action;,3 all such terms (including the terms "removal" and "remedial action") include enforcement activities related thereto.
(26) The terms "transport" or "transportation" means 2 the movement of a hazardous substance by any mode, including a hazardous liquid pipeline facility (as defined in
(27) The terms "United States" and "State" include the several States of the United States, the District of Columbia, the Commonwealth of Puerto Rico, Guam, American Samoa, the United States Virgin Islands, the Commonwealth of the Northern Marianas, and any other territory or possession over which the United States has jurisdiction.
(28) The term "vessel" means every description of watercraft or other artificial contrivance used, or capable of being used, as a means of transportation on water.
(29) The terms "disposal", "hazardous waste", and "treatment" shall have the meaning provided in section 1004 of the Solid Waste Disposal Act [
(30) The terms "territorial sea" and "contiguous zone" shall have the meaning provided in section 502 of the Federal Water Pollution Control Act [
(31) The term "national contingency plan" means the national contingency plan published under section 311(c) 4 of the Federal Water Pollution Control Act or revised pursuant to
(32) The terms "liable" or "liability" under this subchapter shall be construed to be the standard of liability which obtains under section 311 of the Federal Water Pollution Control Act [
(33) The term "pollutant or contaminant" shall include, but not be limited to, any element, substance, compound, or mixture, including disease-causing agents, which after release into the environment and upon exposure, ingestion, inhalation, or assimilation into any organism, either directly from the environment or indirectly by ingestion through food chains, will or may reasonably be anticipated to cause death, disease, behavioral abnormalities, cancer, genetic mutation, physiological malfunctions (including malfunctions in reproduction) or physical deformations, in such organisms or their offspring; except that the term "pollutant or contaminant" shall not include petroleum, including crude oil or any fraction thereof which is not otherwise specifically listed or designated as a hazardous substance under subparagraphs (A) through (F) of paragraph (14) and shall not include natural gas, liquefied natural gas, or synthetic gas of pipeline quality (or mixtures of natural gas and such synthetic gas).
(34) The term "alternative water supplies" includes, but is not limited to, drinking water and household water supplies.
(35)(A) The term "contractual relationship", for the purpose of
(i) At the time the defendant acquired the facility the defendant did not know and had no reason to know that any hazardous substance which is the subject of the release or threatened release was disposed of on, in, or at the facility.
(ii) The defendant is a government entity which acquired the facility by escheat, or through any other involuntary transfer or acquisition, or through the exercise of eminent domain authority by purchase or condemnation.
(iii) The defendant acquired the facility by inheritance or bequest.
In addition to establishing the foregoing, the defendant must establish that the defendant has satisfied the requirements of section 9607(b)(3)(a) and (b) of this title, provides full cooperation, assistance, and facility access to the persons that are authorized to conduct response actions at the facility (including the cooperation and access necessary for the installation, integrity, operation, and maintenance of any complete or partial response action at the facility), is in compliance with any land use restrictions established or relied on in connection with the response action at a facility, and does not impede the effectiveness or integrity of any institutional control employed at the facility in connection with a response action.
(B)
(i)
(I) on or before the date on which the defendant acquired the facility, the defendant carried out all appropriate inquiries, as provided in clauses (ii) and (iv), into the previous ownership and uses of the facility in accordance with generally accepted good commercial and customary standards and practices; and
(II) the defendant took reasonable steps to—
(aa) stop any continuing release;
(bb) prevent any threatened future release; and
(cc) prevent or limit any human, environmental, or natural resource exposure to any previously released hazardous substance.
(ii)
(iii)
(I) The results of an inquiry by an environmental professional.
(II) Interviews with past and present owners, operators, and occupants of the facility for the purpose of gathering information regarding the potential for contamination at the facility.
(III) Reviews of historical sources, such as chain of title documents, aerial photographs, building department records, and land use records, to determine previous uses and occupancies of the real property since the property was first developed.
(IV) Searches for recorded environmental cleanup liens against the facility that are filed under Federal, State, or local law.
(V) Reviews of Federal, State, and local government records, waste disposal records, underground storage tank records, and hazardous waste handling, generation, treatment, disposal, and spill records, concerning contamination at or near the facility.
(VI) Visual inspections of the facility and of adjoining properties.
(VII) Specialized knowledge or experience on the part of the defendant.
(VIII) The relationship of the purchase price to the value of the property, if the property was not contaminated.
(IX) Commonly known or reasonably ascertainable information about the property.
(X) The degree of obviousness of the presence or likely presence of contamination at the property, and the ability to detect the contamination by appropriate investigation.
(iv)
(I)
(aa) any specialized knowledge or experience on the part of the defendant;
(bb) the relationship of the purchase price to the value of the property, if the property was not contaminated;
(cc) commonly known or reasonably ascertainable information about the property;
(dd) the obviousness of the presence or likely presence of contamination at the property; and
(ee) the ability of the defendant to detect the contamination by appropriate inspection.
(II)
(v)
(C) Nothing in this paragraph or in
(D) Nothing in this paragraph shall affect the liability under this chapter of a defendant who, by any act or omission, caused or contributed to the release or threatened release of a hazardous substance which is the subject of the action relating to the facility.
(36) The term "Indian tribe" means any Indian tribe, band, nation, or other organized group or community, including any Alaska Native village but not including any Alaska Native regional or village corporation, which is recognized as eligible for the special programs and services provided by the United States to Indians because of their status as Indians.
(37)(A) The term "service station dealer" means any person—
(i) who owns or operates a motor vehicle service station, filling station, garage, or similar retail establishment engaged in the business of selling, repairing, or servicing motor vehicles, where a significant percentage of the gross revenue of the establishment is derived from the fueling, repairing, or servicing of motor vehicles, and
(ii) who accepts for collection, accumulation, and delivery to an oil recycling facility, recycled oil that (I) has been removed from the engine of a light duty motor vehicle or household appliances by the owner of such vehicle or appliances, and (II) is presented, by such owner, to such person for collection, accumulation, and delivery to an oil recycling facility.
(B) For purposes of
(C) The President shall promulgate regulations regarding the determination of what constitutes a significant percentage of the gross revenues of an establishment for purposes of this paragraph.
(38) The term "incineration vessel" means any vessel which carries hazardous substances for the purpose of incineration of such substances, so long as such substances or residues of such substances are on board.
(39)
(A)
(B)
(i) a facility that is the subject of a planned or ongoing removal action under this subchapter;
(ii) a facility that is listed on the National Priorities List or is proposed for listing;
(iii) a facility that is the subject of a unilateral administrative order, a court order, an administrative order on consent or judicial consent decree that has been issued to or entered into by the parties under this chapter;
(iv) a facility that is the subject of a unilateral administrative order, a court order, an administrative order on consent or judicial consent decree that has been issued to or entered into by the parties, or a facility to which a permit has been issued by the United States or an authorized State under the Solid Waste Disposal Act (
(v) a facility that—
(I) is subject to corrective action under section 3004(u) or 3008(h) of the Solid Waste Disposal Act (
(II) to which a corrective action permit or order has been issued or modified to require the implementation of corrective measures;
(vi) a land disposal unit with respect to which—
(I) a closure notification under subtitle C of the Solid Waste Disposal Act (
(II) closure requirements have been specified in a closure plan or permit;
(vii) a facility that is subject to the jurisdiction, custody, or control of a department, agency, or instrumentality of the United States, except for land held in trust by the United States for an Indian tribe;
(viii) a portion of a facility—
(I) at which there has been a release of polychlorinated biphenyls; and
(II) that is subject to remediation under the Toxic Substances Control Act (
(ix) a portion of a facility, for which portion, assistance for response activity has been obtained under subtitle I of the Solid Waste Disposal Act (
(C)
(D)
(i) meets the definition of "brownfield site" under subparagraphs (A) through (C); and
(ii)(I) is contaminated by a controlled substance (as defined in
(II)(aa) is contaminated by petroleum or a petroleum product excluded from the definition of "hazardous substance" under this section; and
(bb) is a site for which there is no viable responsible party and that is determined by the Administrator or the State, as appropriate, to be a site that will be assessed, investigated, or cleaned up by a person that is not potentially liable for cleaning up the site under this chapter or any other law pertaining to the cleanup of petroleum products; and
(cc) is not subject to any order issued under section 9003(h) of the Solid Waste Disposal Act (
(III) is mine-scarred land.
(40)
(A)
(i) a person who—
(I) acquires ownership of the facility after January 11, 2002; and
(II) establishes by a preponderance of the evidence each of the criteria described in clauses (i) through (viii) of subparagraph (B); and
(ii) a person—
(I) who acquires a leasehold interest in the facility after January 11, 2002;
(II) who establishes by a preponderance of the evidence that the leasehold interest is not designed to avoid liability under this chapter by any person; and
(III) with respect to whom any of the following conditions apply:
(aa) The owner of the facility that is subject to the leasehold interest is a person described in clause (i).
(bb)(AA) The owner of the facility that is subject to the leasehold interest was a person described in clause (i) at the time the leasehold interest was acquired, but can no longer establish by a preponderance of the evidence each of the criteria described in clauses (i) through (viii) of subparagraph (B) due to circumstances unrelated to any action of the person who holds the leasehold interest; and
(BB) the person who holds the leasehold interest establishes by a preponderance of the evidence each of the criteria described in clauses (i), (iii), (iv), (v), (vi), (vii), and (viii) of subparagraph (B).
(cc) The person who holds the leasehold interest establishes by a preponderance of the evidence each of the criteria described in clauses (i) through (viii) of subparagraph (B).
(B)
(i)
(ii)
(I)
(II)
(III)
(iii)
(iv)
(I) stop any continuing release;
(II) prevent any threatened future release; and
(III) prevent or limit human, environmental, or natural resource exposure to any previously released hazardous substance.
(v)
(vi)
(I) is in compliance with any land use restrictions established or relied on in connection with the response action at a vessel or facility; and
(II) does not impede the effectiveness or integrity of any institutional control employed at the vessel or facility in connection with a response action.
(vii)
(viii)
(I) potentially liable, or affiliated with any other person that is potentially liable, for response costs at a facility through—
(aa) any direct or indirect familial relationship; or
(bb) any contractual, corporate, or financial relationship (other than a contractual, corporate, or financial relationship that is created by the instruments by which title to the facility is conveyed or financed, by a tenancy, by the instruments by which a leasehold interest in the facility is created, or by a contract for the sale of goods or services); or
(II) the result of a reorganization of a business entity that was potentially liable.
(41)
(A)
(B)
(i) notwithstanding paragraph (39)(B)(ix), a portion of a facility, for which portion assistance for response activity has been obtained under subtitle I of the Solid Waste Disposal Act (
(ii) a site for which, notwithstanding the exclusions provided in subparagraph (C) or paragraph (39)(B), the President determines, on a site-by-site basis and after consultation with the State, that limitations on enforcement under
(I) protect human health and the environment; and
(II) promote economic development or facilitate the creation of, preservation of, or addition to a park, a greenway, undeveloped property, recreational property, or other property used for nonprofit purposes.
(C)
(i) a facility for which the President—
(I) conducts or has conducted a preliminary assessment or site inspection; and
(II) after consultation with the State, determines or has determined that the site obtains a preliminary score sufficient for possible listing on the National Priorities List, or that the site otherwise qualifies for listing on the National Priorities List; unless the President has made a determination that no further Federal action will be taken; or
(ii) facilities that the President determines warrant particular consideration as identified by regulation, such as sites posing a threat to a sole-source drinking water aquifer or a sensitive ecosystem.
(
Editorial Notes
References in Text
This chapter, referred to in pars. (5), (13), (20)(D), (G), (35)(C), (D), (39)(B)(iii), (D)(ii)(II)(bb), and (40)(A)(ii)(II), (B)(vii), was in the original "this Act", meaning
The Safe Drinking Water Act, referred to in pars. (7), (10), and (39)(B)(iv), is title XIV of act July 1, 1944, as added Dec. 16, 1974,
The Magnuson-Stevens Fishery Conservation and Management Act, referred to in pars. (8) and (16), is
The Clean Air Act, referred to in par. (10), is act July 14, 1955, ch. 360, as amended generally by
The Atomic Energy Act of 1954, referred to in pars. (10) and (22), is act Aug. 1, 1946, ch. 724, as added by act Aug. 30, 1954, ch. 1073, §1,
The Solid Waste Disposal Act, referred to in pars. (14), (39)(B)(iv), (vi)(I), (ix), and (41)(B)(i), is title II of
The Alaska Native Claims Settlement Act, referred to in par. (20)(E), is
The Farm Credit Act of 1971, referred to in par. (20)(H)(iv)(III), is
The Disaster Relief and Emergency Assistance Act, referred to in par. (23), is
The Federal Water Pollution Control Act, referred to in pars. (31) and (39)(B)(iv), is act June 30, 1948, ch. 758, as amended generally by
The Toxic Substances Control Act, referred to in par. (39)(B)(iv), (viii)(II), is
Amendments
2018—Par. (20)(D).
Par. (20)(E), (F).
Par. (20)(G).
Par. (20)(H).
Par. (39)(D)(ii)(II)(bb).
"(AA) of relatively low risk, as compared with other petroleum-only sites in the State; and
"(BB) a site for which there is no viable responsible party and which will be assessed, investigated, or cleaned up by a person that is not potentially liable for cleaning up the site; and".
Par. (40).
Par. (40)(B).
Par. (40)(H)(i)(II).
2002—Par. (35)(A).
Par. (35)(B).
Par. (39).
Par. (40).
Par. (41).
1999—Par. (20)(D).
1996—Pars. (8), (16).
Par. (20)(E) to (G).
Par. (26).
1994—Par. (26).
1988—Par. (23).
1986—
Pars. (1) to (10).
Par. (11).
Pars. (12) to (15).
Par. (16).
Pars. (17) to (19).
Par. (20)(A).
Par. (20)(B), (C).
Par. (20)(D).
Par. (21).
Par. (22).
Par. (23).
Par. (24).
Par. (25).
Pars. (26), (27).
Par. (28).
Par. (29).
Par. (30).
Par. (31).
Par. (32).
Pars. (33) to (36).
Par. (37).
Par. (38).
1980—Pars. (8), (16).
Statutory Notes and Related Subsidiaries
Effective Date of 1996 Amendment
Amendment by section 2502(b) of
Effective Date of 1986 Amendment
Amendment by section 517(c)(2) of
Effective Date of 1980 Amendment
Short Title of 2018 Amendment
Short Title of 2002 Amendments
Short Title of 1996 Amendment
Short Title of 1992 Amendment
Short Title of 1986 Amendment
Short Title
Definitions
"(1) CERCLA.—The term 'CERCLA' means the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (
"(2)
Executive Documents
Transfer of Functions
For transfer of certain functions from Nuclear Regulatory Commission to Chairman thereof, see Reorg. Plan No. 1 of 1980, 45 F.R. 40561,
Territorial Sea and Contiguous Zone of United States
For extension of territorial sea and contiguous zone of United States, see Proc. No. 5928 and Proc. No. 7219, respectively, set out as notes under
1 So in original. Probably should be "or".
2 So in original. Probably should be "mean".
4 See References in Text note below.
§9602. Designation of additional hazardous substances and establishment of reportable released quantities; regulations
(a) The Administrator shall promulgate and revise as may be appropriate, regulations designating as hazardous substances, in addition to those referred to in
(b) Unless and until superseded by regulations establishing a reportable quantity under subsection (a) of this section for any hazardous substance as defined in
(
Editorial Notes
Amendments
1986—Subsec. (a).
§9603. Notification requirements respecting released substances
(a) Notice to National Response Center upon release from vessel or offshore or onshore facility by person in charge; conveyance of notice by Center
Any person in charge of a vessel or an offshore or an onshore facility shall, as soon as he has knowledge of any release (other than a federally permitted release) of a hazardous substance from such vessel or facility in quantities equal to or greater than those determined pursuant to
(b) Penalties for failure to notify; use of notice or information pursuant to notice in criminal case
Any person—
(1) in charge of a vessel from which a hazardous substance is released, other than a federally permitted release, into or upon the navigable waters of the United States, adjoining shorelines, or into or upon the waters of the contiguous zone, or
(2) in charge of a vessel from which a hazardous substance is released, other than a federally permitted release, which may affect natural resources belonging to, appertaining to, or under the exclusive management authority of the United States (including resources under the Magnuson-Stevens Fishery Conservation and Management Act [
(3) in charge of a facility from which a hazardous substance is released, other than a federally permitted release,
in a quantity equal to or greater than that determined pursuant to
(c) Notice to Administrator of EPA of existence of storage, etc., facility by owner or operator; exception; time, manner, and form of notice; penalties for failure to notify; use of notice or information pursuant to notice in criminal case
Within one hundred and eighty days after December 11, 1980, any person who owns or operates or who at the time of disposal owned or operated, or who accepted hazardous substances for transport and selected, a facility at which hazardous substances (as defined in
(d) Recordkeeping requirements; promulgation of rules and regulations by Administrator of EPA; penalties for violations; waiver of retention requirements
(1) The Administrator of the Environmental Protection Agency is authorized to promulgate rules and regulations specifying, with respect to—
(A) the location, title, or condition of a facility, and
(B) the identity, characteristics, quantity, origin, or condition (including containerization and previous treatment) of any hazardous substances contained or deposited in a facility;
the records which shall be retained by any person required to provide the notification of a facility set out in subsection (c) of this section. Such specification shall be in accordance with the provisions of this subsection.
(2) Beginning with December 11, 1980, for fifty years thereafter or for fifty years after the date of establishment of a record (whichever is later), or at any such earlier time as a waiver if obtained under paragraph (3) of this subsection, it shall be unlawful for any such person knowingly to destroy, mutilate, erase, dispose of, conceal, or otherwise render unavailable or unreadable or falsify any records identified in paragraph (1) of this subsection. Any person who violates this paragraph shall, upon conviction, be fined in accordance with the applicable provisions of title 18 or imprisoned for not more than 3 years (or not more than 5 years in the case of a second or subsequent conviction), or both.
(3) At any time prior to the date which occurs fifty years after December 11, 1980, any person identified under paragraph (1) of this subsection may apply to the Administrator of the Environmental Protection Agency for a waiver of the provisions of the first sentence of paragraph (2) of this subsection. The Administrator is authorized to grant such waiver if, in his discretion, such waiver would not unreasonably interfere with the attainment of the purposes and provisions of this chapter. The Administrator shall promulgate rules and regulations regarding such a waiver so as to inform parties of the proper application procedure and conditions for approval of such a waiver.
(4) Notwithstanding the provisions of this subsection, the Administrator of the Environmental Protection Agency may in his discretion require any such person to retain any record identified pursuant to paragraph (1) of this subsection for such a time period in excess of the period specified in paragraph (2) of this subsection as the Administrator determines to be necessary to protect the public health or welfare.
(e) Applicability to registered pesticide products and air emissions from animal waste at farms
(1) In general
This section shall not apply to—
(A) the application of a pesticide product registered under the Federal Insecticide, Fungicide, and Rodenticide Act (
(B) air emissions from animal waste (including decomposing animal waste) at a farm.
(2) Definitions
In this subsection:
(A) Animal waste
(i) In general
The term "animal waste" means feces, urine, or other excrement, digestive emission, urea, or similar substances emitted by animals (including any form of livestock, poultry, or fish).
(ii) Inclusions
The term "animal waste" includes animal waste that is mixed or commingled with bedding, compost, feed, soil, or any other material typically found with such waste.
(B) Farm
The term "farm" means a site or area (including associated structures) that—
(i) is used for—
(I) the production of a crop; or
(II) the raising or selling of animals (including any form of livestock, poultry, or fish); and
(ii) under normal conditions, produces during a farm year any agricultural products with a total value equal to not less than $1,000.
(f) Exemptions from notice and penalty provisions for substances reported under other Federal law or is in continuous release, etc.
No notification shall be required under subsection (a) or (b) of this section for any release of a hazardous substance—
(1) which is required to be reported (or specifically exempted from a requirement for reporting) under subtitle C of the Solid Waste Disposal Act [
(2) which is a continuous release, stable in quantity and rate, and is—
(A) from a facility for which notification has been given under subsection (c) of this section, or
(B) a release of which notification has been given under subsections (a) and (b) of this section for a period sufficient to establish the continuity, quantity, and regularity of such release:
Provided, That notification in accordance with subsections (a) and (b) of this paragraph shall be given for releases subject to this paragraph annually, or at such time as there is any statistically significant increase in the quantity of any hazardous substance or constituent thereof released, above that previously reported or occurring.
(
Editorial Notes
References in Text
The Clean Water Act, referred to in subsec. (a), is act June 30, 1948, ch. 758, as amended generally by
The Magnuson-Stevens Fishery Conservation and Management Act, referred to in subsec. (b)(2), is
The Solid Waste Disposal Act, referred to in subsecs. (c) and (f)(1), is title II of
This chapter, referred to in subsec. (d)(3), was in the original "this Act", meaning
The Federal Insecticide, Fungicide, and Rodenticide Act, referred to in subsec. (e)(1)(A), is act June 25, 1947, ch. 125, as amended generally by
Amendments
2018—Subsec. (e).
1996—Subsec. (b)(2).
1986—Subsec. (b).
Subsec. (d)(2).
1980—Subsec. (b)(2).
Statutory Notes and Related Subsidiaries
Effective Date of 1996 Amendment
Effective Date of 1980 Amendment
Application
Executive Documents
Contiguous Zone of United States
For extension of contiguous zone of United States, see Proc. No. 7219, set out as a note under
§9604. Response authorities
(a) Removal and other remedial action by President; applicability of national contingency plan; response by potentially responsible parties; public health threats; limitations on response; exception
(1) Whenever (A) any hazardous substance is released or there is a substantial threat of such a release into the environment, or (B) there is a release or substantial threat of release into the environment of any pollutant or contaminant which may present an imminent and substantial danger to the public health or welfare, the President is authorized to act, consistent with the national contingency plan, to remove or arrange for the removal of, and provide for remedial action relating to such hazardous substance, pollutant, or contaminant at any time (including its removal from any contaminated natural resource), or take any other response measure consistent with the national contingency plan which the President deems necessary to protect the public health or welfare or the environment. When the President determines that such action will be done properly and promptly by the owner or operator of the facility or vessel or by any other responsible party, the President may allow such person to carry out the action, conduct the remedial investigation, or conduct the feasibility study in accordance with
(2)
(3)
(A) of a naturally occurring substance in its unaltered form, or altered solely through naturally occurring processes or phenomena, from a location where it is naturally found;
(B) from products which are part of the structure of, and result in exposure within, residential buildings or business or community structures; or
(C) into public or private drinking water supplies due to deterioration of the system through ordinary use.
(4)
(b) Investigations, monitoring, coordination, etc., by President
(1) Information; studies and investigations
Whenever the President is authorized to act pursuant to subsection (a) of this section, or whenever the President has reason to believe that a release has occurred or is about to occur, or that illness, disease, or complaints thereof may be attributable to exposure to a hazardous substance, pollutant, or contaminant and that a release may have occurred or be occurring, he may undertake such investigations, monitoring, surveys, testing, and other information gathering as he may deem necessary or appropriate to identify the existence and extent of the release or threat thereof, the source and nature of the hazardous substances, pollutants or contaminants involved, and the extent of danger to the public health or welfare or to the environment. In addition, the President may undertake such planning, legal, fiscal, economic, engineering, architectural, and other studies or investigations as he may deem necessary or appropriate to plan and direct response actions, to recover the costs thereof, and to enforce the provisions of this chapter.
(2) Coordination of investigations
The President shall promptly notify the appropriate Federal and State natural resource trustees of potential damages to natural resources resulting from releases under investigation pursuant to this section and shall seek to coordinate the assessments, investigations, and planning under this section with such Federal and State trustees.
(c) Criteria for continuance of obligations from Fund over specified amount for response actions; consultation by President with affected States; contracts or cooperative agreements by States with President prior to remedial actions; cost-sharing agreements; selection by President of remedial actions; State credits: granting of credit, expenses before listing or agreement, response actions between 1978 and 1980, State expenses after December 11, 1980, in excess of 10 percent of costs, item-by-item approval, use of credits; operation and maintenance; limitation on source of funds for O&M; recontracting; siting
(1) Unless (A) the President finds that (i) continued response actions are immediately required to prevent, limit, or mitigate an emergency, (ii) there is an immediate risk to public health or welfare or the environment, and (iii) such assistance will not otherwise be provided on a timely basis, or (B) the President has determined the appropriate remedial actions pursuant to paragraph (2) of this subsection and the State or States in which the source of the release is located have complied with the requirements of paragraph (3) of this subsection, or (C) continued response action is otherwise appropriate and consistent with the remedial action to be taken 1 obligations from the Fund, other than those authorized by subsection (b) of this section, shall not continue after $2,000,000 has been obligated for response actions or 12 months has elapsed from the date of initial response to a release or threatened release of hazardous substances.
(2) The President shall consult with the affected State or States before determining any appropriate remedial action to be taken pursuant to the authority granted under subsection (a) of this section.
(3) The President shall not provide any remedial actions pursuant to this section unless the State in which the release occurs first enters into a contract or cooperative agreement with the President providing assurances deemed adequate by the President that (A) the State will assure all future maintenance of the removal and remedial actions provided for the expected life of such actions as determined by the President; (B) the State will assure the availability of a hazardous waste disposal facility acceptable to the President and in compliance with the requirements of subtitle C of the Solid Waste Disposal Act [
(4)
(5)
(A)
(B)
(i) after such expenses are incurred the facility is listed on such list and a contract or cooperative agreement is entered into for the facility, and
(ii) the President determines that such expenses would have been credited to the State under subparagraph (A) had the expenditures been made after listing of the facility on such list and after the date on which such contract or cooperative agreement is entered into.
(C)
(D)
(E)
(F)
(6)
(7)
(8)
(9)
(A) have adequate capacity for the destruction, treatment, or secure disposition of all hazardous wastes that are reasonably expected to be generated within the State during the 20-year period following the date of such contract or cooperative agreement and to be disposed of, treated, or destroyed,
(B) are within the State or outside the State in accordance with an interstate agreement or regional agreement or authority,
(C) are acceptable to the President, and
(D) are in compliance with the requirements of subtitle C of the Solid Waste Disposal Act [
(d) Contracts or cooperative agreements by President with States or political subdivisions or Indian tribes; State applications, terms and conditions; reimbursements; cost-sharing provisions; enforcement requirements and procedures
(1)
(A)
(B)
(C)
(2) If the President enters into a cost-sharing agreement pursuant to subsection (c) of this section or a contract or cooperative agreement pursuant to this subsection, and the State or political subdivision thereof fails to comply with any requirements of the contract, the President may, after providing sixty days notice, seek in the appropriate Federal district court to enforce the contract or to recover any funds advanced or any costs incurred because of the breach of the contract by the State or political subdivision.
(3) Where a State or a political subdivision thereof is acting in behalf of the President, the President is authorized to provide technical and legal assistance in the administration and enforcement of any contract or subcontract in connection with response actions assisted under this subchapter, and to intervene in any civil action involving the enforcement of such contract or subcontract.
(4) Where two or more noncontiguous facilities are reasonably related on the basis of geography, or on the basis of the threat, or potential threat to the public health or welfare or the environment, the President may, in his discretion, treat these related facilities as one for purposes of this section.
(e) Information gathering and access
(1) Action authorized
Any officer, employee, or representative of the President, duly designated by the President, is authorized to take action under paragraph (2), (3), or (4) (or any combination thereof) at a vessel, facility, establishment, place, property, or location or, in the case of paragraph (3) or (4), at any vessel, facility, establishment, place, property, or location which is adjacent to the vessel, facility, establishment, place, property, or location referred to in such paragraph (3) or (4). Any duly designated officer, employee, or representative of a State or political subdivision under a contract or cooperative agreement under subsection (d)(1) is also authorized to take such action. The authority of paragraphs (3) and (4) may be exercised only if there is a reasonable basis to believe there may be a release or threat of release of a hazardous substance or pollutant or contaminant. The authority of this subsection may be exercised only for the purposes of determining the need for response, or choosing or taking any response action under this subchapter, or otherwise enforcing the provisions of this subchapter.
(2) Access to information
Any officer, employee, or representative described in paragraph (1) may require any person who has or may have information relevant to any of the following to furnish, upon reasonable notice, information or documents relating to such matter:
(A) The identification, nature, and quantity of materials which have been or are generated, treated, stored, or disposed of at a vessel or facility or transported to a vessel or facility.
(B) The nature or extent of a release or threatened release of a hazardous substance or pollutant or contaminant at or from a vessel or facility.
(C) Information relating to the ability of a person to pay for or to perform a cleanup.
In addition, upon reasonable notice, such person either (i) shall grant any such officer, employee, or representative access at all reasonable times to any vessel, facility, establishment, place, property, or location to inspect and copy all documents or records relating to such matters or (ii) shall copy and furnish to the officer, employee, or representative all such documents or records, at the option and expense of such person.
(3) Entry
Any officer, employee, or representative described in paragraph (1) is authorized to enter at reasonable times any of the following:
(A) Any vessel, facility, establishment, or other place or property where any hazardous substance or pollutant or contaminant may be or has been generated, stored, treated, disposed of, or transported from.
(B) Any vessel, facility, establishment, or other place or property from which or to which a hazardous substance or pollutant or contaminant has been or may have been released.
(C) Any vessel, facility, establishment, or other place or property where such release is or may be threatened.
(D) Any vessel, facility, establishment, or other place or property where entry is needed to determine the need for response or the appropriate response or to effectuate a response action under this subchapter.
(4) Inspection and samples
(A) Authority
Any officer, employee or representative described in paragraph (1) is authorized to inspect and obtain samples from any vessel, facility, establishment, or other place or property referred to in paragraph (3) or from any location of any suspected hazardous substance or pollutant or contaminant. Any such officer, employee, or representative is authorized to inspect and obtain samples of any containers or labeling for suspected hazardous substances or pollutants or contaminants. Each such inspection shall be completed with reasonable promptness.
(B) Samples
If the officer, employee, or representative obtains any samples, before leaving the premises he shall give to the owner, operator, tenant, or other person in charge of the place from which the samples were obtained a receipt describing the sample obtained and, if requested, a portion of each such sample. A copy of the results of any analysis made of such samples shall be furnished promptly to the owner, operator, tenant, or other person in charge, if such person can be located.
(5) Compliance orders
(A) Issuance
If consent is not granted regarding any request made by an officer, employee, or representative under paragraph (2), (3), or (4), the President may issue an order directing compliance with the request. The order may be issued after such notice and opportunity for consultation as is reasonably appropriate under the circumstances.
(B) Compliance
The President may ask the Attorney General to commence a civil action to compel compliance with a request or order referred to in subparagraph (A). Where there is a reasonable basis to believe there may be a release or threat of a release of a hazardous substance or pollutant or contaminant, the court shall take the following actions:
(i) In the case of interference with entry or inspection, the court shall enjoin such interference or direct compliance with orders to prohibit interference with entry or inspection unless under the circumstances of the case the demand for entry or inspection is arbitrary and capricious, an abuse of discretion, or otherwise not in accordance with law.
(ii) In the case of information or document requests or orders, the court shall enjoin interference with such information or document requests or orders or direct compliance with the requests or orders to provide such information or documents unless under the circumstances of the case the demand for information or documents is arbitrary and capricious, an abuse of discretion, or otherwise not in accordance with law.
The court may assess a civil penalty not to exceed $25,000 for each day of noncompliance against any person who unreasonably fails to comply with the provisions of paragraph (2), (3), or (4) or an order issued pursuant to subparagraph (A) of this paragraph.
(6) Other authority
Nothing in this subsection shall preclude the President from securing access or obtaining information in any other lawful manner.
(7) Confidentiality of information
(A) Any records, reports, or information obtained from any person under this section (including records, reports, or information obtained by representatives of the President) shall be available to the public, except that upon a showing satisfactory to the President (or the State, as the case may be) by any person that records, reports, or information, or particular part thereof (other than health or safety effects data), to which the President (or the State, as the case may be) or any officer, employee, or representative has access under this section if made public would divulge information entitled to protection under
(B) Any person not subject to the provisions of
(C) In submitting data under this chapter, a person required to provide such data may (i) designate the data which such person believes is entitled to protection under this subsection and (ii) submit such designated data separately from other data submitted under this chapter. A designation under this paragraph shall be made in writing and in such manner as the President may prescribe by regulation.
(D) Notwithstanding any limitation contained in this section or any other provision of law, all information reported to or otherwise obtained by the President (or any representative of the President) under this chapter shall be made available, upon written request of any duly authorized committee of the Congress, to such committee.
(E) No person required to provide information under this chapter may claim that the information is entitled to protection under this paragraph unless such person shows each of the following:
(i) Such person has not disclosed the information to any other person, other than a member of a local emergency planning committee established under title III of the Amendments and Reauthorization Act of 1986 [
(ii) The information is not required to be disclosed, or otherwise made available, to the public under any other Federal or State law.
(iii) Disclosure of the information is likely to cause substantial harm to the competitive position of such person.
(iv) The specific chemical identity, if sought to be protected, is not readily discoverable through reverse engineering.
(F) The following information with respect to any hazardous substance at the facility or vessel shall not be entitled to protection under this paragraph:
(i) The trade name, common name, or generic class or category of the hazardous substance.
(ii) The physical properties of the substance, including its boiling point, melting point, flash point, specific gravity, vapor density, solubility in water, and vapor pressure at 20 degrees celsius.
(iii) The hazards to health and the environment posed by the substance, including physical hazards (such as explosion) and potential acute and chronic health hazards.
(iv) The potential routes of human exposure to the substance at the facility, establishment, place, or property being investigated, entered, or inspected under this subsection.
(v) The location of disposal of any waste stream.
(vi) Any monitoring data or analysis of monitoring data pertaining to disposal activities.
(vii) Any hydrogeologic or geologic data.
(viii) Any groundwater monitoring data.
(f) Contracts for response actions; compliance with Federal health and safety standards
In awarding contracts to any person engaged in response actions, the President or the State, in any case where it is awarding contracts pursuant to a contract entered into under subsection (d) of this section, shall require compliance with Federal health and safety standards established under
(g) Rates for wages and labor standards applicable to covered work
(1) All laborers and mechanics employed by contractors or subcontractors in the performance of construction, repair, or alteration work funded in whole or in part under this section or
(2) The Secretary of Labor shall have, with respect to the labor standards specified in paragraph (1), the authority and functions set forth in Reorganization Plan Numbered 14 of 1950 (15 F.R. 3176;
(h) Emergency procurement powers; exercise by President
Notwithstanding any other provision of law, subject to the provisions of
(i) Agency for Toxic Substances and Disease Registry; establishment, functions, etc.
(1) There is hereby established within the Public Health Service an agency, to be known as the Agency for Toxic Substances and Disease Registry, which shall report directly to the Surgeon General of the United States. The Administrator of said Agency shall, with the cooperation of the Administrator of the Environmental Protection Agency, the Commissioner of the Food and Drug Administration, the Directors of the National Institute of Medicine, National Institute of Environmental Health Sciences, National Institute of Occupational Safety and Health, Centers for Disease Control and Prevention, the Administrator of the Occupational Safety and Health Administration, the Administrator of the Social Security Administration, the Secretary of Transportation, and appropriate State and local health officials, effectuate and implement the health related authorities of this chapter. In addition, said Administrator shall—
(A) in cooperation with the States, establish and maintain a national registry of serious diseases and illnesses and a national registry of persons exposed to toxic substances;
(B) establish and maintain inventory of literature, research, and studies on the health effects of toxic substances;
(C) in cooperation with the States, and other agencies of the Federal Government, establish and maintain a complete listing of areas closed to the public or otherwise restricted in use because of toxic substance contamination;
(D) in cases of public health emergencies caused or believed to be caused by exposure to toxic substances, provide medical care and testing to exposed individuals, including but not limited to tissue sampling, chromosomal testing where appropriate, epidemiological studies, or any other assistance appropriate under the circumstances; and
(E) either independently or as part of other health status survey, conduct periodic survey and screening programs to determine relationships between exposure to toxic substances and illness. In cases of public health emergencies, exposed persons shall be eligible for admission to hospitals and other facilities and services operated or provided by the Public Health Service.
(2)(A) Within 6 months after October 17, 1986, the Administrator of the Agency for Toxic Substances and Disease Registry (ATSDR) and the Administrator of the Environmental Protection Agency ("EPA") shall prepare a list, in order of priority, of at least 100 hazardous substances which are most commonly found at facilities on the National Priorities List and which, in their sole discretion, they determine are posing the most significant potential threat to human health due to their known or suspected toxicity to humans and the potential for human exposure to such substances at facilities on the National Priorities List or at facilities to which a response to a release or a threatened release under this section is under consideration.
(B) Within 24 months after October 17, 1986, the Administrator of ATSDR and the Administrator of EPA shall revise the list prepared under subparagraph (A). Such revision shall include, in order of priority, the addition of 100 or more such hazardous substances. In each of the 3 consecutive 12-month periods that follow, the Administrator of ATSDR and the Administrator of EPA shall revise, in the same manner as provided in the 2 preceding sentences, such list to include not fewer than 25 additional hazardous substances per revision. The Administrator of ATSDR and the Administrator of EPA shall not less often than once every year thereafter revise such list to include additional hazardous substances in accordance with the criteria in subparagraph (A).
(3) Based on all available information, including information maintained under paragraph (1)(B) and data developed and collected on the health effects of hazardous substances under this paragraph, the Administrator of ATSDR shall prepare toxicological profiles of each of the substances listed pursuant to paragraph (2). The toxicological profiles shall be prepared in accordance with guidelines developed by the Administrator of ATSDR and the Administrator of EPA. Such profiles shall include, but not be limited to each of the following:
(A) An examination, summary, and interpretation of available toxicological information and epidemiologic evaluations on a hazardous substance in order to ascertain the levels of significant human exposure for the substance and the associated acute, subacute, and chronic health effects.
(B) A determination of whether adequate information on the health effects of each substance is available or in the process of development to determine levels of exposure which present a significant risk to human health of acute, subacute, and chronic health effects.
(C) Where appropriate, an identification of toxicological testing needed to identify the types or levels of exposure that may present significant risk of adverse health effects in humans.
Any toxicological profile or revision thereof shall reflect the Administrator of ATSDR's assessment of all relevant toxicological testing which has been peer reviewed. The profiles required to be prepared under this paragraph for those hazardous substances listed under subparagraph (A) of paragraph (2) shall be completed, at a rate of no fewer than 25 per year, within 4 years after October 17, 1986. A profile required on a substance listed pursuant to subparagraph (B) of paragraph (2) shall be completed within 3 years after addition to the list. The profiles prepared under this paragraph shall be of those substances highest on the list of priorities under paragraph (2) for which profiles have not previously been prepared. Profiles required under this paragraph shall be revised and republished as necessary, but no less often than once every 3 years. Such profiles shall be provided to the States and made available to other interested parties.
(4) The Administrator of the ATSDR shall provide consultations upon request on health issues relating to exposure to hazardous or toxic substances, on the basis of available information, to the Administrator of EPA, State officials, and local officials. Such consultations to individuals may be provided by States under cooperative agreements established under this chapter.
(5)(A) For each hazardous substance listed pursuant to paragraph (2), the Administrator of ATSDR (in consultation with the Administrator of EPA and other agencies and programs of the Public Health Service) shall assess whether adequate information on the health effects of such substance is available. For any such substance for which adequate information is not available (or under development), the Administrator of ATSDR, in cooperation with the Director of the National Toxicology Program, shall assure the initiation of a program of research designed to determine the health effects (and techniques for development of methods to determine such health effects) of such substance. Where feasible, such program shall seek to develop methods to determine the health effects of such substance in combination with other substances with which it is commonly found. Before assuring the initiation of such program, the Administrator of ATSDR shall consider recommendations of the Interagency Testing Committee established under section 4(e) of the Toxic Substances Control Act [
(i) laboratory and other studies to determine short, intermediate, and long-term health effects;
(ii) laboratory and other studies to determine organ-specific, site-specific, and system-specific acute and chronic toxicity;
(iii) laboratory and other studies to determine the manner in which such substances are metabolized or to otherwise develop an understanding of the biokinetics of such substances; and
(iv) where there is a possibility of obtaining human data, the collection of such information.
(B) In assessing the need to perform laboratory and other studies, as required by subparagraph (A), the Administrator of ATSDR shall consider—
(i) the availability and quality of existing test data concerning the substance on the suspected health effect in question;
(ii) the extent to which testing already in progress will, in a timely fashion, provide data that will be adequate to support the preparation of toxicological profiles as required by paragraph (3); and
(iii) such other scientific and technical factors as the Administrator of ATSDR may determine are necessary for the effective implementation of this subsection.
(C) In the development and implementation of any research program under this paragraph, the Administrator of ATSDR and the Administrator of EPA shall coordinate such research program implemented under this paragraph with the National Toxicology Program and with programs of toxicological testing established under the Toxic Substances Control Act [
(D) It is the sense of the Congress that the costs of research programs under this paragraph be borne by the manufacturers and processors of the hazardous substance in question, as required in programs of toxicological testing under the Toxic Substances Control Act [
(6)(A) The Administrator of ATSDR shall perform a health assessment for each facility on the National Priorities List established under
(B) The Administrator of ATSDR may perform health assessments for releases or facilities where individual persons or licensed physicians provide information that individuals have been exposed to a hazardous substance, for which the probable source of such exposure is a release. In addition to other methods (formal or informal) of providing such information, such individual persons or licensed physicians may submit a petition to the Administrator of ATSDR providing such information and requesting a health assessment. If such a petition is submitted and the Administrator of ATSDR does not initiate a health assessment, the Administrator of ATSDR shall provide a written explanation of why a health assessment is not appropriate.
(C) In determining the priority in which to conduct health assessments under this subsection, the Administrator of ATSDR, in consultation with the Administrator of EPA, shall give priority to those facilities at which there is documented evidence of the release of hazardous substances, at which the potential risk to human health appears highest, and for which in the judgment of the Administrator of ATSDR existing health assessment data are inadequate to assess the potential risk to human health as provided in subparagraph (F). In determining the priorities for conducting health assessments under this subsection, the Administrator of ATSDR shall consider the National Priorities List schedules and the needs of the Environmental Protection Agency and other Federal agencies pursuant to schedules for remedial investigation and feasibility studies.
(D) Where a health assessment is done at a site on the National Priorities List, the Administrator of ATSDR shall complete such assessment promptly and, to the maximum extent practicable, before the completion of the remedial investigation and feasibility study at the facility concerned.
(E) Any State or political subdivision carrying out a health assessment for a facility shall report the results of the assessment to the Administrator of ATSDR and the Administrator of EPA and shall include recommendations with respect to further activities which need to be carried out under this section. The Administrator of ATSDR shall state such recommendation in any report on the results of any assessment carried out directly by the Administrator of ATSDR for such facility and shall issue periodic reports which include the results of all the assessments carried out under this subsection.
(F) For the purposes of this subsection and
(G) The purpose of health assessments under this subsection shall be to assist in determining whether actions under paragraph (11) of this subsection should be taken to reduce human exposure to hazardous substances from a facility and whether additional information on human exposure and associated health risks is needed and should be acquired by conducting epidemiological studies under paragraph (7), establishing a registry under paragraph (8), establishing a health surveillance program under paragraph (9), or through other means. In using the results of health assessments for determining additional actions to be taken under this section, the Administrator of ATSDR may consider additional information on the risks to the potentially affected population from all sources of such hazardous substances including known point or nonpoint sources other than those from the facility in question.
(H) At the completion of each health assessment, the Administrator of ATSDR shall provide the Administrator of EPA and each affected State with the results of such assessment, together with any recommendations for further actions under this subsection or otherwise under this chapter. In addition, if the health assessment indicates that the release or threatened release concerned may pose a serious threat to human health or the environment, the Administrator of ATSDR shall so notify the Administrator of EPA who shall promptly evaluate such release or threatened release in accordance with the hazard ranking system referred to in
(7)(A) Whenever in the judgment of the Administrator of ATSDR it is appropriate on the basis of the results of a health assessment, the Administrator of ATSDR shall conduct a pilot study of health effects for selected groups of exposed individuals in order to determine the desirability of conducting full scale epidemiological or other health studies of the entire exposed population.
(B) Whenever in the judgment of the Administrator of ATSDR it is appropriate on the basis of the results of such pilot study or other study or health assessment, the Administrator of ATSDR shall conduct such full scale epidemiological or other health studies as may be necessary to determine the health effects on the population exposed to hazardous substances from a release or threatened release. If a significant excess of disease in a population is identified, the letter of transmittal of such study shall include an assessment of other risk factors, other than a release, that may, in the judgment of the peer review group, be associated with such disease, if such risk factors were not taken into account in the design or conduct of the study.
(8) In any case in which the results of a health assessment indicate a potential significant risk to human health, the Administrator of ATSDR shall consider whether the establishment of a registry of exposed persons would contribute to accomplishing the purposes of this subsection, taking into account circumstances bearing on the usefulness of such a registry, including the seriousness or unique character of identified diseases or the likelihood of population migration from the affected area.
(9) Where the Administrator of ATSDR has determined that there is a significant increased risk of adverse health effects in humans from exposure to hazardous substances based on the results of a health assessment conducted under paragraph (6), an epidemiologic study conducted under paragraph (7), or an exposure registry that has been established under paragraph (8), and the Administrator of ATSDR has determined that such exposure is the result of a release from a facility, the Administrator of ATSDR shall initiate a health surveillance program for such population. This program shall include but not be limited to—
(A) periodic medical testing where appropriate of population subgroups to screen for diseases for which the population or subgroup is at significant increased risk; and
(B) a mechanism to refer for treatment those individuals within such population who are screened positive for such diseases.
(10) Two years after October 17, 1986, and every 2 years thereafter, the Administrator of ATSDR shall prepare and submit to the Administrator of EPA and to the Congress a report on the results of the activities of ATSDR regarding—
(A) health assessments and pilot health effects studies conducted;
(B) epidemiologic studies conducted;
(C) hazardous substances which have been listed under paragraph (2), toxicological profiles which have been developed, and toxicologic testing which has been conducted or which is being conducted under this subsection;
(D) registries established under paragraph (8); and
(E) an overall assessment, based on the results of activities conducted by the Administrator of ATSDR, of the linkage between human exposure to individual or combinations of hazardous substances due to releases from facilities covered by this chapter or the Solid Waste Disposal Act [
(11) If a health assessment or other study carried out under this subsection contains a finding that the exposure concerned presents a significant risk to human health, the President shall take such steps as may be necessary to reduce such exposure and eliminate or substantially mitigate the significant risk to human health. Such steps may include the use of any authority under this chapter, including, but not limited to—
(A) provision of alternative water supplies, and
(B) permanent or temporary relocation of individuals.
In any case in which information is insufficient, in the judgment of the Administrator of ATSDR or the President to determine a significant human exposure level with respect to a hazardous substance, the President may take such steps as may be necessary to reduce the exposure of any person to such hazardous substance to such level as the President deems necessary to protect human health.
(12) In any case which is the subject of a petition, a health assessment or study, or a research program under this subsection, nothing in this subsection shall be construed to delay or otherwise affect or impair the authority of the President, the Administrator of ATSDR, or the Administrator of EPA to exercise any authority vested in the President, the Administrator of ATSDR or the Administrator of EPA under any other provision of law (including, but not limited to, the imminent hazard authority of section 7003 of the Solid Waste Disposal Act [
(13) All studies and results of research conducted under this subsection (other than health assessments) shall be reported or adopted only after appropriate peer review. Such peer review shall be completed, to the maximum extent practicable, within a period of 60 days. In the case of research conducted under the National Toxicology Program, such peer review may be conducted by the Board of Scientific Counselors. In the case of other research, such peer review shall be conducted by panels consisting of no less than three nor more than seven members, who shall be disinterested scientific experts selected for such purpose by the Administrator of ATSDR or the Administrator of EPA, as appropriate, on the basis of their reputation for scientific objectivity and the lack of institutional ties with any person involved in the conduct of the study or research under review. Support services for such panels shall be provided by the Agency for Toxic Substances and Disease Registry, or by the Environmental Protection Agency, as appropriate.
(14) In the implementation of this subsection and other health-related authorities of this chapter, the Administrator of ATSDR shall assemble, develop as necessary, and distribute to the States, and upon request to medical colleges, physicians, and other health professionals, appropriate educational materials (including short courses) on the medical surveillance, screening, and methods of diagnosis and treatment of injury or disease related to exposure to hazardous substances (giving priority to those listed in paragraph (2)), through such means as the Administrator of ATSDR deems appropriate.
(15) The activities of the Administrator of ATSDR described in this subsection and
(16) The President shall provide adequate personnel for ATSDR, which shall not be fewer than 100 employees. For purposes of determining the number of employees under this subsection, an employee employed by ATSDR on a part-time career employment basis shall be counted as a fraction which is determined by dividing 40 hours into the average number of hours of such employee's regularly scheduled workweek.
(17) In accordance with
(18) If the Administrator of ATSDR determines that it is appropriate for purposes of this section to treat a pollutant or contaminant as a hazardous substance, such pollutant or contaminant shall be treated as a hazardous substance for such purpose.
(j) Acquisition of property
(1) Authority
The President is authorized to acquire, by purchase, lease, condemnation, donation, or otherwise, any real property or any interest in real property that the President in his discretion determines is needed to conduct a remedial action under this chapter. There shall be no cause of action to compel the President to acquire any interest in real property under this chapter.
(2) State assurance
The President may use the authority of paragraph (1) for a remedial action only if, before an interest in real estate is acquired under this subsection, the State in which the interest to be acquired is located assures the President, through a contract or cooperative agreement or otherwise, that the State will accept transfer of the interest following completion of the remedial action.
(3) Exemption
No Federal, State, or local government agency shall be liable under this chapter solely as a result of acquiring an interest in real estate under this subsection.
(k) Brownfields revitalization funding
(1) Definition of eligible entity
In this subsection, the term "eligible entity" means—
(A) a general purpose unit of local government;
(B) a land clearance authority or other quasi-governmental entity that operates under the supervision and control of or as an agent of a general purpose unit of local government;
(C) a government entity created by a State legislature;
(D) a regional council or group of general purpose units of local government;
(E) a redevelopment agency that is chartered or otherwise sanctioned by a State;
(F) a State;
(G) an Indian Tribe other than in Alaska;
(H) an Alaska Native Regional Corporation and an Alaska Native Village Corporation as those terms are defined in the Alaska Native Claims Settlement Act (
(I) an organization described in
(J) a limited liability corporation in which all managing members are organizations described in subparagraph (I) or limited liability corporations whose sole members are organizations described in subparagraph (I);
(K) a limited partnership in which all general partners are organizations described in subparagraph (I) or limited liability corporations whose sole members are organizations described in subparagraph (I); or
(L) a qualified community development entity (as defined in
(2) Brownfield site characterization and assessment grant program
(A) Establishment of program
The Administrator shall establish a program to—
(i) provide grants to inventory, characterize, assess, and conduct planning related to brownfield sites under subparagraph (B); and
(ii) perform targeted site assessments at brownfield sites.
(B) Assistance for site characterization and assessment
(i) In general
On approval of an application made by an eligible entity, the Administrator may make a grant to the eligible entity to be used for programs to inventory, characterize, assess, and conduct planning related to one or more brownfield sites.
(ii) Site characterization and assessment
A site characterization and assessment carried out with the use of a grant under clause (i) shall be performed in accordance with
(C) Exemption for certain publicly owned brownfield sites
Notwithstanding paragraph (5)(B)(iii), an eligible entity described in any of subparagraphs (A) through (H) of paragraph (1) may receive a grant under this paragraph for property acquired by that eligible entity prior to January 11, 2002, even if the eligible entity does not qualify as a bona fide prospective purchaser, so long as the eligible entity has not caused or contributed to a release or threatened release of a hazardous substance at the property.
(3) Grants and loans for brownfield remediation
(A) Grants provided by the President
Subject to paragraphs (5) and (6), the President shall establish a program to provide grants to—
(i) eligible entities, to be used for capitalization of revolving loan funds; and
(ii) eligible entities or nonprofit organizations, where warranted, as determined by the President based on considerations under subparagraph (C), to be used directly for remediation of one or more brownfield sites owned by the entity or organization that receives the grant and in amounts not to exceed $500,000 for each site to be remediated, which limit may be waived by the Administrator, but not to exceed a total of $650,000 for each site, based on the anticipated level of contamination, size, or ownership status of the site.
(B) Loans and grants provided by eligible entities
An eligible entity that receives a grant under subparagraph (A)(i) shall use the grant funds to provide assistance for the remediation of brownfield sites in the form of—
(i) one or more loans to an eligible entity, a site owner, a site developer, or another person; or
(ii) one or more grants to an eligible entity or other nonprofit organization, where warranted, as determined by the eligible entity that is providing the assistance, based on considerations under subparagraph (C), to remediate sites owned by the eligible entity or nonprofit organization that receives the grant.
(C) Considerations
In determining whether a grant under subparagraph (A)(ii) or (B)(ii) is warranted, the President or the eligible entity, as the case may be, shall take into consideration—
(i) the extent to which a grant will facilitate the creation of, preservation of, or addition to a park, a greenway, undeveloped property, recreational property, or other property used for nonprofit purposes;
(ii) the extent to which a grant will meet the needs of a community that has an inability to draw on other sources of funding for environmental remediation and subsequent redevelopment of the area in which a brownfield site is located because of the small population or low income of the community;
(iii) the extent to which a grant will facilitate the use or reuse of existing infrastructure;
(iv) the benefit of promoting the long-term availability of funds from a revolving loan fund for brownfield remediation; and
(v) such other similar factors as the Administrator considers appropriate to consider for the purposes of this subsection.
(D) Transition
Revolving loan funds that have been established before January 11, 2002, may be used in accordance with this paragraph.
(E) Exemption for certain publicly owned brownfield sites
Notwithstanding paragraph (5)(B)(iii), an eligible entity described in any of subparagraphs (A) through (H) of paragraph (1) may receive a grant or loan under this paragraph for property acquired by that eligible entity prior to January 11, 2002, even if the eligible entity does not qualify as a bona fide prospective purchaser, so long as the eligible entity has not caused or contributed to a release or threatened release of a hazardous substance at the property.
(4) Multipurpose brownfields grants
(A) In general
Subject to subparagraph (D) and paragraphs (5) and (6), the Administrator shall establish a program to provide multipurpose grants to an eligible entity based on the criteria under subparagraph (C) and the considerations under paragraph (3)(C), to carry out inventory, characterization, assessment, planning, or remediation activities at 1 or more brownfield sites in an area proposed by the eligible entity.
(B) Grant amounts
(i) Individual grant amounts
Each grant awarded under this paragraph shall not exceed $1,000,000.
(ii) Cumulative grant amounts
The total amount of grants awarded for each fiscal year under this paragraph may not exceed 15 percent of the funds made available for the fiscal year to carry out this subsection.
(C) Criteria
In awarding a grant under this paragraph, the Administrator shall consider the extent to which the eligible entity is able—
(i) to provide an overall plan for revitalization of the 1 or more brownfield sites in the proposed area in which the multipurpose grant will be used;
(ii) to demonstrate a capacity to conduct the range of eligible activities that will be funded by the multipurpose grant; and
(iii) to demonstrate that a multipurpose grant will meet the needs of the 1 or more brownfield sites in the proposed area.
(D) Condition
As a condition of receiving a grant under this paragraph, each eligible entity shall expend the full amount of the grant by not later than the date that is 5 years after the date on which the grant is awarded to the eligible entity, unless the Administrator provides an extension.
(E) Ownership
An eligible entity that receives a grant under this paragraph may not expend any of the grant funds for the remediation of a brownfield site unless the eligible entity owns the brownfield site.
(5) General provisions
(A) Maximum grant amount
(i) Brownfield site characterization and assessment
(I) In general
A grant under paragraph (2) may be awarded to an eligible entity on a community-wide or site-by-site basis, and shall not exceed, for any individual brownfield site covered by the grant, $200,000.
(II) Waiver
The Administrator may waive the $200,000 limitation under subclause (I) to permit the brownfield site to receive a grant of not to exceed $350,000, based on the anticipated level of contamination, size, or status of ownership of the site.
(ii) Brownfield remediation
A grant under paragraph (3)(A)(i) may be awarded to an eligible entity on a community-wide or site-by-site basis, not to exceed $1,000,000 per eligible entity. The Administrator may make an additional grant to an eligible entity described in the previous sentence for any year after the year for which the initial grant is made, taking into consideration—
(I) the number of sites and number of communities that are addressed by the revolving loan fund;
(II) the demand for funding by eligible entities that have not previously received a grant under this subsection;
(III) the demonstrated ability of the eligible entity to use the revolving loan fund to enhance remediation and provide funds on a continuing basis; and
(IV) such other similar factors as the Administrator considers appropriate to carry out this subsection.
(B) Prohibition
No part of a grant or loan under this subsection may be used for the payment of—
(i) a penalty or fine;
(ii) a Federal cost-share requirement;
(iii) a response cost at a brownfield site for which the recipient of the grant or loan is potentially liable under
(iv) a cost of compliance with any Federal law (including a Federal law specified in
(C) Assistance for development of local government site remediation programs
A local government that receives a grant under this subsection may use not to exceed 10 percent of the grant funds to develop and implement a brownfields program that may include—
(i) monitoring the health of populations exposed to one or more hazardous substances from a brownfield site; and
(ii) monitoring and enforcement of any institutional control used to prevent human exposure to any hazardous substance from a brownfield site.
(D) Insurance
A recipient of a grant or loan awarded under paragraph (2), (3), or (4) that performs a characterization, assessment, or remediation of a brownfield site may use a portion of the grant or loan to purchase insurance for the characterization, assessment, or remediation of that site.
(E) Administrative costs
(i) In general
An eligible entity may use up to 5 percent of the amounts made available under a grant or loan under this subsection for administrative costs.
(ii) Restriction
For purposes of clause (i), the term "administrative costs" does not include—
(I) investigation and identification of the extent of contamination of a brownfield site;
(II) design and performance of a response action; or
(III) monitoring of a natural resource.
(6) Grant applications
(A) Submission
(i) In general
(I) Application
An eligible entity may submit to the Administrator, through a regional office of the Environmental Protection Agency and in such form as the Administrator may require, an application for a grant under this subsection for one or more brownfield sites (including information on the criteria used by the Administrator to rank applications under subparagraph (C), to the extent that the information is available).
(II) NCP requirements
The Administrator may include in any requirement for submission of an application under subclause (I) a requirement of the National Contingency Plan only to the extent that the requirement is relevant and appropriate to the program under this subsection.
(ii) Coordination
The Administrator shall coordinate with other Federal agencies to assist in making eligible entities aware of other available Federal resources.
(iii) Guidance
The Administrator shall publish guidance to assist eligible entities in applying for grants under this subsection.
(B) Approval
The Administrator shall—
(i) at least annually, complete a review of applications for grants that are received from eligible entities under this subsection; and
(ii) award grants under this subsection to eligible entities that the Administrator determines have the highest rankings under the ranking criteria established under subparagraph (C).
(C) Ranking criteria
The Administrator shall establish a system for ranking grant applications received under this paragraph that includes the following criteria:
(i) The extent to which a grant will stimulate the availability of other funds for environmental assessment or remediation, and subsequent reuse, of an area in which one or more brownfield sites are located.
(ii) The potential of the proposed project or the development plan for an area in which one or more brownfield sites are located to stimulate economic development of the area on completion of the cleanup.
(iii) The extent to which a grant would address or facilitate the identification and reduction of threats to human health and the environment, including threats in areas in which there is a greater-than-normal incidence of diseases or conditions (including cancer, asthma, or birth defects) that may be associated with exposure to hazardous substances, pollutants, or contaminants.
(iv) The extent to which a grant would facilitate the use or reuse of existing infrastructure.
(v) The extent to which a grant would facilitate the creation of, preservation of, or addition to a park, a greenway, undeveloped property, recreational property, or other property used for nonprofit purposes.
(vi) The extent to which a grant would meet the needs of a community that has an inability to draw on other sources of funding for environmental remediation and subsequent redevelopment of the area in which a brownfield site is located because of the small population or low income of the community.
(vii) The extent to which the applicant is eligible for funding from other sources.
(viii) The extent to which a grant will further the fair distribution of funding between urban and nonurban areas.
(ix) The extent to which the grant provides for involvement of the local community in the process of making decisions relating to cleanup and future use of a brownfield site.
(x) The extent to which a grant would address or facilitate the identification and reduction of threats to the health or welfare of children, pregnant women, minority or low-income communities, or other sensitive populations.
(xi) The extent to which a grant would address a site adjacent to a body of water or a federally designated flood plain.
(xii) The extent to which a grant would facilitate—
(I) the location at a brownfield site of a facility that generates renewable electricity from wind, solar, or geothermal energy; or
(II) any energy efficiency improvement project at a brownfield site, including a project for a combined heat and power system or a district energy system.
(D) Report on ranking criteria
Not later than September 30, 2022, the Administrator shall submit to Congress a report regarding the Administrator's use of the ranking criteria described in subparagraph (C) in awarding grants under this subsection.
(7) Implementation of brownfields programs
(A) Establishment of program
The Administrator may provide, or fund eligible entities or nonprofit organizations to provide, training, research, and technical assistance to individuals and organizations, as appropriate, to facilitate the inventory of brownfield sites, site assessments, remediation of brownfield sites, community involvement, or site preparation.
(B) Funding restrictions
The total Federal funds to be expended by the Administrator under this paragraph shall not exceed 15 percent of the total amount appropriated to carry out this subsection in any fiscal year.
(8) Audits
(A) In general
The Inspector General of the Environmental Protection Agency shall conduct such reviews or audits of grants and loans under this subsection as the Inspector General considers necessary to carry out this subsection.
(B) Procedure
An audit under this subparagraph shall be conducted in accordance with the auditing procedures of the Government Accountability Office, including
(C) Violations
If the Administrator determines that a person that receives a grant or loan under this subsection has violated or is in violation of a condition of the grant, loan, or applicable Federal law, the Administrator may—
(i) terminate the grant or loan;
(ii) require the person to repay any funds received; and
(iii) seek any other legal remedies available to the Administrator.
(D) Report to Congress
Not later than September 30, 2022, the Inspector General of the Environmental Protection Agency shall submit to Congress a report that provides a description of the management of the program (including a description of the allocation of funds under this subsection).
(9) Leveraging
An eligible entity that receives a grant under this subsection may use the grant funds for a portion of a project at a brownfield site for which funding is received from other sources if the grant funds are used only for the purposes described in paragraph (2), (3), or (4).
(10) Agreements
Each grant or loan made under this subsection shall—
(A) include a requirement of the National Contingency Plan only to the extent that the requirement is relevant and appropriate to the program under this subsection, as determined by the Administrator; and
(B) be subject to an agreement that—
(i) requires the recipient to—
(I) comply with all applicable Federal and State laws; and
(II) ensure that the cleanup protects human health and the environment;
(ii) requires that the recipient use the grant or loan exclusively for purposes specified in paragraph (2), (3), or (4), as applicable;
(iii) in the case of an application by an eligible entity under paragraph (3)(A), requires the eligible entity to pay a matching share (which may be in the form of a contribution of labor, material, or services) of at least 20 percent, from non-Federal sources of funding, unless the Administrator determines that the matching share would place an undue hardship on the eligible entity; and
(iv) contains such other terms and conditions as the Administrator determines to be necessary to carry out this subsection.
(11) Facility other than brownfield site
The fact that a facility may not be a brownfield site within the meaning of
(12) Effect on Federal laws
Nothing in this subsection affects any liability or response authority under any Federal law, including—
(A) this chapter (including the last sentence of
(B) the Solid Waste Disposal Act (
(C) the Federal Water Pollution Control Act (
(D) the Toxic Substances Control Act (
(E) the Safe Drinking Water Act (
(13) Authorization of appropriations
There is authorized to be appropriated to carry out this subsection $200,000,000 for each of fiscal years 2019 through 2023.
(
Editorial Notes
References in Text
This chapter, referred to in text, was in the original "this Act", meaning
The Solid Waste Disposal Act, referred to in subsecs. (c)(3), (9)(D), (i)(10)(E), and (k)(12)(B), is title II of
Title III of the Amendments and Reauthorization Act of 1986, referred to in subsec. (e)(7)(E)(i), probably means title III of the Superfund Amendments and Reauthorization Act of 1986,
Reorganization Plan Numbered 14 of 1950, referred to in subsec. (g)(2), is set out in the Appendix to Title 5, Government Organization and Employees.
The Toxic Substances Control Act, referred to in subsecs. (i)(5)(C), (D) and (k)(12)(D), is
The Federal Insecticide, Fungicide, and Rodenticide Act, referred to in subsec. (i)(5)(C), (D), is act June 25, 1947, ch. 125, as amended generally by
The Alaska Native Claims Settlement Act, referred to in subsec. (k)(1)(H), is
The Federal Water Pollution Control Act, referred to in subsec. (k)(12)(C), is act June 30, 1948, ch. 758, as amended generally by
The Safe Drinking Water Act, referred to in subsec. (k)(12)(E), is title XIV of act July 1, 1944, as added Dec. 16, 1974,
Codification
In subsec. (g)(1), "
Amendments
2018—Subsec. (g)(1).
Subsec. (k).
Subsec. (k)(1)(I) to (L).
Subsec. (k)(2)(C).
Subsec. (k)(3)(A).
Subsec. (k)(3)(A)(ii).
Subsec. (k)(3)(E).
Subsec. (k)(4).
Subsec. (k)(5).
Subsec. (k)(5)(B).
Subsec. (k)(5)(E).
Subsec. (k)(6).
Subsec. (k)(6)(C)(xi), (xii).
Subsec. (k)(6)(D).
Subsec. (k)(7).
Subsec. (k)(8).
Subsec. (k)(8)(D).
Subsec. (k)(9) to (12).
Subsec. (k)(13).
2005—Subsec. (k)(4)(B)(iii).
2004—Subsec. (k)(7)(B).
2002—Subsec. (k).
1992—Subsec. (i)(1).
1986—Subsec. (a)(1).
Subsec. (a)(2).
Subsec. (a)(3), (4).
Subsec. (b).
Subsec. (c)(1).
Subsec. (c)(1)(C).
Subsec. (c)(3).
Subsec. (c)(4).
Subsec. (c)(5).
Subsec. (c)(6).
Subsec. (c)(7).
Subsec. (c)(8).
Subsec. (c)(9).
Subsec. (d)(1).
Subsec. (e)(1).
Subsec. (e)(2) to (6).
Subsec. (e)(7).
Subsec. (i).
Subsec. (j).
Statutory Notes and Related Subsidiaries
Administrator of the Agency for Toxic Substances and Disease Registry
Director of the Centers for Disease Control and Prevention to serve as the Administrator of the Agency for Toxic Substances and Disease Registry consistent with subsec. (i) of this section, see
Termination of Reporting Requirements
For termination, effective May 15, 2000, of provisions in subsec. (i)(10) of this section relating to the requirement that the Administrator of ATSDR submit a biennial report to Congress, see section 3003 of
Coordination of Titles I to IV of Pub. L. 99–499
Any provision of titles I to IV of
1 So in original. Probably should be followed by a comma.
§9605. National contingency plan
(a) Revision and republication
Within one hundred and eighty days after December 11, 1980, the President shall, after notice and opportunity for public comments, revise and republish the national contingency plan for the removal of oil and hazardous substances, originally prepared and published pursuant to
(1) methods for discovering and investigating facilities at which hazardous substances have been disposed of or otherwise come to be located;
(2) methods for evaluating, including analyses of relative cost, and remedying any releases or threats of releases from facilities which pose substantial danger to the public health or the environment;
(3) methods and criteria for determining the appropriate extent of removal, remedy, and other measures authorized by this chapter;
(4) appropriate roles and responsibilities for the Federal, State, and local governments and for interstate and nongovernmental entities in effectuating the plan;
(5) provision for identification, procurement, maintenance, and storage of response equipment and supplies;
(6) a method for and assignment of responsibility for reporting the existence of such facilities which may be located on federally owned or controlled properties and any releases of hazardous substances from such facilities;
(7) means of assuring that remedial action measures are cost-effective over the period of potential exposure to the hazardous substances or contaminated materials;
(8)(A) criteria for determining priorities among releases or threatened releases throughout the United States for the purpose of taking remedial action and, to the extent practicable taking into account the potential urgency of such action, for the purpose of taking removal action. Criteria and priorities under this paragraph shall be based upon relative risk or danger to public health or welfare or the environment, in the judgment of the President, taking into account to the extent possible the population at risk, the hazard potential of the hazardous substances at such facilities, the potential for contamination of drinking water supplies, the potential for direct human contact, the potential for destruction of sensitive ecosystems, the damage to natural resources which may affect the human food chain and which is associated with any release or threatened release, the contamination or potential contamination of the ambient air which is associated with the release or threatened release, State preparedness to assume State costs and responsibilities, and other appropriate factors;
(B) based upon the criteria set forth in subparagraph (A) of this paragraph, the President shall list as part of the plan national priorities among the known releases or threatened releases throughout the United States and shall revise the list no less often than annually. Within one year after December 11, 1980, and annually thereafter, each State shall establish and submit for consideration by the President priorities for remedial action among known releases and potential releases in that State based upon the criteria set forth in subparagraph (A) of this paragraph. In assembling or revising the national list, the President shall consider any priorities established by the States. To the extent practicable, the highest priority facilities shall be designated individually and shall be referred to as the "top priority among known response targets", and, to the extent practicable, shall include among the one hundred highest priority facilities one such facility from each State which shall be the facility designated by the State as presenting the greatest danger to public health or welfare or the environment among the known facilities in such State. A State shall be allowed to designate its highest priority facility only once. Other priority facilities or incidents may be listed singly or grouped for response priority purposes;
(9) specified roles for private organizations and entities in preparation for response and in responding to releases of hazardous substances, including identification of appropriate qualifications and capacity therefor and including consideration of minority firms in accordance with subsection (f); and
(10) standards and testing procedures by which alternative or innovative treatment technologies can be determined to be appropriate for utilization in response actions authorized by this chapter.
The plan shall specify procedures, techniques, materials, equipment, and methods to be employed in identifying, removing, or remedying releases of hazardous substances comparable to those required under section 1321(c)(2)(F) and (G) and (j)(1) of title 33. Following publication of the revised national contingency plan, the response to and actions to minimize damage from hazardous substances releases shall, to the greatest extent possible, be in accordance with the provisions of the plan. The President may, from time to time, revise and republish the national contingency plan.
(b) Revision of plan
Not later than 18 months after the enactment of the Superfund Amendments and Reauthorization Act of 1986 [October 17, 1986], the President shall revise the National Contingency Plan to reflect the requirements of such amendments. The portion of such Plan known as "the National Hazardous Substance Response Plan" shall be revised to provide procedures and standards for remedial actions undertaken pursuant to this chapter which are consistent with amendments made by the Superfund Amendments and Reauthorization Act of 1986 relating to the selection of remedial action.
(c) Hazard ranking system
(1) Revision
Not later than 18 months after October 17, 1986, and after publication of notice and opportunity for submission of comments in accordance with
(2) Health assessment of water contamination risks
In carrying out this subsection, the President shall ensure that the human health risks associated with the contamination or potential contamination (either directly or as a result of the runoff of any hazardous substance or pollutant or contaminant from sites or facilities) of surface water are appropriately assessed where such surface water is, or can be, used for recreation or potable water consumption. In making the assessment required pursuant to the preceding sentence, the President shall take into account the potential migration of any hazardous substance or pollutant or contaminant through such surface water to downstream sources of drinking water.
(3) Reevaluation not required
The President shall not be required to reevaluate, after October 17, 1986, the hazard ranking of any facility which was evaluated in accordance with the criteria under this section before the effective date of the amendments to the hazard ranking system under this subsection and which was assigned a national priority under the National Contingency Plan.
(4) New information
Nothing in paragraph (3) shall preclude the President from taking new information into account in undertaking response actions under this chapter.
(d) Petition for assessment of release
Any person who is, or may be, affected by a release or threatened release of a hazardous substance or pollutant or contaminant, may petition the President to conduct a preliminary assessment of the hazards to public health and the environment which are associated with such release or threatened release. If the President has not previously conducted a preliminary assessment of such release, the President shall, within 12 months after the receipt of any such petition, complete such assessment or provide an explanation of why the assessment is not appropriate. If the preliminary assessment indicates that the release or threatened release concerned may pose a threat to human health or the environment, the President shall promptly evaluate such release or threatened release in accordance with the hazard ranking system referred to in paragraph (8)(A) of subsection (a) to determine the national priority of such release or threatened release.
(e) Releases from earlier sites
Whenever there has been, after January 1, 1985, a significant release of hazardous substances or pollutants or contaminants from a site which is listed by the President as a "Site Cleaned Up To Date" on the National Priorities List (revised edition, December 1984) the site shall be restored to the National Priorities List, without application of the hazard ranking system.
(f) Minority contractors
In awarding contracts under this chapter, the President shall consider the availability of qualified minority firms. The President shall describe, as part of any annual report submitted to the Congress under this chapter, the participation of minority firms in contracts carried out under this chapter. Such report shall contain a brief description of the contracts which have been awarded to minority firms under this chapter and of the efforts made by the President to encourage the participation of such firms in programs carried out under this chapter.
(g) Special study wastes
(1) Application
This subsection applies to facilities—
(A) which as of October 17, 1986, were not included on, or proposed for inclusion on, the National Priorities List; and
(B) at which special study wastes described in paragraph (2), (3)(A)(ii) or (3)(A)(iii) of
(2) Considerations in adding facilities to NPL
Pending revision of the hazard ranking system under subsection (c), the President shall consider each of the following factors in adding facilities covered by this section to the National Priorities List:
(A) The extent to which hazard ranking system score for the facility is affected by the presence of any special study waste at, or any release from, such facility.
(B) Available information as to the quantity, toxicity, and concentration of hazardous substances that are constituents of any special study waste at, or released from such facility, the extent of or potential for release of such hazardous constituents, the exposure or potential exposure to human population and the environment, and the degree of hazard to human health or the environment posed by the release of such hazardous constituents at such facility. This subparagraph refers only to available information on actual concentrations of hazardous substances and not on the total quantity of special study waste at such facility.
(3) Savings provisions
Nothing in this subsection shall be construed to limit the authority of the President to remove any facility which as of October 17, 1986, is included on the National Priorities List from such List, or not to list any facility which as of such date is proposed for inclusion on such list.
(4) Information gathering and analysis
Nothing in this chapter shall be construed to preclude the expenditure of monies from the Fund for gathering and analysis of information which will enable the President to consider the specific factors required by paragraph (2).
(h) NPL deferral
(1) Deferral to State voluntary cleanups
At the request of a State and subject to paragraphs (2) and (3), the President generally shall defer final listing of an eligible response site on the National Priorities List if the President determines that—
(A) the State, or another party under an agreement with or order from the State, is conducting a response action at the eligible response site—
(i) in compliance with a State program that specifically governs response actions for the protection of public health and the environment; and
(ii) that will provide long-term protection of human health and the environment; or
(B) the State is actively pursuing an agreement to perform a response action described in subparagraph (A) at the site with a person that the State has reason to believe is capable of conducting a response action that meets the requirements of subparagraph (A).
(2) Progress toward cleanup
If, after the last day of the 1-year period beginning on the date on which the President proposes to list an eligible response site on the National Priorities List, the President determines that the State or other party is not making reasonable progress toward completing a response action at the eligible response site, the President may list the eligible response site on the National Priorities List.
(3) Cleanup agreements
With respect to an eligible response site under paragraph (1)(B), if, after the last day of the 1-year period beginning on the date on which the President proposes to list the eligible response site on the National Priorities List, an agreement described in paragraph (1)(B) has not been reached, the President may defer the listing of the eligible response site on the National Priorities List for an additional period of not to exceed 180 days if the President determines deferring the listing would be appropriate based on—
(A) the complexity of the site;
(B) substantial progress made in negotiations; and
(C) other appropriate factors, as determined by the President.
(4) Exceptions
The President may decline to defer, or elect to discontinue a deferral of, a listing of an eligible response site on the National Priorities List if the President determines that—
(A) deferral would not be appropriate because the State, as an owner or operator or a significant contributor of hazardous substances to the facility, is a potentially responsible party;
(B) the criteria under the National Contingency Plan for issuance of a health advisory have been met; or
(C) the conditions in paragraphs (1) through (3), as applicable, are no longer being met.
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (a), (b), (c)(4), (f), and (g)(4), was in the original "this Act", meaning
Such amendments and the amendments made by the Superfund Amendments and Reauthorization Act of 1986, referred to in subsec. (b), are the amendments made by
Amendments
2002—Subsec. (h).
1986—Subsec. (a).
Subsec. (a)(8)(A).
Subsec. (a)(8)(B).
Subsec. (a)(9).
Subsec. (a)(10).
Subsecs. (b) to (g).
1 See References in Text note below.
§9606. Abatement actions
(a) Maintenance, jurisdiction, etc.
In addition to any other action taken by a State or local government, when the President determines that there may be an imminent and substantial endangerment to the public health or welfare or the environment because of an actual or threatened release of a hazardous substance from a facility, he may require the Attorney General of the United States to secure such relief as may be necessary to abate such danger or threat, and the district court of the United States in the district in which the threat occurs shall have jurisdiction to grant such relief as the public interest and the equities of the case may require. The President may also, after notice to the affected State, take other action under this section including, but not limited to, issuing such orders as may be necessary to protect public health and welfare and the environment.
(b) Fines; reimbursement
(1) Any person who, without sufficient cause, willfully violates, or fails or refuses to comply with, any order of the President under subsection (a) may, in an action brought in the appropriate United States district court to enforce such order, be fined not more than $25,000 for each day in which such violation occurs or such failure to comply continues.
(2)(A) Any person who receives and complies with the terms of any order issued under subsection (a) may, within 60 days after completion of the required action, petition the President for reimbursement from the Fund for the reasonable costs of such action, plus interest. Any interest payable under this paragraph shall accrue on the amounts expended from the date of expenditure at the same rate as specified for interest on investments of the Hazardous Substance Superfund established under subchapter A of
(B) If the President refuses to grant all or part of a petition made under this paragraph, the petitioner may within 30 days of receipt of such refusal file an action against the President in the appropriate United States district court seeking reimbursement from the Fund.
(C) Except as provided in subparagraph (D), to obtain reimbursement, the petitioner shall establish by a preponderance of the evidence that it is not liable for response costs under
(D) A petitioner who is liable for response costs under
(E) Reimbursement awarded by a court under subparagraph (C) or (D) may include appropriate costs, fees, and other expenses in accordance with subsections (a) and (d) of
(c) Guidelines for using imminent hazard, enforcement, and emergency response authorities; promulgation by Administrator of EPA, scope, etc.
Within one hundred and eighty days after December 11, 1980, the Administrator of the Environmental Protection Agency shall, after consultation with the Attorney General, establish and publish guidelines for using the imminent hazard, enforcement, and emergency response authorities of this section and other existing statutes administered by the Administrator of the Environmental Protection Agency to effectuate the responsibilities and powers created by this chapter. Such guidelines shall to the extent practicable be consistent with the national hazardous substance response plan, and shall include, at a minimum, the assignment of responsibility for coordinating response actions with the issuance of administrative orders, enforcement of standards and permits, the gathering of information, and other imminent hazard and emergency powers authorized by (1) sections 1321(c)(2),1 1318, 1319, and 1364(a) of title 33, (2)
(
Editorial Notes
References in Text
This chapter, referred to in subsec. (c), was in the original "this Act", meaning
Amendments
1986—Subsec. (b).
Subsec. (b)(2)(A).
Statutory Notes and Related Subsidiaries
Coordination of Titles I to IV of Pub. L. 99–499
Any provision of titles I to IV of
1 See References in Text note below.
§9607. Liability
(a) Covered persons; scope; recoverable costs and damages; interest rate; "comparable maturity" date
Notwithstanding any other provision or rule of law, and subject only to the defenses set forth in subsection (b) of this section—
(1) the owner and operator of a vessel or a facility,
(2) any person who at the time of disposal of any hazardous substance owned or operated any facility at which such hazardous substances were disposed of,
(3) any person who by contract, agreement, or otherwise arranged for disposal or treatment, or arranged with a transporter for transport for disposal or treatment, of hazardous substances owned or possessed by such person, by any other party or entity, at any facility or incineration vessel owned or operated by another party or entity and containing such hazardous substances, and
(4) any person who accepts or accepted any hazardous substances for transport to disposal or treatment facilities, incineration vessels or sites selected by such person, from which there is a release, or a threatened release which causes the incurrence of response costs, of a hazardous substance, shall be liable for—
(A) all costs of removal or remedial action incurred by the United States Government or a State or an Indian tribe not inconsistent with the national contingency plan;
(B) any other necessary costs of response incurred by any other person consistent with the national contingency plan;
(C) damages for injury to, destruction of, or loss of natural resources, including the reasonable costs of assessing such injury, destruction, or loss resulting from such a release; and
(D) the costs of any health assessment or health effects study carried out under
The amounts recoverable in an action under this section shall include interest on the amounts recoverable under subparagraphs (A) through (D). Such interest shall accrue from the later of (i) the date payment of a specified amount is demanded in writing, or (ii) the date of the expenditure concerned. The rate of interest on the outstanding unpaid balance of the amounts recoverable under this section shall be the same rate as is specified for interest on investments of the Hazardous Substance Superfund established under subchapter A of
(b) Defenses
There shall be no liability under subsection (a) of this section for a person otherwise liable who can establish by a preponderance of the evidence that the release or threat of release of a hazardous substance and the damages resulting therefrom were caused solely by—
(1) an act of God;
(2) an act of war;
(3) an act or omission of a third party other than an employee or agent of the defendant, or than one whose act or omission occurs in connection with a contractual relationship, existing directly or indirectly, with the defendant (except where the sole contractual arrangement arises from a published tariff and acceptance for carriage by a common carrier by rail), if the defendant establishes by a preponderance of the evidence that (a) he exercised due care with respect to the hazardous substance concerned, taking into consideration the characteristics of such hazardous substance, in light of all relevant facts and circumstances, and (b) he took precautions against foreseeable acts or omissions of any such third party and the consequences that could foreseeably result from such acts or omissions; or
(4) any combination of the foregoing paragraphs.
(c) Determination of amounts
(1) Except as provided in paragraph (2) of this subsection, the liability under this section of an owner or operator or other responsible person for each release of a hazardous substance or incident involving release of a hazardous substance shall not exceed—
(A) for any vessel, other than an incineration vessel, which carries any hazardous substance as cargo or residue, $300 per gross ton, or $5,000,000, whichever is greater;
(B) for any other vessel, other than an incineration vessel, $300 per gross ton, or $500,000, whichever is greater;
(C) for any motor vehicle, aircraft, hazardous liquid pipeline facility (as defined in
(D) for any incineration vessel or any facility other than those specified in subparagraph (C) of this paragraph, the total of all costs of response plus $50,000,000 for any damages under this subchapter.
(2) Notwithstanding the limitations in paragraph (1) of this subsection, the liability of an owner or operator or other responsible person under this section shall be the full and total costs of response and damages, if (A)(i) the release or threat of release of a hazardous substance was the result of willful misconduct or willful negligence within the privity or knowledge of such person, or (ii) the primary cause of the release was a violation (within the privity or knowledge of such person) of applicable safety, construction, or operating standards or regulations; or (B) such person fails or refuses to provide all reasonable cooperation and assistance requested by a responsible public official in connection with response activities under the national contingency plan with respect to regulated carriers subject to the provisions of title 49 or vessels subject to the provisions of title 33 or 46, subparagraph (A)(ii) of this paragraph shall be deemed to refer to Federal standards or regulations.
(3) If any person who is liable for a release or threat of release of a hazardous substance fails without sufficient cause to properly provide removal or remedial action upon order of the President pursuant to
(d) Rendering care or advice
(1) In general
Except as provided in paragraph (2), no person shall be liable under this subchapter for costs or damages as a result of actions taken or omitted in the course of rendering care, assistance, or advice in accordance with the National Contingency Plan ("NCP") or at the direction of an onscene coordinator appointed under such plan, with respect to an incident creating a danger to public health or welfare or the environment as a result of any releases of a hazardous substance or the threat thereof. This paragraph shall not preclude liability for costs or damages as the result of negligence on the part of such person.
(2) State and local governments
No State or local government shall be liable under this subchapter for costs or damages as a result of actions taken in response to an emergency created by the release or threatened release of a hazardous substance generated by or from a facility owned by another person. This paragraph shall not preclude liability for costs or damages as a result of gross negligence or intentional misconduct by the State or local government. For the purpose of the preceding sentence, reckless, willful, or wanton misconduct shall constitute gross negligence.
(3) Savings provision
This subsection shall not alter the liability of any person covered by the provisions of paragraph (1), (2), (3), or (4) of subsection (a) of this section with respect to the release or threatened release concerned.
(e) Indemnification, hold harmless, etc., agreements or conveyances; subrogation rights
(1) No indemnification, hold harmless, or similar agreement or conveyance shall be effective to transfer from the owner or operator of any vessel or facility or from any person who may be liable for a release or threat of release under this section, to any other person the liability imposed under this section. Nothing in this subsection shall bar any agreement to insure, hold harmless, or indemnify a party to such agreement for any liability under this section.
(2) Nothing in this subchapter, including the provisions of paragraph (1) of this subsection, shall bar a cause of action that an owner or operator or any other person subject to liability under this section, or a guarantor, has or would have, by reason of subrogation or otherwise against any person.
(f) Natural resources liability; designation of public trustees of natural resources
(1) Natural resources liability
In the case of an injury to, destruction of, or loss of natural resources under subparagraph (C) of subsection (a) liability shall be to the United States Government and to any State for natural resources within the State or belonging to, managed by, controlled by, or appertaining to such State and to any Indian tribe for natural resources belonging to, managed by, controlled by, or appertaining to such tribe, or held in trust for the benefit of such tribe, or belonging to a member of such tribe if such resources are subject to a trust restriction on alienation: Provided, however, That no liability to the United States or State or Indian tribe shall be imposed under subparagraph (C) of subsection (a), where the party sought to be charged has demonstrated that the damages to natural resources complained of were specifically identified as an irreversible and irretrievable commitment of natural resources in an environmental impact statement, or other comparable environment analysis, and the decision to grant a permit or license authorizes such commitment of natural resources, and the facility or project was otherwise operating within the terms of its permit or license, so long as, in the case of damages to an Indian tribe occurring pursuant to a Federal permit or license, the issuance of that permit or license was not inconsistent with the fiduciary duty of the United States with respect to such Indian tribe. The President, or the authorized representative of any State, shall act on behalf of the public as trustee of such natural resources to recover for such damages. Sums recovered by the United States Government as trustee under this subsection shall be retained by the trustee, without further appropriation, for use only to restore, replace, or acquire the equivalent of such natural resources. Sums recovered by a State as trustee under this subsection shall be available for use only to restore, replace, or acquire the equivalent of such natural resources by the State. The measure of damages in any action under subparagraph (C) of subsection (a) shall not be limited by the sums which can be used to restore or replace such resources. There shall be no double recovery under this chapter for natural resource damages, including the costs of damage assessment or restoration, rehabilitation, or acquisition for the same release and natural resource. There shall be no recovery under the authority of subparagraph (C) of subsection (a) where such damages and the release of a hazardous substance from which such damages resulted have occurred wholly before December 11, 1980.
(2) Designation of Federal and State officials
(A) Federal
The President shall designate in the National Contingency Plan published under
(B) State
The Governor of each State shall designate State officials who may act on behalf of the public as trustees for natural resources under this chapter and
(C) Rebuttable presumption
Any determination or assessment of damages to natural resources for the purposes of this chapter and
(g) Federal agencies
For provisions relating to Federal agencies, see
(h) Owner or operator of vessel
The owner or operator of a vessel shall be liable in accordance with this section, under maritime tort law, and as provided under
(i) Application of a registered pesticide product
No person (including the United States or any State or Indian tribe) may recover under the authority of this section for any response costs or damages resulting from the application of a pesticide product registered under the Federal Insecticide, Fungicide, and Rodenticide Act [
(j) Obligations or liability pursuant to federally permitted release
Recovery by any person (including the United States or any State or Indian tribe) for response costs or damages resulting from a federally permitted release shall be pursuant to existing law in lieu of this section. Nothing in this paragraph shall affect or modify in any way the obligations or liability of any person under any other provision of State or Federal law, including common law, for damages, injury, or loss resulting from a release of any hazardous substance or for removal or remedial action or the costs of removal or remedial action of such hazardous substance. In addition, costs of response incurred by the Federal Government in connection with a discharge specified in section 9601(10)(B) or (C) of this title shall be recoverable in an action brought under
(k) Transfer to, and assumption by, Post-Closure Liability Fund of liability of owner or operator of hazardous waste disposal facility in receipt of permit under applicable solid waste disposal law; time, criteria applicable, procedures, etc.; monitoring costs; reports
(1) The liability established by this section or any other law for the owner or operator of a hazardous waste disposal facility which has received a permit under subtitle C of the Solid Waste Disposal Act [
(A) such facility and the owner and operator thereof has complied with the requirements of subtitle C of the Solid Waste Disposal Act [
(B) such facility has been closed in accordance with such regulations and the conditions of such permit, and such facility and the surrounding area have been monitored as required by such regulations and permit conditions for a period not to exceed five years after closure to demonstrate that there is no substantial likelihood that any migration offsite or release from confinement of any hazardous substance or other risk to public health or welfare will occur.
(2) Such transfer of liability shall be effective ninety days after the owner or operator of such facility notifies the Administrator of the Environmental Protection Agency (and the State where it has an authorized program under section 3006(b) of the Solid Waste Disposal Act [
(3) In addition to the assumption of liability of owners and operators under paragraph (1) of this subsection, the Post-closure Liability Fund established by section 9641 1 of this title may be used to pay costs of monitoring and care and maintenance of a site incurred by other persons after the period of monitoring required by regulations under subtitle C of the Solid Waste Disposal Act [
(4)(A) Not later than one year after December 11, 1980, the Secretary of the Treasury shall conduct a study and shall submit a report thereon to the Congress on the feasibility of establishing or qualifying an optional system of private insurance for postclosure financial responsibility for hazardous waste disposal facilities to which this subsection applies. Such study shall include a specification of adequate and realistic minimum standards to assure that any such privately placed insurance will carry out the purposes of this subsection in a reliable, enforceable, and practical manner. Such a study shall include an examination of the public and private incentives, programs, and actions necessary to make privately placed insurance a practical and effective option to the financing system for the Post-closure Liability Fund provided in subchapter II 1 of this chapter.
(B) Not later than eighteen months after December 11, 1980, and after a public hearing, the President shall by rule determine whether or not it is feasible to establish or qualify an optional system of private insurance for postclosure financial responsibility for hazardous waste disposal facilities to which this subsection applies. If the President determines the establishment or qualification of such a system would be infeasible, he shall promptly publish an explanation of the reasons for such a determination. If the President determines the establishment or qualification of such a system would be feasible, he shall promptly publish notice of such determination. Not later than six months after an affirmative determination under the preceding sentence and after a public hearing, the President shall by rule promulgate adequate and realistic minimum standards which must be met by any such privately placed insurance, taking into account the purposes of this chapter and this subsection. Such rules shall also specify reasonably expeditious procedures by which privately placed insurance plans can qualify as meeting such minimum standards.
(C) In the event any privately placed insurance plan qualifies under subparagraph (B), any person enrolled in, and complying with the terms of, such plan shall be excluded from the provisions of paragraphs (1), (2), and (3) of this subsection and exempt from the requirements to pay any tax or fee to the Post-closure Liability Fund under subchapter II 1 of this chapter.
(D) The President may issue such rules and take such other actions as are necessary to effectuate the purposes of this paragraph.
(5)
(6)
(A)
(B)
(i) Incentives are created and maintained for the safe management and disposal of hazardous wastes so as to assure protection of human health and the environment.
(ii) Members of the public will have reasonable confidence that hazardous wastes will be managed and disposed of safely and that resources will be available to address any problems that may arise and to cover costs of long-term monitoring, care, and maintenance of such sites.
(iii) Persons who are or seek to become owners and operators of hazardous waste disposal facilities will be able to manage their potential future liabilities and to attract the investment capital necessary to build, operate, and close such facilities in a manner which assures protection of human health and the environment.
(C)
(i) the current and future financial capabilities of facility owners and operators;
(ii) the current and future costs associated with facilities, including the costs of routine monitoring and maintenance, compliance monitoring, corrective action, natural resource damages, and liability for damages to third parties; and
(iii) the availability of mechanisms by which owners and operators of such facilities can assure that current and future costs, including post-closure costs, will be financed.
(D)
(E)
(i) revisions to closure, post-closure, and financial responsibility requirements under subtitles C and I of the Solid Waste Disposal Act [
(ii) voluntary risk pooling by owners and operators;
(iii) legislation to require risk pooling by owners and operators;
(iv) modification of the Post-Closure Liability Trust Fund previously established by section 9641 1 of this title, and the conditions for transfer of liability under this subsection, including limiting the transfer of some or all liability under this subsection only in the case of insolvency of owners and operators;
(v) private insurance;
(vi) insurance provided by the Federal Government;
(vii) coinsurance, reinsurance, or pooled-risk insurance, whether provided by the private sector or provided or assisted by the Federal Government; and
(viii) creation of a new program to be administered by a new or existing Federal agency or by a federally chartered corporation.
(F)
(l) Federal lien
(1) In general
All costs and damages for which a person is liable to the United States under subsection (a) of this section (other than the owner or operator of a vessel under paragraph (1) of subsection (a)) shall constitute a lien in favor of the United States upon all real property and rights to such property which—
(A) belong to such person; and
(B) are subject to or affected by a removal or remedial action.
(2) Duration
The lien imposed by this subsection shall arise at the later of the following:
(A) The time costs are first incurred by the United States with respect to a response action under this chapter.
(B) The time that the person referred to in paragraph (1) is provided (by certified or registered mail) written notice of potential liability.
Such lien shall continue until the liability for the costs (or a judgment against the person arising out of such liability) is satisfied or becomes unenforceable through operation of the statute of limitations provided in
(3) Notice and validity
The lien imposed by this subsection shall be subject to the rights of any purchaser, holder of a security interest, or judgment lien creditor whose interest is perfected under applicable State law before notice of the lien has been filed in the appropriate office within the State (or county or other governmental subdivision), as designated by State law, in which the real property subject to the lien is located. Any such purchaser, holder of a security interest, or judgment lien creditor shall be afforded the same protections against the lien imposed by this subsection as are afforded under State law against a judgment lien which arises out of an unsecured obligation and which arises as of the time of the filing of the notice of the lien imposed by this subsection. If the State has not by law designated one office for the receipt of such notices of liens, the notice shall be filed in the office of the clerk of the United States district court for the district in which the real property is located. For purposes of this subsection, the terms "purchaser" and "security interest" shall have the definitions provided under
(4) Action in rem
The costs constituting the lien may be recovered in an action in rem in the United States district court for the district in which the removal or remedial action is occurring or has occurred. Nothing in this subsection shall affect the right of the United States to bring an action against any person to recover all costs and damages for which such person is liable under subsection (a) of this section.
(m) Maritime lien
All costs and damages for which the owner or operator of a vessel is liable under subsection (a)(1) with respect to a release or threatened release from such vessel shall constitute a maritime lien in favor of the United States on such vessel. Such costs may be recovered in an action in rem in the district court of the United States for the district in which the vessel may be found. Nothing in this subsection shall affect the right of the United States to bring an action against the owner or operator of such vessel in any court of competent jurisdiction to recover such costs.
(n) Liability of fiduciaries
(1) In general
The liability of a fiduciary under any provision of this chapter for the release or threatened release of a hazardous substance at, from, or in connection with a vessel or facility held in a fiduciary capacity shall not exceed the assets held in the fiduciary capacity.
(2) Exclusion
Paragraph (1) does not apply to the extent that a person is liable under this chapter independently of the person's ownership of a vessel or facility as a fiduciary or actions taken in a fiduciary capacity.
(3) Limitation
Paragraphs (1) and (4) do not limit the liability pertaining to a release or threatened release of a hazardous substance if negligence of a fiduciary causes or contributes to the release or threatened release.
(4) Safe harbor
A fiduciary shall not be liable in its personal capacity under this chapter for—
(A) undertaking or directing another person to undertake a response action under subsection (d)(1) or under the direction of an on scene coordinator designated under the National Contingency Plan;
(B) undertaking or directing another person to undertake any other lawful means of addressing a hazardous substance in connection with the vessel or facility;
(C) terminating the fiduciary relationship;
(D) including in the terms of the fiduciary agreement a covenant, warranty, or other term or condition that relates to compliance with an environmental law, or monitoring, modifying or enforcing the term or condition;
(E) monitoring or undertaking 1 or more inspections of the vessel or facility;
(F) providing financial or other advice or counseling to other parties to the fiduciary relationship, including the settlor or beneficiary;
(G) restructuring, renegotiating, or otherwise altering the terms and conditions of the fiduciary relationship;
(H) administering, as a fiduciary, a vessel or facility that was contaminated before the fiduciary relationship began; or
(I) declining to take any of the actions described in subparagraphs (B) through (H).
(5) Definitions
As used in this chapter:
(A) Fiduciary
The term "fiduciary"—
(i) means a person acting for the benefit of another party as a bona fide—
(I) trustee;
(II) executor;
(III) administrator;
(IV) custodian;
(V) guardian of estates or guardian ad litem;
(VI) receiver;
(VII) conservator;
(VIII) committee of estates of incapacitated persons;
(IX) personal representative;
(X) trustee (including a successor to a trustee) under an indenture agreement, trust agreement, lease, or similar financing agreement, for debt securities, certificates of interest or certificates of participation in debt securities, or other forms of indebtedness as to which the trustee is not, in the capacity of trustee, the lender; or
(XI) representative in any other capacity that the Administrator, after providing public notice, determines to be similar to the capacities described in subclauses (I) through (X); and
(ii) does not include—
(I) a person that is acting as a fiduciary with respect to a trust or other fiduciary estate that was organized for the primary purpose of, or is engaged in, actively carrying on a trade or business for profit, unless the trust or other fiduciary estate was created as part of, or to facilitate, 1 or more estate plans or because of the incapacity of a natural person; or
(II) a person that acquires ownership or control of a vessel or facility with the objective purpose of avoiding liability of the person or of any other person.
(B) Fiduciary capacity
The term "fiduciary capacity" means the capacity of a person in holding title to a vessel or facility, or otherwise having control of or an interest in the vessel or facility, pursuant to the exercise of the responsibilities of the person as a fiduciary.
(6) Savings clause
Nothing in this subsection—
(A) affects the rights or immunities or other defenses that are available under this chapter or other law that is applicable to a person subject to this subsection; or
(B) creates any liability for a person or a private right of action against a fiduciary or any other person.
(7) No effect on certain persons
Nothing in this subsection applies to a person if the person—
(A)(i) acts in a capacity other than that of a fiduciary or in a beneficiary capacity; and
(ii) in that capacity, directly or indirectly benefits from a trust or fiduciary relationship; or
(B)(i) is a beneficiary and a fiduciary with respect to the same fiduciary estate; and
(ii) as a fiduciary, receives benefits that exceed customary or reasonable compensation, and incidental benefits, permitted under other applicable law.
(8) Limitation
This subsection does not preclude a claim under this chapter against—
(A) the assets of the estate or trust administered by the fiduciary; or
(B) a nonemployee agent or independent contractor retained by a fiduciary.
(o) De micromis exemption
(1) In general
Except as provided in paragraph (2), a person shall not be liable, with respect to response costs at a facility on the National Priorities List, under this chapter if liability is based solely on paragraph (3) or (4) of subsection (a), and the person, except as provided in paragraph (4) of this subsection, can demonstrate that—
(A) the total amount of the material containing hazardous substances that the person arranged for disposal or treatment of, arranged with a transporter for transport for disposal or treatment of, or accepted for transport for disposal or treatment, at the facility was less than 110 gallons of liquid materials or less than 200 pounds of solid materials (or such greater or lesser amounts as the Administrator may determine by regulation); and
(B) all or part of the disposal, treatment, or transport concerned occurred before April 1, 2001.
(2) Exceptions
Paragraph (1) shall not apply in a case in which—
(A) the President determines that—
(i) the materials containing hazardous substances referred to in paragraph (1) have contributed significantly or could contribute significantly, either individually or in the aggregate, to the cost of the response action or natural resource restoration with respect to the facility; or
(ii) the person has failed to comply with an information request or administrative subpoena issued by the President under this chapter or has impeded or is impeding, through action or inaction, the performance of a response action or natural resource restoration with respect to the facility; or
(B) a person has been convicted of a criminal violation for the conduct to which the exemption would apply, and that conviction has not been vitiated on appeal or otherwise.
(3) No judicial review
A determination by the President under paragraph (2)(A) shall not be subject to judicial review.
(4) Nongovernmental third-party contribution actions
In the case of a contribution action, with respect to response costs at a facility on the National Priorities List, brought by a party, other than a Federal, State, or local government, under this chapter, the burden of proof shall be on the party bringing the action to demonstrate that the conditions described in paragraph (1)(A) and (B) of this subsection are not met.
(p) Municipal solid waste exemption
(1) In general
Except as provided in paragraph (2) of this subsection, a person shall not be liable, with respect to response costs at a facility on the National Priorities List, under paragraph (3) of subsection (a) for municipal solid waste disposed of at a facility if the person, except as provided in paragraph (5) of this subsection, can demonstrate that the person is—
(A) an owner, operator, or lessee of residential property from which all of the person's municipal solid waste was generated with respect to the facility;
(B) a business entity (including a parent, subsidiary, or affiliate of the entity) that, during its 3 taxable years preceding the date of transmittal of written notification from the President of its potential liability under this section, employed on average not more than 100 full-time individuals, or the equivalent thereof, and that is a small business concern (within the meaning of the Small Business Act (
(C) an organization described in
For purposes of this subsection, the term "affiliate" has the meaning of that term provided in the definition of "small business concern" in regulations promulgated by the Small Business Administration in accordance with the Small Business Act (
(2) Exception
Paragraph (1) shall not apply in a case in which the President determines that—
(A) the municipal solid waste referred to in paragraph (1) has contributed significantly or could contribute significantly, either individually or in the aggregate, to the cost of the response action or natural resource restoration with respect to the facility;
(B) the person has failed to comply with an information request or administrative subpoena issued by the President under this chapter; or
(C) the person has impeded or is impeding, through action or inaction, the performance of a response action or natural resource restoration with respect to the facility.
(3) No judicial review
A determination by the President under paragraph (2) shall not be subject to judicial review.
(4) Definition of municipal solid waste
(A) In general
For purposes of this subsection, the term "municipal solid waste" means waste material—
(i) generated by a household (including a single or multifamily residence); and
(ii) generated by a commercial, industrial, or institutional entity, to the extent that the waste material—
(I) is essentially the same as waste normally generated by a household;
(II) is collected and disposed of with other municipal solid waste as part of normal municipal solid waste collection services; and
(III) contains a relative quantity of hazardous substances no greater than the relative quantity of hazardous substances contained in waste material generated by a typical single-family household.
(B) Examples
Examples of municipal solid waste under subparagraph (A) include food and yard waste, paper, clothing, appliances, consumer product packaging, disposable diapers, office supplies, cosmetics, glass and metal food containers, elementary or secondary school science laboratory waste, and household hazardous waste.
(C) Exclusions
The term "municipal solid waste" does not include—
(i) combustion ash generated by resource recovery facilities or municipal incinerators; or
(ii) waste material from manufacturing or processing operations (including pollution control operations) that is not essentially the same as waste normally generated by households.
(5) Burden of proof
In the case of an action, with respect to response costs at a facility on the National Priorities List, brought under this section or
(A) a party, other than a Federal, State, or local government, with respect to municipal solid waste disposed of on or after April 1, 2001; or
(B) any party with respect to municipal solid waste disposed of before April 1, 2001, the burden of proof shall be on the party bringing the action to demonstrate that the conditions described in paragraphs (1) and (4) for exemption for entities and organizations described in paragraph (1)(B) and (C) are not met.
(6) Certain actions not permitted
No contribution action may be brought by a party, other than a Federal, State, or local government, under this chapter with respect to circumstances described in paragraph (1)(A).
(7) Costs and fees
A nongovernmental entity that commences, after January 11, 2002, a contribution action under this chapter shall be liable to the defendant for all reasonable costs of defending the action, including all reasonable attorney's fees and expert witness fees, if the defendant is not liable for contribution based on an exemption under this subsection or subsection (o).
(q) Contiguous properties
(1) Not considered to be an owner or operator
(A) In general
A person that owns real property that is contiguous to or otherwise similarly situated with respect to, and that is or may be contaminated by a release or threatened release of a hazardous substance from, real property that is not owned by that person shall not be considered to be an owner or operator of a vessel or facility under paragraph (1) or (2) of subsection (a) solely by reason of the contamination if—
(i) the person did not cause, contribute, or consent to the release or threatened release;
(ii) the person is not—
(I) potentially liable, or affiliated with any other person that is potentially liable, for response costs at a facility through any direct or indirect familial relationship or any contractual, corporate, or financial relationship (other than a contractual, corporate, or financial relationship that is created by a contract for the sale of goods or services); or
(II) the result of a reorganization of a business entity that was potentially liable;
(iii) the person takes reasonable steps to—
(I) stop any continuing release;
(II) prevent any threatened future release; and
(III) prevent or limit human, environmental, or natural resource exposure to any hazardous substance released on or from property owned by that person;
(iv) the person provides full cooperation, assistance, and access to persons that are authorized to conduct response actions or natural resource restoration at the vessel or facility from which there has been a release or threatened release (including the cooperation and access necessary for the installation, integrity, operation, and maintenance of any complete or partial response action or natural resource restoration at the vessel or facility);
(v) the person—
(I) is in compliance with any land use restrictions established or relied on in connection with the response action at the facility; and
(II) does not impede the effectiveness or integrity of any institutional control employed in connection with a response action;
(vi) the person is in compliance with any request for information or administrative subpoena issued by the President under this chapter;
(vii) the person provides all legally required notices with respect to the discovery or release of any hazardous substances at the facility; and
(viii) at the time at which the person acquired the property, the person—
(I) conducted all appropriate inquiry within the meaning of
(II) did not know or have reason to know that the property was or could be contaminated by a release or threatened release of one or more hazardous substances from other real property not owned or operated by the person.
(B) Demonstration
To qualify as a person described in subparagraph (A), a person must establish by a preponderance of the evidence that the conditions in clauses (i) through (viii) of subparagraph (A) have been met.
(C) Bona fide prospective purchaser
Any person that does not qualify as a person described in this paragraph because the person had, or had reason to have, knowledge specified in subparagraph (A)(viii) at the time of acquisition of the real property may qualify as a bona fide prospective purchaser under
(D) Ground water
With respect to a hazardous substance from one or more sources that are not on the property of a person that is a contiguous property owner that enters ground water beneath the property of the person solely as a result of subsurface migration in an aquifer, subparagraph (A)(iii) shall not require the person to conduct ground water investigations or to install ground water remediation systems, except in accordance with the policy of the Environmental Protection Agency concerning owners of property containing contaminated aquifers, dated May 24, 1995.
(2) Effect of law
With respect to a person described in this subsection, nothing in this subsection—
(A) limits any defense to liability that may be available to the person under any other provision of law; or
(B) imposes liability on the person that is not otherwise imposed by subsection (a).
(3) Assurances
The Administrator may—
(A) issue an assurance that no enforcement action under this chapter will be initiated against a person described in paragraph (1); and
(B) grant a person described in paragraph (1) protection against a cost recovery or contribution action under
(r) Prospective purchaser and windfall lien
(1) Limitation on liability
Notwithstanding subsection (a)(1), a bona fide prospective purchaser whose potential liability for a release or threatened release is based solely on the bona fide prospective purchaser being considered to be an owner or operator of a facility shall not be liable as long as the bona fide prospective purchaser does not impede the performance of a response action or natural resource restoration.
(2) Lien
If there are unrecovered response costs incurred by the United States at a facility for which an owner of the facility is not liable by reason of paragraph (1), and if each of the conditions described in paragraph (3) is met, the United States shall have a lien on the facility, or may by agreement with the owner, obtain from the owner a lien on any other property or other assurance of payment satisfactory to the Administrator, for the unrecovered response costs.
(3) Conditions
The conditions referred to in paragraph (2) are the following:
(A) Response action
A response action for which there are unrecovered costs of the United States is carried out at the facility.
(B) Fair market value
The response action increases the fair market value of the facility above the fair market value of the facility that existed before the response action was initiated.
(4) Amount; duration
A lien under paragraph (2)—
(A) shall be in an amount not to exceed the increase in fair market value of the property attributable to the response action at the time of a sale or other disposition of the property;
(B) shall arise at the time at which costs are first incurred by the United States with respect to a response action at the facility;
(C) shall be subject to the requirements of subsection (l)(3); and
(D) shall continue until the earlier of—
(i) satisfaction of the lien by sale or other means; or
(ii) notwithstanding any statute of limitations under
(
Editorial Notes
References in Text
This chapter, referred to in text, was in the original "this Act", meaning
Such amendments, referred to in the last sentence of subsec. (a), probably means the amendments made by
Act of March 3, 1851 (
The Federal Insecticide, Fungicide, and Rodenticide Act, referred to in subsec. (i), is act June 25, 1947, ch. 125, as amended generally by
The Solid Waste Disposal Act, referred to in subsec. (k)(1), (3), (6)(E)(i), is title II of
Subchapter II of this chapter, referred to in subsec. (k)(4)(A) and (C), was in the original "title II of this Act", meaning title II of
The Hazardous and Solid Waste Amendments of 1984, referred to in subsec. (k)(6)(A), (E), is
The Small Business Act, referred to in subsec. (p)(1), is
Amendments
2018—Subsec. (r)(1).
2002—Subsecs. (o), (p).
Subsec. (q).
Subsec. (r).
1996—Subsec. (c)(1)(C).
Subsec. (n).
1994—Subsec. (c)(1)(C).
1986—Subsec. (a).
Subsec. (a)(1).
Subsec. (a)(3).
Subsec. (a)(4).
Subsec. (c)(1)(A).
Subsec. (c)(1)(B).
Subsec. (c)(1)(D).
Subsec. (d).
Subsec. (f)(1).
Subsec. (f)(2).
Subsec. (g).
Subsec. (h).
Subsec. (i).
Subsec. (j).
Subsec. (k)(5), (6).
Subsec. (l).
Subsec. (l)(3).
Subsec. (m).
Statutory Notes and Related Subsidiaries
Effective Date of 1996 Amendment
Amendment by
Effect on Concluded Actions
Central Hazardous Materials Fund
Similar provisions were contained in the following prior appropriation acts:
Recovery of Costs
Coordination of Titles I to IV of Pub. L. 99–499
Any provision of titles I to IV of
1 See References in Text note below.
§9608. Financial responsibility
(a) Establishment and maintenance by owner or operator of vessel; amount; failure to obtain certification of compliance
(1) The owner or operator of each vessel (except a nonself-propelled barge that does not carry hazardous substances as cargo) over three hundred gross tons that uses any port or place in the United States or the navigable waters or any offshore facility, shall establish and maintain, in accordance with regulations promulgated by the President, evidence of financial responsibility of $300 per gross ton (or for a vessel carrying hazardous substances as cargo, or $5,000,000, whichever is greater) to cover the liability prescribed under paragraph (1) of
(2) The Secretary of the Treasury shall withhold or revoke the clearance required by
(3) The Secretary of Transportation, in accordance with regulations issued by him, shall (A) deny entry to any port or place in the United States or navigable waters to, and (B) detain at the port or place in the United States from which it is about to depart for any other port or place in the United States, any vessel subject to this subsection that, upon request, does not produce certification furnished by the President that the financial responsibility provisions of paragraph (1) of this subsection have been complied with.
(4) In addition to the financial responsibility provisions of paragraph (1) of this subsection, the President shall require additional evidence of financial responsibility for incineration vessels in such amounts, and to cover such liabilities recognized by law, as the President deems appropriate, taking into account the potential risks posed by incineration and transport for incineration, and any other factors deemed relevant.
(b) Establishment and maintenance by owner or operator of production, etc., facilities; amount; adjustment; consolidated form of responsibility; coverage of motor carriers
(1) Beginning not earlier than five years after December 11, 1980, the President shall promulgate requirements (for facilities in addition to those under subtitle C of the Solid Waste Disposal Act [
(2) The level of financial responsibility shall be initially established, and, when necessary, adjusted to protect against the level of risk which the President in his discretion believes is appropriate based on the payment experience of the Fund, commercial insurers, courts settlements and judgments, and voluntary claims satisfaction. To the maximum extent practicable, the President shall cooperate with and seek the advice of the commercial insurance industry in developing financial responsibility requirements. Financial responsibility may be established by any one, or any combination, of the following: insurance, guarantee, surety bond, letter of credit, or qualification as a self-insurer. In promulgating requirements under this section, the President is authorized to specify policy or other contractual terms, conditions, or defenses which are necessary, or which are unacceptable, in establishing such evidence of financial responsibility in order to effectuate the purposes of this chapter.
(3) Regulations promulgated under this subsection shall incrementally impose financial responsibility requirements as quickly as can reasonably be achieved but in no event more than 4 years after the date of promulgation. Where possible, the level of financial responsibility which the President believes appropriate as a final requirement shall be achieved through incremental, annual increases in the requirements.
(4) Where a facility is owned or operated by more than one person, evidence of financial responsibility covering the facility may be established and maintained by one of the owners or operators, or, in consolidated form, by or on behalf of two or more owners or operators. When evidence of financial responsibility is established in a consolidated form, the proportional share of each participant shall be shown. The evidence shall be accompanied by a statement authorizing the applicant to act for and in behalf of each participant in submitting and maintaining the evidence of financial responsibility.
(5) The requirements for evidence of financial responsibility for motor carriers covered by this chapter shall be determined under
(c) Direct action
(1) Releases from vessels
In the case of a release or threatened release from a vessel, any claim authorized by
(2) Releases from facilities
In the case of a release or threatened release from a facility, any claim authorized by
(d) Limitation of guarantor liability
(1) Total liability
The total liability of any guarantor in a direct action suit brought under this section shall be limited to the aggregate amount of the monetary limits of the policy of insurance, guarantee, surety bond, letter of credit, or similar instrument obtained from the guarantor by the person subject to liability under
(2) Other liability
Nothing in this subsection shall be construed to limit any other State or Federal statutory, contractual, or common law liability of a guarantor, including, but not limited to, the liability of such guarantor for bad faith either in negotiating or in failing to negotiate the settlement of any claim. Nothing in this subsection shall be construed, interpreted, or applied to diminish the liability of any person under
(
Editorial Notes
References in Text
The Solid Waste Disposal Act, referred to in subsec. (b)(1), is title II of
This chapter, referred to in subsec. (b)(2), (5), was in the original "this Act", meaning
The Federal Bankruptcy Code, referred to in subsec. (c)(2), probably means a reference to Title 11, Bankruptcy.
Codification
In subsec. (a)(2), "
In subsec. (b)(5), "
Amendments
1986—Subsec. (a)(1).
Subsec. (a)(4).
Subsec. (b)(2).
Subsec. (b)(3).
Subsec. (c).
Subsec. (d).
§9609. Civil penalties and awards
(a) Class I administrative penalty
(1) Violations
A civil penalty of not more than $25,000 per violation may be assessed by the President in the case of any of the following—
(A) A violation of the requirements of section 9603(a) or (b) of this title (relating to notice).
(B) A violation of the requirements of
(C) A violation of the requirements of
(D) A violation of an order under
(E) Any failure or refusal referred to in
(2) Notice and hearings
No civil penalty may be assessed under this subsection unless the person accused of the violation is given notice and opportunity for a hearing with respect to the violation.
(3) Determining amount
In determining the amount of any penalty assessed pursuant to this subsection, the President shall take into account the nature, circumstances, extent and gravity of the violation or violations and, with respect to the violator, ability to pay, any prior history of such violations, the degree of culpability, economic benefit or savings (if any) resulting from the violation, and such other matters as justice may require.
(4) Review
Any person against whom a civil penalty is assessed under this subsection may obtain review thereof in the appropriate district court of the United States by filing a notice of appeal in such court within 30 days from the date of such order and by simultaneously sending a copy of such notice by certified mail to the President. The President shall promptly file in such court a certified copy of the record upon which such violation was found or such penalty imposed. If any person fails to pay an assessment of a civil penalty after it has become a final and unappealable order or after the appropriate court has entered final judgment in favor of the United States, the President may request the Attorney General of the United States to institute a civil action in an appropriate district court of the United States to collect the penalty, and such court shall have jurisdiction to hear and decide any such action. In hearing such action, the court shall have authority to review the violation and the assessment of the civil penalty on the record.
(5) Subpoenas
The President may issue subpoenas for the attendance and testimony of witnesses and the production of relevant papers, books, or documents in connection with hearings under this subsection. In case of contumacy or refusal to obey a subpoena issued pursuant to this paragraph and served upon any person, the district court of the United States for any district in which such person is found, resides, or transacts business, upon application by the United States and after notice to such person, shall have jurisdiction to issue an order requiring such person to appear and give testimony before the administrative law judge or to appear and produce documents before the administrative law judge, or both, and any failure to obey such order of the court may be punished by such court as a contempt thereof.
(b) Class II administrative penalty
A civil penalty of not more than $25,000 per day for each day during which the violation continues may be assessed by the President in the case of any of the following—
(1) A violation of the notice requirements of section 9603(a) or (b) of this title.
(2) A violation of
(3) A violation of the requirements of
(4) A violation of an order under
(5) Any failure or refusal referred to in
In the case of a second or subsequent violation the amount of such penalty may be not more than $75,000 for each day during which the violation continues. Any civil penalty under this subsection shall be assessed and collected in the same manner, and subject to the same provisions, as in the case of civil penalties assessed and collected after notice and opportunity for hearing on the record in accordance with
(c) Judicial assessment
The President may bring an action in the United States district court for the appropriate district to assess and collect a penalty of not more than $25,000 per day for each day during which the violation (or failure or refusal) continues in the case of any of the following—
(1) A violation of the notice requirements of section 9603(a) or (b) of this title.
(2) A violation of
(3) A violation of the requirements of
(4) A violation of an order under
(5) Any failure or refusal referred to in
In the case of a second or subsequent violation (or failure or refusal), the amount of such penalty may be not more than $75,000 for each day during which the violation (or failure or refusal) continues. For additional provisions providing for judicial assessment of civil penalties for failure to comply with a request or order under
(d) Awards
The President may pay an award of up to $10,000 to any individual who provides information leading to the arrest and conviction of any person for a violation subject to a criminal penalty under this chapter, including any violation of
(e) Procurement procedures
Notwithstanding any other provision of law, any executive agency may use competitive procedures or procedures other than competitive procedures to procure the services of experts for use in preparing or prosecuting a civil or criminal action under this chapter, whether or not the expert is expected to testify at trial. The executive agency need not provide any written justification for the use of procedures other than competitive procedures when procuring such expert services under this chapter and need not furnish for publication in the Commerce Business Daily or otherwise any notice of solicitation or synopsis with respect to such procurement.
(f) Savings clause
Action taken by the President pursuant to this section shall not affect or limit the President's authority to enforce any provisions of this chapter.
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (d) to (f), was in the original "this Act", meaning
Amendments
1986—
Statutory Notes and Related Subsidiaries
Coordination of Titles I to IV of Pub. L. 99–499
Any provision of titles I to IV of
§9610. Employee protection
(a) Activities of employee subject to protection
No person shall fire or in any other way discriminate against, or cause to be fired or discriminated against, any employee or any authorized representative of employees by reason of the fact that such employee or representative has provided information to a State or to the Federal Government, filed, instituted, or caused to be filed or instituted any proceeding under this chapter, or has testified or is about to testify in any proceeding resulting from the administration or enforcement of the provisions of this chapter.
(b) Administrative grievance procedure in cases of alleged violations
Any employee or a representative of employees who believes that he has been fired or otherwise discriminated against by any person in violation of subsection (a) of this section may, within thirty days after such alleged violation occurs, apply to the Secretary of Labor for a review of such firing or alleged discrimination. A copy of the application shall be sent to such person, who shall be the respondent. Upon receipt of such application, the Secretary of Labor shall cause such investigation to be made as he deems appropriate. Such investigation shall provide an opportunity for a public hearing at the request of any party to such review to enable the parties to present information relating to such alleged violation. The parties shall be given written notice of the time and place of the hearing at least five days prior to the hearing. Any such hearing shall be of record and shall be subject to
(c) Assessment of costs and expenses against violator subsequent to issuance of order of abatement
Whenever an order is issued under this section to abate such violation, at the request of the applicant a sum equal to the aggregate amount of all costs and expenses (including the attorney's fees) determined by the Secretary of Labor to have been reasonably incurred by the applicant for, or in connection with, the institution and prosecution of such proceedings, shall be assessed against the person committing such violation.
(d) Defenses
This section shall have no application to any employee who acting without discretion from his employer (or his agent) deliberately violates any requirement of this chapter.
(e) Presidential evaluations of potential loss of shifts of employment resulting from administration or enforcement of provisions; investigations; procedures applicable, etc.
The President shall conduct continuing evaluations of potential loss of shifts of employment which may result from the administration or enforcement of the provisions of this chapter, including, where appropriate, investigating threatened plant closures or reductions in employment allegedly resulting from such administration or enforcement. Any employee who is discharged, or laid off, threatened with discharge or layoff, or otherwise discriminated against by any person because of the alleged results of such administration or enforcement, or any representative of such employee, may request the President to conduct a full investigation of the matter and, at the request of any party, shall hold public hearings, require the parties, including the employer involved, to present information relating to the actual or potential effect of such administration or enforcement on employment and any alleged discharge, layoff, or other discrimination, and the detailed reasons or justification therefore.1 Any such hearing shall be of record and shall be subject to
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (a), (b), (d), and (e), was in the original "this Act", meaning
§9611. Uses of Fund
(a) In general
For the purposes specified in this section there is authorized to be appropriated from the Hazardous Substance Superfund established under subchapter A of
(1) Payment of governmental response costs incurred pursuant to
(2) Payment of any claim for necessary response costs incurred by any other person as a result of carrying out the national contingency plan established under section 1321(c) 1 of title 33 and amended by
(3) Payment of any claim authorized by subsection (b) of this section and finally decided pursuant to
(4) Payment of costs specified under subsection (c) of this section.
(5)
(6)
The President shall not pay for any administrative costs or expenses out of the Fund unless such costs and expenses are reasonably necessary for and incidental to the implementation of this subchapter.
(b) Additional authorized purposes
(1) In general
Claims asserted and compensable but unsatisfied under provisions of
(2) Limitation on payment of natural resource claims
(A) General requirements
No natural resource claim may be paid from the Fund unless the President determines that the claimant has exhausted all administrative and judicial remedies to recover the amount of such claim from persons who may be liable under
(B) Definition
As used in this paragraph, the term "natural resource claim" means any claim for injury to, or destruction or loss of, natural resources. The term does not include any claim for the costs of natural resource damage assessment.
(c) Peripheral matters and limitations
Uses of the Fund under subsection (a) of this section include—
(1) The costs of assessing both short-term and long-term injury to, destruction of, or loss of any natural resources resulting from a release of a hazardous substance.
(2) The costs of Federal or State or Indian tribe efforts in the restoration, rehabilitation, or replacement or acquiring the equivalent of any natural resources injured, destroyed, or lost as a result of a release of a hazardous substance.
(3) Subject to such amounts as are provided in appropriation Acts, the costs of a program to identify, investigate, and take enforcement and abatement action against releases of hazardous substances.
(4) Any costs incurred in accordance with subsection (m) of this section (relating to ATSDR) and
(5) Subject to such amounts as are provided in appropriation Acts, the costs of providing equipment and similar overhead, related to the purposes of this chapter and
(6) Subject to such amounts as are provided in appropriation Acts, the costs of a program to protect the health and safety of employees involved in response to hazardous substance releases. Such program shall be developed jointly by the Environmental Protection Agency, the Occupational Safety and Health Administration, and the National Institute for Occupational Safety and Health and shall include, but not be limited to, measures for identifying and assessing hazards to which persons engaged in removal, remedy, or other response to hazardous substances may be exposed, methods to protect workers from such hazards, and necessary regulatory and enforcement measures to assure adequate protection of such employees.
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(d) Additional limitations
(1) No money in the Fund may be used under subsection (c)(1) and (2) of this section, nor for the payment of any claim under subsection (b) of this section, where the injury, destruction, or loss of natural resources and the release of a hazardous substance from which such damages resulted have occurred wholly before December 11, 1980.
(2) No money in the Fund may be used for the payment of any claim under subsection (b) of this section where such expenses are associated with injury or loss resulting from long-term exposure to ambient concentrations of air pollutants from multiple or diffuse sources.
(e) Funding requirements respecting moneys in Fund; limitation on certain claims; Fund use outside Federal property boundaries
(1) Claims against or presented to the Fund shall not be valid or paid in excess of the total money in the Fund at any one time. Such claims become valid only when additional money is collected, appropriated, or otherwise added to the Fund. Should the total claims outstanding at any time exceed the current balance of the Fund, the President shall pay such claims, to the extent authorized under this section, in full in the order in which they were finally determined.
(2) In any fiscal year, 85 percent of the money credited to the Fund under subchapter II 1 of this chapter shall be available only for the purposes specified in paragraphs (1), (2), and (4) of subsection (a) of this section. No money in the Fund may be used for the payment of any claim under subsection (a)(3) or subsection (b) of this section in any fiscal year for which the President determines that all of the Fund is needed for response to threats to public health from releases or threatened releases of hazardous substances.
(3) No money in the Fund shall be available for remedial action, other than actions specified in subsection (c) of this section, with respect to federally owned facilities; except that money in the Fund shall be available for the provision of alternative water supplies (including the reimbursement of costs incurred by a municipality) in any case involving groundwater contamination outside the boundaries of a federally owned facility in which the federally owned facility is not the only potentially responsible party.
(4) Paragraphs (1) and (4) of subsection (a) of this section shall in the aggregate be subject to such amounts as are provided in appropriation Acts.
(f) Obligation of moneys by Federal officials; obligation of moneys or settlement of claims by State officials or Indian tribe
The President is authorized to promulgate regulations designating one or more Federal officials who may obligate money in the Fund in accordance with this section or portions thereof. The President is also authorized to delegate authority to obligate money in the Fund or to settle claims to officials of a State or Indian tribe operating under a contract or cooperative agreement with the Federal Government pursuant to
(g) Notice to potential injured parties by owner and operator of vessel or facility causing release of substance; rules and regulations
The President shall provide for the promulgation of rules and regulations with respect to the notice to be provided to potential injured parties by an owner and operator of any vessel, or facility from which a hazardous substance has been released. Such rules and regulations shall consider the scope and form of the notice which would be appropriate to carry out the purposes of this subchapter. Upon promulgation of such rules and regulations, the owner and operator of any vessel or facility from which a hazardous substance has been released shall provide notice in accordance with such rules and regulations. With respect to releases from public vessels, the President shall provide such notification as is appropriate to potential injured parties. Until the promulgation of such rules and regulations, the owner and operator of any vessel or facility from which a hazardous substance has been released shall provide reasonable notice to potential injured parties by publication in local newspapers serving the affected area.
(h) Repealed. Pub. L. 99–499, title I, §111(c)(2), Oct. 17, 1986, 100 Stat. 1643
(i) Restoration, etc., of natural resources
Except in a situation requiring action to avoid an irreversible loss of natural resources or to prevent or reduce any continuing danger to natural resources or similar need for emergency action, funds may not be used under this chapter for the restoration, rehabilitation, or replacement or acquisition of the equivalent of any natural resources until a plan for the use of such funds for such purposes has been developed and adopted by affected Federal agencies and the Governor or Governors of any State having sustained damage to natural resources within its borders, belonging to, managed by or appertaining to such State, and by the governing body of any Indian tribe having sustained damage to natural resources belonging to, managed by, controlled by, or appertaining to such tribe, or held in trust for the benefit of such tribe, or belonging to a member of such tribe if such resources are subject to a trust restriction on alienation, after adequate public notice and opportunity for hearing and consideration of all public comment.
(j) Use of Post-closure Liability Fund
The President shall use the money in the Post-closure Liability Fund for any of the purposes specified in subsection (a) of this section with respect to a hazardous waste disposal facility for which liability has transferred to such fund under
(k) Inspector General
In each fiscal year, the Inspector General of each department, agency, or instrumentality of the United States which is carrying out any authority of this chapter shall conduct an annual audit of all payments, obligations, reimbursements, or other uses of the Fund in the prior fiscal year, to assure that the Fund is being properly administered and that claims are being appropriately and expeditiously considered. The audit shall include an examination of a sample of agreements with States (in accordance with the provisions of the Single Audit Act [
(l) Foreign claimants
To the extent that the provisions of this chapter permit, a foreign claimant may assert a claim to the same extent that a United States claimant may assert a claim if—
(1) the release of a hazardous substance occurred (A) in the navigable waters or (B) in or on the territorial sea or adjacent shoreline of a foreign country of which the claimant is a resident;
(2) the claimant is not otherwise compensated for his loss;
(3) the hazardous substance was released from a facility or from a vessel located adjacent to or within the navigable waters or was discharged in connection with activities conducted under the Outer Continental Shelf Lands Act, as amended (
(4) recovery is authorized by a treaty or an executive agreement between the United States and foreign country involved, or if the Secretary of State, in consultation with the Attorney General and other appropriate officials, certifies that such country provides a comparable remedy for United States claimants.
(m) Agency for Toxic Substances and Disease Registry
There shall be directly available to the Agency for Toxic Substances and Disease Registry to be used for the purpose of carrying out activities described in subsection (c)(4) and
(n) Limitations on research, development, and demonstration program
(1) Section 9660(b)
For each of the fiscal years 1987, 1988, 1989, 1990, 1991, 1992, 1993, and 1994, not more than $20,000,000 of the amounts available in the Fund may be used for the purposes of carrying out the applied research, development, and demonstration program for alternative or innovative technologies and training program authorized under
(2) Section 9660(a)
From the amounts available in the Fund, not more than the following amounts may be used for the purposes of
(A) For the fiscal year 1987, $3,000,000.
(B) For the fiscal year 1988, $10,000,000.
(C) For the fiscal year 1989, $20,000,000.
(D) For the fiscal year 1990, $30,000,000.
(E) For each of the fiscal years 1991, 1992, 1993, and 1994, $35,000,000.
No more than 10 percent of such amounts shall be used for training under
(3) Section 9660(d)
For each of the fiscal years 1987, 1988, 1989, 1990, 1991, 1992, 1993, and 1994, not more than $5,000,000 of the amounts available in the Fund may be used for the purposes of
(o) Notification procedures for limitations on certain payments
Not later than 90 days after October 17, 1986, the President shall develop and implement procedures to adequately notify, as soon as practicable after a site is included on the National Priorities List, concerned local and State officials and other concerned persons of the limitations, set forth in subsection (a)(2) of this section, on the payment of claims for necessary response costs incurred with respect to such site.
(p) General revenue share of Superfund
(1) In general
The following sums are authorized to be appropriated, out of any money in the Treasury not otherwise appropriated, to the Hazardous Substance Superfund:
(A) For fiscal year 1987, $212,500,000.
(B) For fiscal year 1988, $212,500,000.
(C) For fiscal year 1989, $212,500,000.
(D) For fiscal year 1990, $212,500,000.
(E) For fiscal year 1991, $212,500,000.
(F) For fiscal year 1992, $212,500,000.
(G) For fiscal year 1993, $212,500,000.
(H) For fiscal year 1994, $212,500,000.
In addition there is authorized to be appropriated to the Hazardous Substance Superfund for each fiscal year an amount equal to so much of the aggregate amount authorized to be appropriated under this subsection (and paragraph (2) of section 9631(b) 1 of this title) as has not been appropriated before the beginning of the fiscal year involved.
(2) Computation
The amounts authorized to be appropriated under paragraph (1) of this subsection in a given fiscal year shall be available only to the extent that such amount exceeds the amount determined by the Secretary under
(
Editorial Notes
References in Text
Title II of
The Intervention on the High Seas Act, referred to in subsec. (a)(1), is
Section 304 of this Act, referred to in subsec. (b), is section 304 of
Fishery conservation zone, referred to in subsec. (b), probably means the fishery conservation zone established by
This chapter, referred to in subsecs. (c)(5), (i), (k), and (l), was in the original "this Act", meaning
Subsection (f) of section 118 of the Superfund Amendments and Reauthorization Act of 1986, referred to in subsec. (c)(14), is section 118(f) of
Subchapter II of this chapter, referred to in subsec. (e)(2), was in the original "title II of this Act", meaning title II of
The Single Audit Act, referred to in subsec. (k), probably means the Single Audit Act of 1984,
The Outer Continental Shelf Lands Act as amended, referred to in subsec. (l)(3), is act Aug. 7, 1953, ch. 345,
The Deepwater Port Act of 1974, as amended, referred to in subsec. (l)(3), is
Amendments
1990—Subsec. (a).
Subsec. (c)(11).
Subsec. (c)(12).
Subsec. (m).
Subsec. (n)(1).
Subsec. (n)(2)(E).
Subsec. (n)(3).
Subsec. (p)(1)(F) to (H).
1989—Subsec. (c)(12).
1986—Subsec. (a).
Subsec. (b).
Subsec. (c).
Subsec. (e)(2).
Subsec. (e)(3).
Subsec. (f).
Subsec. (h).
"(1) In accordance with regulations promulgated under
"(2) Any determination or assessment of damages for injury to, destruction of, or loss of natural resources for the purposes of this chapter and section 1321(f)(4) and (5) of title 33 shall have the force and effect of a rebuttable presumption on behalf of any claimant (including a trustee under
Subsec. (i).
Subsec. (k).
Subsecs. (m) to (p).
Statutory Notes and Related Subsidiaries
Termination of Reporting Requirements
For termination, effective May 15, 2000, of provisions in subsec. (k) of this section relating to the requirement that the Inspector General submit an annual report to Congress on the audit report required under subsec. (k), see section 3003 of
Satisfaction of Superfund Audit Requirements by Inspector General of the Department of Defense
"(a)
"(b)
Coordination of Titles I to IV of Pub. L. 99–499
Any provision of titles I to IV of
1 See References in Text note below.
§9612. Claims procedure
(a) Claims against Fund for response costs
No claim may be asserted against the Fund pursuant to
(b) Forms and procedures applicable
(1) Prescribing forms and procedures
The President shall prescribe appropriate forms and procedures for claims filed hereunder, which shall include a provision requiring the claimant to make a sworn verification of the claim to the best of his knowledge. Any person who knowingly gives or causes to be given any false information as a part of any such claim shall, upon conviction, be fined in accordance with the applicable provisions of title 18 or imprisoned for not more than 3 years (or not more than 5 years in the case of a second or subsequent conviction), or both.
(2) Payment or request for hearing
The President may, if satisfied that the information developed during the processing of the claim warrants it, make and pay an award of the claim, except that no claim may be awarded to the extent that a judicial judgment has been made on the costs that are the subject of the claim. If the President declines to pay all or part of the claim, the claimant may, within 30 days after receiving notice of the President's decision, request an administrative hearing.
(3) Burden of proof
In any proceeding under this subsection, the claimant shall bear the burden of proving his claim.
(4) Decisions
All administrative decisions made hereunder shall be in writing, with notification to all appropriate parties, and shall be rendered within 90 days of submission of a claim to an administrative law judge, unless all the parties to the claim agree in writing to an extension or unless the President, in his discretion, extends the time limit for a period not to exceed sixty days.
(5) Finality and appeal
All administrative decisions hereunder shall be final, and any party to the proceeding may appeal a decision within 30 days of notification of the award or decision. Any such appeal shall be made to the Federal district court for the district where the release or threat of release took place. In any such appeal, the decision shall be considered binding and conclusive, and shall not be overturned except for arbitrary or capricious abuse of discretion.
(6) Payment
Within 20 days after the expiration of the appeal period for any administrative decision concerning an award, or within 20 days after the final judicial determination of any appeal taken pursuant to this subsection, the President shall pay any such award from the Fund. The President shall determine the method, terms, and time of payment.
(c) Subrogation rights; actions maintainable
(1) Payment of any claim by the Fund under this section shall be subject to the United States Government acquiring by subrogation the rights of the claimant to recover those costs of removal or damages for which it has compensated the claimant from the person responsible or liable for such release.
(2) Any person, including the Fund, who pays compensation pursuant to this chapter to any claimant for damages or costs resulting from a release of a hazardous substance shall be subrogated to all rights, claims, and causes of action for such damages and costs of removal that the claimant has under this chapter or any other law.
(3) Upon request of the President, the Attorney General shall commence an action on behalf of the Fund to recover any compensation paid by the Fund to any claimant pursuant to this subchapter, and, without regard to any limitation of liability, all interest, administrative and adjudicative costs, and attorney's fees incurred by the Fund by reason of the claim. Such an action may be commenced against any owner, operator, or guarantor, or against any other person who is liable, pursuant to any law, to the compensated claimant or to the Fund, for the damages or costs for which compensation was paid.
(d) Statute of limitations
(1) Claims for recovery of costs
No claim may be presented under this section for recovery of the costs referred to in
(2) Claims for recovery of damages
No claim may be presented under this section for recovery of the damages referred to in
(A) The date of the discovery of the loss and its connection with the release in question.
(B) The date on which final regulations are promulgated under
(3) Minors and incompetents
The time limitations contained herein shall not begin to run—
(A) against a minor until the earlier of the date when such minor reaches 18 years of age or the date on which a legal representative is duly appointed for the minor, or
(B) against an incompetent person until the earlier of the date on which such person's incompetency ends or the date on which a legal representative is duly appointed for such incompetent person.
(e) Other statutory or common law claims not waived, etc.
Regardless of any State statutory or common law to the contrary, no person who asserts a claim against the Fund pursuant to this subchapter shall be deemed or held to have waived any other claim not covered or assertable against the Fund under this subchapter arising from the same incident, transaction, or set of circumstances, nor to have split a cause of action. Further, no person asserting a claim against the Fund pursuant to this subchapter shall as a result of any determination of a question of fact or law made in connection with that claim be deemed or held to be collaterally estopped from raising such question in connection with any other claim not covered or assertable against the Fund under this subchapter arising from the same incident, transaction, or set of circumstances.
(f) Double recovery prohibited
Where the President has paid out of the Fund for any response costs or any costs specified under section 9611(c)(1) or (2) of this title, no other claim may be paid out of the Fund for the same costs.
(
Editorial Notes
References in Text
This chapter, referred to in subsec. (c)(2), was in the original "this Act", meaning
Amendments
1986—Subsec. (a).
Subsec. (b)(1).
Subsec. (b)(2) to (6).
Subsec. (d).
Subsec. (f).
Statutory Notes and Related Subsidiaries
Coordination of Titles I to IV of Pub. L. 99–499
Any provision of titles I to IV of
§9613. Civil proceedings
(a) Review of regulations in Circuit Court of Appeals of the United States for the District of Columbia
Review of any regulation promulgated under this chapter may be had upon application by any interested person only in the Circuit Court of Appeals of the United States for the District of Columbia. Any such application shall be made within ninety days from the date of promulgation of such regulations. Any matter with respect to which review could have been obtained under this subsection shall not be subject to judicial review in any civil or criminal proceeding for enforcement or to obtain damages or recovery of response costs.
(b) Jurisdiction; venue
Except as provided in subsections (a) and (h) of this section, the United States district courts shall have exclusive original jurisdiction over all controversies arising under this chapter, without regard to the citizenship of the parties or the amount in controversy. Venue shall lie in any district in which the release or damages occurred, or in which the defendant resides, may be found, or has his principal office. For the purposes of this section, the Fund shall reside in the District of Columbia.
(c) Controversies or other matters resulting from tax collection or tax regulation review
The provisions of subsections (a) and (b) of this section shall not apply to any controversy or other matter resulting from the assessment of collection of any tax, as provided by subchapter II 1 of this chapter, or to the review of any regulation promulgated under title 26.
(d) Litigation commenced prior to December 11, 1980
No provision of this chapter shall be deemed or held to moot any litigation concerning any release of any hazardous substance, or any damages associated therewith, commenced prior to December 11, 1980.
(e) Nationwide service of process
In any action by the United States under this chapter, process may be served in any district where the defendant is found, resides, transacts business, or has appointed an agent for the service of process.
(f) Contribution
(1) Contribution
Any person may seek contribution from any other person who is liable or potentially liable under
(2) Settlement
A person who has resolved its liability to the United States or a State in an administrative or judicially approved settlement shall not be liable for claims for contribution regarding matters addressed in the settlement. Such settlement does not discharge any of the other potentially liable persons unless its terms so provide, but it reduces the potential liability of the others by the amount of the settlement.
(3) Persons not party to settlement
(A) If the United States or a State has obtained less than complete relief from a person who has resolved its liability to the United States or the State in an administrative or judicially approved settlement, the United States or the State may bring an action against any person who has not so resolved its liability.
(B) A person who has resolved its liability to the United States or a State for some or all of a response action or for some or all of the costs of such action in an administrative or judicially approved settlement may seek contribution from any person who is not party to a settlement referred to in paragraph (2).
(C) In any action under this paragraph, the rights of any person who has resolved its liability to the United States or a State shall be subordinate to the rights of the United States or the State. Any contribution action brought under this paragraph shall be governed by Federal law.
(g) Period in which action may be brought
(1) Actions for natural resource damages
Except as provided in paragraphs (3) and (4), no action may be commenced for damages (as defined in
(A) The date of the discovery of the loss and its connection with the release in question.
(B) The date on which regulations are promulgated under
With respect to any facility listed on the National Priorities List (NPL), any Federal facility identified under
(2) Actions for recovery of costs
An initial action for recovery of the costs referred to in
(A) for a removal action, within 3 years after completion of the removal action, except that such cost recovery action must be brought within 6 years after a determination to grant a waiver under
(B) for a remedial action, within 6 years after initiation of physical on-site construction of the remedial action, except that, if the remedial action is initiated within 3 years after the completion of the removal action, costs incurred in the removal action may be recovered in the cost recovery action brought under this subparagraph.
In any such action described in this subsection, the court shall enter a declaratory judgment on liability for response costs or damages that will be binding on any subsequent action or actions to recover further response costs or damages. A subsequent action or actions under
(3) Contribution
No action for contribution for any response costs or damages may be commenced more than 3 years after—
(A) the date of judgment in any action under this chapter for recovery of such costs or damages, or
(B) the date of an administrative order under
(4) Subrogation
No action based on rights subrogated pursuant to this section by reason of payment of a claim may be commenced under this subchapter more than 3 years after the date of payment of such claim.
(5) Actions to recover indemnification payments
Notwithstanding any other provision of this subsection, where a payment pursuant to an indemnification agreement with a response action contractor is made under
(6) Minors and incompetents
The time limitations contained herein shall not begin to run—
(A) against a minor until the earlier of the date when such minor reaches 18 years of age or the date on which a legal representative is duly appointed for such minor, or
(B) against an incompetent person until the earlier of the date on which such incompetent's incompetency ends or the date on which a legal representative is duly appointed for such incompetent.
(h) Timing of review
No Federal court shall have jurisdiction under Federal law other than under
(1) An action under
(2) An action to enforce an order issued under
(3) An action for reimbursement under
(4) An action under
(5) An action under
(i) Intervention
In any action commenced under this chapter or under the Solid Waste Disposal Act [
(j) Judicial review
(1) Limitation
In any judicial action under this chapter, judicial review of any issues concerning the adequacy of any response action taken or ordered by the President shall be limited to the administrative record. Otherwise applicable principles of administrative law shall govern whether any supplemental materials may be considered by the court.
(2) Standard
In considering objections raised in any judicial action under this chapter, the court shall uphold the President's decision in selecting the response action unless the objecting party can demonstrate, on the administrative record, that the decision was arbitrary and capricious or otherwise not in accordance with law.
(3) Remedy
If the court finds that the selection of the response action was arbitrary and capricious or otherwise not in accordance with law, the court shall award (A) only the response costs or damages that are not inconsistent with the national contingency plan, and (B) such other relief as is consistent with the National Contingency Plan.
(4) Procedural errors
In reviewing alleged procedural errors, the court may disallow costs or damages only if the errors were so serious and related to matters of such central relevance to the action that the action would have been significantly changed had such errors not been made.
(k) Administrative record and participation procedures
(1) Administrative record
The President shall establish an administrative record upon which the President shall base the selection of a response action. The administrative record shall be available to the public at or near the facility at issue. The President also may place duplicates of the administrative record at any other location.
(2) Participation procedures
(A) Removal action
The President shall promulgate regulations in accordance with
(B) Remedial action
The President shall provide for the participation of interested persons, including potentially responsible parties, in the development of the administrative record on which the President will base the selection of remedial actions and on which judicial review of remedial actions will be based. The procedures developed under this subparagraph shall include, at a minimum, each of the following:
(i) Notice to potentially affected persons and the public, which shall be accompanied by a brief analysis of the plan and alternative plans that were considered.
(ii) A reasonable opportunity to comment and provide information regarding the plan.
(iii) An opportunity for a public meeting in the affected area, in accordance with
(iv) A response to each of the significant comments, criticisms, and new data submitted in written or oral presentations.
(v) A statement of the basis and purpose of the selected action.
For purposes of this subparagraph, the administrative record shall include all items developed and received under this subparagraph and all items described in the second sentence of
(C) Interim record
Until such regulations under subparagraphs (A) and (B) are promulgated, the administrative record shall consist of all items developed and received pursuant to current procedures for selection of the response action, including procedures for the participation of interested parties and the public. The development of an administrative record and the selection of response action under this chapter shall not include an adjudicatory hearing.
(D) Potentially responsible parties
The President shall make reasonable efforts to identify and notify potentially responsible parties as early as possible before selection of a response action. Nothing in this paragraph shall be construed to be a defense to liability.
(l) Notice of actions
Whenever any action is brought under this chapter in a court of the United States by a plaintiff other than the United States, the plaintiff shall provide a copy of the complaint to the Attorney General of the United States and to the Administrator of the Environmental Protection Agency.
(
Editorial Notes
References in Text
This chapter, referred to in text, was in the original "this Act", meaning
Subchapter II of this chapter, referred to in subsec. (c), was in the original "title II of this Act", meaning title II of
The Federal Rules of Civil Procedure, referred to in subsec. (f)(1), are set out in the Appendix to Title 28, Judiciary and Judicial Procedure.
The Solid Waste Disposal Act, referred to in subsec. (i), is title II of
Amendments
1986—Subsec. (b).
Subsec. (c).
Subsecs. (e) to (l).
1 See References in Text note below.
§9614. Relationship to other law
(a) Additional State liability or requirements with respect to release of substances within State
Nothing in this chapter shall be construed or interpreted as preempting any State from imposing any additional liability or requirements with respect to the release of hazardous substances within such State.
(b) Recovery under other State or Federal law of compensation for removal costs or damages, or payment of claims
Any person who receives compensation for removal costs or damages or claims pursuant to this chapter shall be precluded from recovering compensation for the same removal costs or damages or claims pursuant to any other State or Federal law. Any person who receives compensation for removal costs or damages or claims pursuant to any other Federal or State law shall be precluded from receiving compensation for the same removal costs or damages or claims as provided in this chapter.
(c) Recycled oil
(1) Service station dealers, etc.
No person (including the United States or any State) may recover, under the authority of subsection (a)(3) or (a)(4) of
(A) is not mixed with any other hazardous substance, and
(B) is stored, treated, transported, or otherwise managed in compliance with regulations or standards promulgated pursuant to section 3014 of the Solid Waste Disposal Act [
Nothing in this paragraph shall affect or modify in any way the obligations or liability of any person under any other provision of State or Federal law, including common law, for damages, injury, or loss resulting from a release or threatened release of any hazardous substance or for removal or remedial action or the costs of removal or remedial action.
(2) Presumption
Solely for the purposes of this subsection, a service station dealer may presume that a small quantity of used oil is not mixed with other hazardous substances if it—
(A) has been removed from the engine of a light duty motor vehicle or household appliances by the owner of such vehicle or appliances, and
(B) is presented, by such owner, to the dealer for collection, accumulation, and delivery to an oil recycling facility.
(3) Definition
For purposes of this subsection, the terms "used oil" and "recycled oil" have the same meanings as set forth in sections 1004(36) and 1004(37) of the Solid Waste Disposal Act [
(4) Effective date
The effective date of paragraphs (1) and (2) of this subsection shall be the effective date of regulations or standards promulgated under section 3014 of the Solid Waste Disposal Act [
(d) Financial responsibility of owner or operator of vessel or facility under State or local law, rule, or regulation
Except as provided in this subchapter, no owner or operator of a vessel or facility who establishes and maintains evidence of financial responsibility in accordance with this subchapter shall be required under any State or local law, rule, or regulation to establish or maintain any other evidence of financial responsibility in connection with liability for the release of a hazardous substance from such vessel or facility. Evidence of compliance with the financial responsibility requirements of this subchapter shall be accepted by a State in lieu of any other requirement of financial responsibility imposed by such State in connection with liability for the release of a hazardous substance from such vessel or facility.
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (a) and (b), was in the original "this Act", meaning
The Solid Waste Disposal Act, referred to in subsec. (c)(3), (4), is title II of
Amendments
1986—Subsec. (c).
§9615. Presidential delegation and assignment of duties or powers and promulgation of regulations
The President is authorized to delegate and assign any duties or powers imposed upon or assigned to him and to promulgate any regulations necessary to carry out the provisions of this subchapter.
(
Executive Documents
Ex. Ord. No. 12580. Superfund Implementation
Ex. Ord. No. 12580, Jan. 23, 1987, 52 F.R. 2923, as amended by Ex. Ord. No. 12777, §1(a), Oct. 18, 1991, 56 F.R. 54757; Ex. Ord. No. 13016, Aug. 28, 1996, 61 F.R. 45871; Ex. Ord. No. 13286, §43, Feb. 28, 2003, 68 F.R. 10627; Ex. Ord. No. 13308, June 20, 2003, 68 F.R. 37691, provided:
By the authority vested in me as President of the United States of America by Section 115 of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (
(2) The following agencies (in addition to other appropriate agencies) shall provide representatives to the National and Regional Response Teams to carry out their responsibilities under the NCP: Department of State, Department of Defense, Department of Justice, Department of the Interior, Department of Agriculture, Department of Commerce, Department of Labor, Department of Health and Human Services, Department of Transportation, Department of Energy, Department of Homeland Security, Environmental Protection Agency,, [sic] United States Coast Guard, and the Nuclear Regulatory Commission.
(3) Except for periods of activation because of response action, the representative of the Environmental Protection Agency ("EPA") shall be the chairman, and the representative of the United States Coast Guard shall be the vice chairman, of the NRT and these agencies' representatives shall be co-chairs of the Regional Response Teams ("the RRTs"). When the NRT or an RRT is activated for a response action, the EPA representative shall be the chairman when the release or threatened release or discharge or threatened discharge occurs in the inland zone, and the United States Coast Guard representative shall be the chairman when the release or threatened release or discharge or threatened discharge occurs in the coastal zone, unless otherwise agreed upon by the EPA and the United States Coast Guard representatives (inland and coastal zones are defined in the NCP).
(4) The RRTs may include representatives from State governments, local governments (as agreed upon by the States), and Indian tribal governments. Subject to the functions and authorities delegated to Executive departments and agencies in other sections of this order, the NRT shall provide policy and program direction to the RRTs.
(b)(1) The responsibility for the revision of the NCP and all the other functions vested in the President by Sections 105(a), (b), (c), (g) and (h), 125, and 301(f) of the Act [
(2) The function vested in the President by Section 118(p) of the Superfund Amendments and Reauthorization Act of 1986 (
(c) In accord with Section 107(f)(2)(A) of the Act [
(1) Secretary of Defense;
(2) Secretary of the Interior;
(3) Secretary of Agriculture;
(4) Secretary of Commerce;
(5) Secretary of Energy.
In the event of a spill, the above named Federal trustees for natural resources shall designate one trustee to act as Lead Administrative Trustee, the duties of which shall be defined in the regulations promulgated pursuant to Section 1006(e)(1) of OPA. If there are natural resource trustees other than those designated above which are acting in the event of a spill, those other trustees may join with the Federal trustees to name a Lead Administrative Trustee which shall exercise the duties defined in the regulations promulgated pursuant to Section 1006(e)(1) of OPA.
(d) Revisions to the NCP shall be made in consultation with members of the NRT prior to publication for notice and comment.
(e) All revisions to the NCP, whether in proposed or final form, shall be subject to review and approval by the Director of the Office of Management and Budget ("OMB").
(b) The functions vested in the President by Sections 104(e)(7)(C), 113(k)(2), 119(c)(7), and 121(f)(1) of the Act [
(c)(1) The functions vested in the President by Sections 104(a) and the second sentence of 126(b) of the Act [
(2) Subject to subsection (b) of this Section, the functions vested in the President by Sections 117(a) and (c), and 119 of the Act [
(d) Subject to subsections (a), (b) and (c) of this Section, the functions vested in the President by Sections 104(a), (b) and (c)(4), 113(k), 117(a) and (c), 119, and 121 of the Act [
(e)(1) Subject to subsections (a), (b), (c), and (d) of this Section, the functions vested in the President by Sections 104(a), (b), and (c)(4), and 121 of the Act [
(2) Subject to subsections (b), (c), and (d) of this Section, the functions vested in the President by Sections 104(b)(2), 113(k), 117(a) and (c), and 119 of the Act [
(f) Subject to subsections (a), (b), (c), (d), and (e) of this Section, the functions vested in the President by Sections 104(a), (b) and (c)(4), 113(k), 117(a) and (c), 119, and 121 of the Act [
(g) Subject to subsections (a), (b), (c), (d), (e), and (f) of this Section, the functions vested in the President by Sections 101(24), 104(a), (b), (c)(4) and (c)(9), 113(k), 117(a) and (c), 119, 121, and 126(b) of the Act [
(h) The functions vested in the President by Section 104(c)(3) of the Act [
(i) Subject to subsections (d), (e), (f), (g) and (h) of this Section, the functions vested in the President by Section 104(c) and (d) of the Act are delegated to the Coast Guard, the Secretary of Health and Human Services, the Director of the Federal Emergency Management Agency, and the Administrator in order to carry out the functions delegated to them by this Section.
(j)(1) The functions vested in the President by Section 104(e)(5)(A) are delegated to the heads of Executive departments and agencies, with respect to releases or threatened releases where either the release is on or the sole source of the release is from any facility or vessel under the jurisdiction, custody or control of those departments and agencies, to be exercised with the concurrence of the Attorney General.
(2) Subject to subsection (b) of this Section and paragraph (1) of this subsection, the functions vested in the President by Section 104(e) are delegated to the heads of Executive departments and agencies in order to carry out their functions under this Order or the Act.
(k) The functions vested in the President by Section 104(f), (g), (h), (i)(11), and (j) of the Act are delegated to the heads of Executive departments and agencies in order to carry out the functions delegated to them by this Section. The exercise of authority under Section 104(h) of the Act shall be subject to the approval of the Administrator of the Office of Federal Procurement Policy.
(b) Subject to subsection (a) of this Section, the functions vested in the President by Sections 116 and 105(d) are delegated to the Administrator.
(b)(1) Subject to subsection (a) of this Section, the functions vested in the President by Section 122 [
(2) Subject to subsection (a) of this Section, the functions vested in the President by Section 109 of the Act [
(c)(1) Subject to subsection[s] (a) and (b)(1) of this Section, the functions vested in the President by Sections 106(a) and 122 of the Act [
(2) Subject to subsection[s] (a) and (b)(2) of this Section, the functions vested in the President by Section 109 of the Act [
(3) Subject to subsections (a) and (b)(1) of this section, the functions vested in the President by sections 106(a) [
(d)(1) Subject to subsections (a), (b)(1), and (c)(1) of this Section, the functions vested in the President by Sections 106 and 122 of the Act [
(2) Subject to subsections (a), (b)(2), and (c)(2) of this Section, the functions vested in the President by Section 109 of the Act [
(3) Subject to subsections (a), (b)(1), and (c)(1) of this section, the functions vested in the President by sections 106(a) [
(e) Notwithstanding any other provision of this Order, the authority under Sections 104(e)(5)(A) and 106(a) of the Act [
(b) The functions vested in the President by Section 107(c)(3) of the Act are delegated to the Coast Guard with respect to any release or threatened release involving the coastal zone, Great Lakes waters, ports and harbors.
(c) Subject to subsection (b) of this Section, the functions vested in the President by Section 107(c)(3) of the Act are delegated to the Administrator.
(d) The functions vested in the President by Section 107(f)(1) of the Act are delegated to each of the Federal trustees for natural resources designated in the NCP for resources under their trusteeship.
(e) The functions vested in the President by Section 107(f)(2)(B) of the Act, to receive notification of the state natural resource trustee designations, are delegated to the Administrator.
(f) The functions vested in the President by Section 107(o) and (p) of the Act are delegated to the heads of the Executive departments and agencies, to be exercised in consultation with the Administrator, with respect to releases or threatened releases where either the release is on or the sole source of the release is from any facility under the jurisdiction, custody, or control of those departments and agencies.
(g) Subject to subsection (f) of this Section, the functions vested in the President by Section 107(o) and (p) of the Act are delegated to the Administrator except that, with respect to determinations regarding natural resource restoration, the Administrator shall make such determinations in consultation with the appropriate Federal natural resource trustee.
(b) Notwithstanding any other provision of this Order, the authority under the Act to require the Attorney General to commence litigation is retained by the President.
(c) The functions vested in the President by Section 113(g) of the Act [
(d) The functions vested in the President by Sections [sic] 310(d) and (e) of the Act [
(b)(1) The functions vested in the President by Section 108(a)(1) of the Act [
(2) Subject to Section 4(a) of this Order, the functions vested in the President by Section 109 of the Act [
(c)(1) The functions vested in the President by Section 108(b) of the Act are delegated to the Secretary of Transportation with respect to all transportation related facilities, including any pipeline, motor vehicle, rolling stock, or aircraft.
(2) Subject to Section 4(a) of this Order, the functions vested in the President by Section 109 of the Act, relating to violations of Section 108(a)(3) of the Act, are delegated to the Secretary of Transportation.
(3) Subject to Section 4(a) of this Order, the functions vested in the President by Section 109 of the Act, relating to violations of Section 108(b) of the Act, are delegated to the Secretary of Transportation with respect to all transportation related facilities, including any pipeline, motor vehicle, rolling stock, or aircraft.
(d)(1) Subject to subsection (c)(1) of this Section, the functions vested in the President by Section 108(a)(4) and (b) of the Act are delegated to the Administrator.
(2) Subject to Section 4(a) of this Order and subsection (c)(3) of this Section, the functions vested in the President by Section 109 of the Act, relating to violations of Section 108(a)(4) and (b) of the Act, are delegated to the Administrator.
(b) The functions vested in the President by Section 111(g) of the Act [
(c) Subject to subsection (b) of this Section, the functions vested in the President by Section 111(g) of the Act are delegated to the Administrator.
(b) The Administrator shall transfer to other agencies, from the Hazardous Substance Superfund out of sums appropriated, such amounts as the Administrator may determine necessary to carry out the purposes of the Act. These amounts shall be consistent with the President's Budget, within the total approved by the Congress, unless a revised amount is approved by OMB. Funds appropriated specifically for the Agency for Toxic Substances and Disease Registry ("ATSDR"), shall be directly transferred to ATSDR, consistent with fiscally responsible investment of trust fund money.
(c) The Administrator shall chair a budget task force composed of representatives of Executive departments and agencies having responsibilities under this Order or the Act. The Administrator shall also, as part of the budget request for the Environmental Protection Agency, submit to OMB a budget for the Hazardous Substance Superfund which is based on recommended levels developed by the budget task force. The Administrator may prescribe reporting and other forms, procedures, and guidelines to be used by the agencies of the Task Force in preparing the budget request, consistent with budgetary reporting requirements issued by OMB. The Administrator shall prescribe forms to agency task force members for reporting the expenditure of funds on a site specific basis.
(d) The Administrator and each department and agency head to whom funds are provided pursuant to this Section, with respect to funds provided to them, are authorized in accordance with Section 111(f) of the Act [
(e) The functions vested in the President by Section 112 of the Act [
(f) The functions vested in the President by Section 111(o) of the Act are delegated to the Administrator.
(g) The functions vested in the President by Section 117(e) of the Act [
(h) The functions vested in the President by Section 123 of the Act [
(i) Funds from the Hazardous Substance Superfund may be used, at the discretion of the Administrator or the Coast Guard, to pay for removal actions for releases or threatened releases from facilities or vessels under the jurisdiction, custody or control of Executive departments and agencies but must be reimbursed to the Hazardous Substance Superfund by such Executive department or agency.
(b) Executive Order No. 12088 of October 13, 1978, is amended by renumbering the current Section 1–802 as Section 1–803 and inserting the following new Section 1–802.
"1–802. Nothing in this Order shall create any right or benefit, substantive or procedural, enforceable at law by a party against the United States, its agencies, its officers, or any person."
(b)(1) The function vested in the President by Section 105(f) of the Act [
(2) Subject to paragraph 1 of this subsection, the functions vested in the President by Section 105(f) of the Act are delegated to the heads of Executive departments and agencies in order to carry out the functions delegated to them by this Order. Each Executive department and agency shall provide to the Administrator any requested information on minority contracting for inclusion in the Section 105(f) annual report.
(c) The functions vested in the President by Section 126(c) of the Act [
(d) The functions vested in the President by Section 301(c) of the Act [
(e) Each agency shall have authority to issue such regulations as may be necessary to carry out the functions delegated to them by this Order.
(f) The performance of any function under this Order shall be done in consultation with interested Federal departments and agencies represented on the NRT, as well as with any other interested Federal agency.
(g) The following functions vested in the President by the Act which have been delegated or assigned by this Order may be redelegated to the head of any Executive department or agency with his consent: functions set forth in Sections 2 (except subsection (b)), 3, 4(b), 4(c), 4(d), 5(b), 5(c), and 8(c) of this Order.
(h) Executive Order No. 12316 of August 14, 1981, is revoked.
(b) The functions vested in the President by Section 128(b)(1)(B)(ii) of the Act [
(c) The functions vested in the President by Section 128(b)(1)(E) of the Act [
(d) Subject to subsections (b) and (c) of this Section, the functions vested in the President by Section 128 of the Act [
§9616. Schedules
(a) Assessment and listing of facilities
It shall be a goal of this chapter that, to the maximum extent practicable—
(1) not later than January 1, 1988, the President shall complete preliminary assessments of all facilities that are contained (as of October 17, 1986) on the Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) including in each assessment a statement as to whether a site inspection is necessary and by whom it should be carried out; and
(2) not later than January 1, 1989, the President shall assure the completion of site inspections at all facilities for which the President has stated a site inspection is necessary pursuant to paragraph (1).
(b) Evaluation
Within 4 years after October 17, 1986, each facility listed (as of October 17, 1986) in the CERCLIS shall be evaluated if the President determines that such evaluation is warranted on the basis of a site inspection or preliminary assessment. The evaluation shall be in accordance with the criteria established in
(c) Explanations
If any of the goals established by subsection (a) or (b) are not achieved, the President shall publish an explanation of why such action could not be completed by the specified date.
(d) Commencement of RI/FS
The President shall assure that remedial investigations and feasibility studies (RI/FS) are commenced for facilities listed on the National Priorities List, in addition to those commenced prior to October 17, 1986, in accordance with the following schedule:
(1) not fewer than 275 by the date 36 months after October 17, 1986, and
(2) if the requirement of paragraph (1) is not met, not fewer than an additional 175 by the date 4 years after October 17, 1986, an additional 200 by the date 5 years after October 17, 1986, and a total of 650 by the date 5 years after October 17, 1986.
(e) Commencement of remedial action
The President shall assure that substantial and continuous physical on-site remedial action commences at facilities on the National Priorities List, in addition to those facilities on which remedial action has commenced prior to October 17, 1986, at a rate not fewer than:
(1) 175 facilities during the first 36-month period after October 17, 1986; and
(2) 200 additional facilities during the following 24 months after such 36-month period.
(
Editorial Notes
References in Text
This chapter, referred to in subsec. (a), was in the original "this Act", meaning
§9617. Public participation
(a) Proposed plan
Before adoption of any plan for remedial action to be undertaken by the President, by a State, or by any other person, under
(1) Publish a notice and brief analysis of the proposed plan and make such plan available to the public.
(2) Provide a reasonable opportunity for submission of written and oral comments and an opportunity for a public meeting at or near the facility at issue regarding the proposed plan and regarding any proposed findings under
The notice and analysis published under paragraph (1) shall include sufficient information as may be necessary to provide a reasonable explanation of the proposed plan and alternative proposals considered.
(b) Final plan
Notice of the final remedial action plan adopted shall be published and the plan shall be made available to the public before commencement of any remedial action. Such final plan shall be accompanied by a discussion of any significant changes (and the reasons for such changes) in the proposed plan and a response to each of the significant comments, criticisms, and new data submitted in written or oral presentations under subsection (a).
(c) Explanation of differences
After adoption of a final remedial action plan—
(1) if any remedial action is taken,
(2) if any enforcement action under
(3) if any settlement or consent decree under
and if such action, settlement, or decree differs in any significant respects from the final plan, the President or the State shall publish an explanation of the significant differences and the reasons such changes were made.
(d) Publication
For the purposes of this section, publication shall include, at a minimum, publication in a major local newspaper of general circulation. In addition, each item developed, received, published, or made available to the public under this section shall be available for public inspection and copying at or near the facility at issue.
(e) Grants for technical assistance
(1) Authority
Subject to such amounts as are provided in appropriations Acts and in accordance with rules promulgated by the President, the President may make grants available to any group of individuals which may be affected by a release or threatened release at any facility which is listed on the National Priorities List under the National Contingency Plan. Such grants may be used to obtain technical assistance in interpreting information with regard to the nature of the hazard, remedial investigation and feasibility study, record of decision, remedial design, selection and construction of remedial action, operation and maintenance, or removal action at such facility.
(2) Amount
The amount of any grant under this subsection may not exceed $50,000 for a single grant recipient. The President may waive the $50,000 limitation in any case where such waiver is necessary to carry out the purposes of this subsection. Each grant recipient shall be required, as a condition of the grant, to contribute at least 20 percent of the total of costs of the technical assistance for which such grant is made. The President may waive the 20 percent contribution requirement if the grant recipient demonstrates financial need and such waiver is necessary to facilitate public participation in the selection of remedial action at the facility. Not more than one grant may be made under this subsection with respect to a single facility, but the grant may be renewed to facilitate public participation at all stages of remedial action.
(
§9618. High priority for drinking water supplies
For purposes of taking action under
(
§9619. Response action contractors
(a) Liability of response action contractors
(1) Response action contractors
A person who is a response action contractor with respect to any release or threatened release of a hazardous substance or pollutant or contaminant from a vessel or facility shall not be liable under this subchapter or under any other Federal law to any person for injuries, costs, damages, expenses, or other liability (including but not limited to claims for indemnification or contribution and claims by third parties for death, personal injury, illness or loss of or damage to property or economic loss) which results from such release or threatened release.
(2) Negligence, etc.
Paragraph (1) shall not apply in the case of a release that is caused by conduct of the response action contractor which is negligent, grossly negligent, or which constitutes intentional misconduct.
(3) Effect on warranties; employer liability
Nothing in this subsection shall affect the liability of any person under any warranty under Federal, State, or common law. Nothing in this subsection shall affect the liability of an employer who is a response action contractor to any employee of such employer under any provision of law, including any provision of any law relating to worker's compensation.
(4) Governmental employees
A state employee or an employee of a political subdivision who provides services relating to response action while acting within the scope of his authority as a governmental employee shall have the same exemption from liability (subject to the other provisions of this section) as is provided to the response action contractor under this section.
(b) Savings provisions
(1) Liability of other persons
The defense provided by
(2) Burden of plaintiff
Nothing in this section shall affect the plaintiff's burden of establishing liability under this subchapter.
(c) Indemnification
(1) In general
The President may agree to hold harmless and indemnify any response action contractor meeting the requirements of this subsection against any liability (including the expenses of litigation or settlement) for negligence arising out of the contractor's performance in carrying out response action activities under this subchapter, unless such liability was caused by conduct of the contractor which was grossly negligent or which constituted intentional misconduct.
(2) Applicability
This subsection shall apply only with respect to a response action carried out under written agreement with—
(A) the President;
(B) any Federal agency;
(C) a State or political subdivision which has entered into a contract or cooperative agreement in accordance with
(D) any potentially responsible party carrying out any agreement under
(3) Source of funding
This subsection shall not be subject to
(4) Requirements
An indemnification agreement may be provided under this subsection only if the President determines that each of the following requirements are met:
(A) The liability covered by the indemnification agreement exceeds or is not covered by insurance available, at a fair and reasonable price, to the contractor at the time the contractor enters into the contract to provide response action, and adequate insurance to cover such liability is not generally available at the time the response action contract is entered into.
(B) The response action contractor has made diligent efforts to obtain insurance coverage from non-Federal sources to cover such liability.
(C) In the case of a response action contract covering more than one facility, the response action contractor agrees to continue to make such diligent efforts each time the contractor begins work under the contract at a new facility.
(5) Limitations
(A) Liability covered
Indemnification under this subsection shall apply only to response action contractor liability which results from a release of any hazardous substance or pollutant or contaminant if such release arises out of response action activities.
(B) Deductibles and limits
An indemnification agreement under this subsection shall include deductibles and shall place limits on the amount of indemnification to be made available.
(C) Contracts with potentially responsible parties
(i) Decision to indemnify
In deciding whether to enter into an indemnification agreement with a response action contractor carrying out a written contract or agreement with any potentially responsible party, the President shall determine an amount which the potentially responsible party is able to indemnify the contractor. The President may enter into such an indemnification agreement only if the President determines that such amount of indemnification is inadequate to cover any reasonable potential liability of the contractor arising out of the contractor's negligence in performing the contract or agreement with such party. The President shall make the determinations in the preceding sentences (with respect to the amount and the adequacy of the amount) taking into account the total net assets and resources of potentially responsible parties with respect to the facility at the time of such determinations.
(ii) Conditions
The President may pay a claim under an indemnification agreement referred to in clause (i) for the amount determined under clause (i) only if the contractor has exhausted all administrative, judicial, and common law claims for indemnification against all potentially responsible parties participating in the clean-up of the facility with respect to the liability of the contractor arising out of the contractor's negligence in performing the contract or agreement with such party. Such indemnification agreement shall require such contractor to pay any deductible established under subparagraph (B) before the contractor may recover any amount from the potentially responsible party or under the indemnification agreement.
(D) RCRA facilities
No owner or operator of a facility regulated under the Solid Waste Disposal Act [
(E) Persons retained or hired
A person retained or hired by a person described in subsection (e)(2)(B) shall be eligible for indemnification under this subsection only if the President specifically approves of the retaining or hiring of such person.
(6) Cost recovery
For purposes of
(7) Regulations
The President shall promulgate regulations for carrying out the provisions of this subsection. Before promulgation of the regulations, the President shall develop guidelines to carry out this section. Development of such guidelines shall include reasonable opportunity for public comment.
(8) Study
The Comptroller General shall conduct a study in the fiscal year ending September 30, 1989, on the application of this subsection, including whether indemnification agreements under this subsection are being used, the number of claims that have been filed under such agreements, and the need for this subsection. The Comptroller General shall report the findings of the study to Congress no later than September 30, 1989.
(d) Exception
The exemption provided under subsection (a) and the authority of the President to offer indemnification under subsection (c) shall not apply to any person covered by the provisions of paragraph (1), (2), (3), or (4) of
(e) Definitions
For purposes of this section—
(1) Response action contract
The term "response action contract" means any written contract or agreement entered into by a response action contractor (as defined in paragraph (2)(A) of this subsection) with—
(A) the President;
(B) any Federal agency;
(C) a State or political subdivision which has entered into a contract or cooperative agreement in accordance with
(D) any potentially responsible party carrying out an agreement under
to provide any remedial action under this chapter at a facility listed on the National Priorities List, or any removal under this chapter, with respect to any release or threatened release of a hazardous substance or pollutant or contaminant from the facility or to provide any evaluation, planning, engineering, surveying and mapping, design, construction, equipment, or any ancillary services thereto for such facility.
(2) Response action contractor
The term "response action contractor" means—
(A) any—
(i) person who enters into a response action contract with respect to any release or threatened release of a hazardous substance or pollutant or contaminant from a facility and is carrying out such contract; and 1
(ii) person, public or nonprofit private entity, conducting a field demonstration pursuant to
(iii) Recipients 2 of grants (including sub-grantees) under section 9660a 3 of this title for the training and education of workers who are or may be engaged in activities related to hazardous waste removal, containment, or emergency response under this chapter; and 1
(B) any person who is retained or hired by a person described in subparagraph (A) to provide any services relating to a response action; and
(C) any surety who after October 16, 1990, provides a bid, performance or payment bond to a response action contractor, and begins activities to meet its obligations under such bond, but only in connection with such activities or obligations.
(3) Insurance
The term "insurance" means liability insurance which is fair and reasonably priced, as determined by the President, and which is made available at the time the contractor enters into the response action contract to provide response action.
(f) Competition
Response action contractors and subcontractors for program management, construction management, architectural and engineering, surveying and mapping, and related services shall be selected in accordance with title IX of the Federal Property and Administrative Services Act of 1949.3 The Federal selection procedures shall apply to appropriate contracts negotiated by all Federal governmental agencies involved in carrying out this chapter. Such procedures shall be followed by response action contractors and subcontractors.
(g) Surety bonds
(1) If under
(2) If under applicable Federal law surety bonds are required for any direct Federal procurement of any response action contract, no right of action shall accrue on the performance bond issued on such response action contract to or for the use of any person other than the obligee named in the bond.
(3) If under applicable Federal law surety bonds are required for any direct Federal procurement of any response action contract, unless otherwise provided for by the procuring agency in the bond, in the event of a default, the surety's liability on a performance bond shall be only for the cost of completion of the contract work in accordance with the plans and specifications less the balance of funds remaining to be paid under the contract, up to the penal sum of the bond. The surety shall in no event be liable on bonds to indemnify or compensate the obligee for loss or liability arising from personal injury or property damage whether or not caused by a breach of the bonded contract.
(4) Nothing in this subsection shall be construed as preempting, limiting, superseding, affecting, applying to, or modifying any State laws, regulations, requirements, rules, practices or procedures. Nothing in this subsection shall be construed as affecting, applying to, modifying, limiting, superseding, or preempting any rights, authorities, liabilities, demands, actions, causes of action, losses, judgments, claims, statutes of limitation, or obligations under Federal or State law, which do not arise on or under the bond.
(5) This subsection shall not apply to bonds executed before October 17, 1990.
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (b)(1), (e)(1), (2)(A)(iii), and (f), was in the original "this Act", meaning
The Solid Waste Disposal Act, referred to in subsec. (c)(5)(D), is title II of
The Federal Property and Administrative Services Act of 1949, referred to in subsec. (f), is act June 30, 1949, ch. 288,
Codification
In subsec. (c)(3), "section 6301(a) and (b) of title 41" substituted for "section 3732 of the Revised Statutes (
In subsec. (g)(1), "
Amendments
1998—Subsec. (e)(2)(C).
Subsec. (g)(5).
1992—Subsec. (e)(2)(C).
Subsec. (g)(1).
Subsec. (g)(5).
1990—Subsec. (e)(2)(C).
Subsec. (g).
1987—Subsec. (e)(2)(A)(iii).
1986—Subsec. (c)(3).
Statutory Notes and Related Subsidiaries
Coordination of Titles I to IV of Pub. L. 99–499
Any provision of titles I to IV of
1 So in original. The word "and" probably should not appear.
2 So in original. Probably should not be capitalized.
3 See References in Text note below.
§9620. Federal facilities
(a) Application of chapter to Federal Government
(1) In general
Each department, agency, and instrumentality of the United States (including the executive, legislative, and judicial branches of government) shall be subject to, and comply with, this chapter in the same manner and to the same extent, both procedurally and substantively, as any nongovernmental entity, including liability under
(2) Application of requirements to Federal facilities
All guidelines, rules, regulations, and criteria which are applicable to preliminary assessments carried out under this chapter for facilities at which hazardous substances are located, applicable to evaluations of such facilities under the National Contingency Plan, applicable to inclusion on the National Priorities List, or applicable to remedial actions at such facilities shall also be applicable to facilities which are owned or operated by a department, agency, or instrumentality of the United States in the same manner and to the extent as such guidelines, rules, regulations, and criteria are applicable to other facilities. No department, agency, or instrumentality of the United States may adopt or utilize any such guidelines, rules, regulations, or criteria which are inconsistent with the guidelines, rules, regulations, and criteria established by the Administrator under this chapter.
(3) Exceptions
This subsection shall not apply to the extent otherwise provided in this section with respect to applicable time periods. This subsection shall also not apply to any requirements relating to bonding, insurance, or financial responsibility. Nothing in this chapter shall be construed to require a State to comply with
(4) State laws
State laws concerning removal and remedial action, including State laws regarding enforcement, shall apply to removal and remedial action at facilities owned or operated by a department, agency, or instrumentality of the United States or facilities that are the subject of a deferral under subsection (h)(3)(C) when such facilities are not included on the National Priorities List. The preceding sentence shall not apply to the extent a State law would apply any standard or requirement to such facilities which is more stringent than the standards and requirements applicable to facilities which are not owned or operated by any such department, agency, or instrumentality.
(b) Notice
Each department, agency, and instrumentality of the United States shall add to the inventory of Federal agency hazardous waste facilities required to be submitted under section 3016 of the Solid Waste Disposal Act [
(c) Federal Agency Hazardous Waste Compliance Docket
The Administrator shall establish a special Federal Agency Hazardous Waste Compliance Docket (hereinafter in this section referred to as the "docket") which shall contain each of the following:
(1) All information submitted under section 3016 of the Solid Waste Disposal Act [
(2) Information submitted by each department, agency, or instrumentality of the United States under section 3005 or 3010 of such Act [
(3) Information submitted by the department, agency, or instrumentality under
The docket shall be available for public inspection at reasonable times. Six months after establishment of the docket and every 6 months thereafter, the Administrator shall publish in the Federal Register a list of the Federal facilities which have been included in the docket during the immediately preceding 6-month period. Such publication shall also indicate where in the appropriate regional office of the Environmental Protection Agency additional information may be obtained with respect to any facility on the docket. The Administrator shall establish a program to provide information to the public with respect to facilities which are included in the docket under this subsection.
(d) Assessment and evaluation
(1) In general
The Administrator shall take steps to assure that a preliminary assessment is conducted for each facility on the docket. Following such preliminary assessment, the Administrator shall, where appropriate—
(A) evaluate such facilities in accordance with the criteria established in accordance with
(B) include such facilities on the National Priorities List maintained under such plan if the facility meets such criteria.
(2) Application of criteria
(A) In general
Subject to subparagraph (B), the criteria referred to in paragraph (1) shall be applied in the same manner as the criteria are applied to facilities that are owned or operated by persons other than the United States.
(B) Response under other law
It shall be an appropriate factor to be taken into consideration for the purposes of
(3) Completion
Evaluation and listing under this subsection shall be completed in accordance with a reasonable schedule established by the Administrator.
(e) Required action by department
(1) RI/FS
Not later than 6 months after the inclusion of any facility on the National Priorities List, the department, agency, or instrumentality which owns or operates such facility shall, in consultation with the Administrator and appropriate State authorities, commence a remedial investigation and feasibility study for such facility. In the case of any facility which is listed on such list before October 17, 1986, the department, agency, or instrumentality which owns or operates such facility shall, in consultation with the Administrator and appropriate State authorities, commence such an investigation and study for such facility within one year after October 17, 1986. The Administrator and appropriate State authorities shall publish a timetable and deadlines for expeditious completion of such investigation and study.
(2) Commencement of remedial action; interagency agreement
The Administrator shall review the results of each investigation and study conducted as provided in paragraph (1). Within 180 days thereafter, the head of the department, agency, or instrumentality concerned shall enter into an interagency agreement with the Administrator for the expeditious completion by such department, agency, or instrumentality of all necessary remedial action at such facility. Substantial continuous physical onsite remedial action shall be commenced at each facility not later than 15 months after completion of the investigation and study. All such interagency agreements, including review of alternative remedial action plans and selection of remedial action, shall comply with the public participation requirements of
(3) Completion of remedial actions
Remedial actions at facilities subject to interagency agreements under this section shall be completed as expeditiously as practicable. Each agency shall include in its annual budget submissions to the Congress a review of alternative agency funding which could be used to provide for the costs of remedial action. The budget submission shall also include a statement of the hazard posed by the facility to human health, welfare, and the environment and identify the specific consequences of failure to begin and complete remedial action.
(4) Contents of agreement
Each interagency agreement under this subsection shall include, but shall not be limited to, each of the following:
(A) A review of alternative remedial actions and selection of a remedial action by the head of the relevant department, agency, or instrumentality and the Administrator or, if unable to reach agreement on selection of a remedial action, selection by the Administrator.
(B) A schedule for the completion of each such remedial action.
(C) Arrangements for long-term operation and maintenance of the facility.
(5) Annual report
Each department, agency, or instrumentality responsible for compliance with this section shall furnish an annual report to the Congress concerning its progress in implementing the requirements of this section. Such reports shall include, but shall not be limited to, each of the following items:
(A) A report on the progress in reaching interagency agreements under this section.
(B) The specific cost estimates and budgetary proposals involved in each interagency agreement.
(C) A brief summary of the public comments regarding each proposed interagency agreement.
(D) A description of the instances in which no agreement was reached.
(E) A report on progress in conducting investigations and studies under paragraph (1).
(F) A report on progress in conducting remedial actions.
(G) A report on progress in conducting remedial action at facilities which are not listed on the National Priorities List.
With respect to instances in which no agreement was reached within the required time period, the department, agency, or instrumentality filing the report under this paragraph shall include in such report an explanation of the reasons why no agreement was reached. The annual report required by this paragraph shall also contain a detailed description on a State-by-State basis of the status of each facility subject to this section, including a description of the hazard presented by each facility, plans and schedules for initiating and completing response action, enforcement status (where appropriate), and an explanation of any postponements or failure to complete response action. Such reports shall also be submitted to the affected States.
(6) Settlements with other parties
If the Administrator, in consultation with the head of the relevant department, agency, or instrumentality of the United States, determines that remedial investigations and feasibility studies or remedial action will be done properly at the Federal facility by another potentially responsible party within the deadlines provided in paragraphs (1), (2), and (3) of this subsection, the Administrator may enter into an agreement with such party under
(f) State and local participation
The Administrator and each department, agency, or instrumentality responsible for compliance with this section shall afford to relevant State and local officials the opportunity to participate in the planning and selection of the remedial action, including but not limited to the review of all applicable data as it becomes available and the development of studies, reports, and action plans. In the case of State officials, the opportunity to participate shall be provided in accordance with
(g) Transfer of authorities
Except for authorities which are delegated by the Administrator to an officer or employee of the Environmental Protection Agency, no authority vested in the Administrator under this section may be transferred, by executive order of the President or otherwise, to any other officer or employee of the United States or to any other person.
(h) Property transferred by Federal agencies
(1) Notice
After the last day of the 6-month period beginning on the effective date of regulations under paragraph (2) of this subsection, whenever any department, agency, or instrumentality of the United States enters into any contract for the sale or other transfer of real property which is owned by the United States and on which any hazardous substance was stored for one year or more, known to have been released, or disposed of, the head of such department, agency, or instrumentality shall include in such contract notice of the type and quantity of such hazardous substance and notice of the time at which such storage, release, or disposal took place, to the extent such information is available on the basis of a complete search of agency files.
(2) Form of notice; regulations
Notice under this subsection shall be provided in such form and manner as may be provided in regulations promulgated by the Administrator. As promptly as practicable after October 17, 1986, but not later than 18 months after October 17, 1986, and after consultation with the Administrator of the General Services Administration, the Administrator shall promulgate regulations regarding the notice required to be provided under this subsection.
(3) Contents of certain deeds
(A) In general
After the last day of the 6-month period beginning on the effective date of regulations under paragraph (2) of this subsection, in the case of any real property owned by the United States on which any hazardous substance was stored for one year or more, known to have been released, or disposed of, each deed entered into for the transfer of such property by the United States to any other person or entity shall contain—
(i) to the extent such information is available on the basis of a complete search of agency files—
(I) a notice of the type and quantity of such hazardous substances,
(II) notice of the time at which such storage, release, or disposal took place, and
(III) a description of the remedial action taken, if any;
(ii) a covenant warranting that—
(I) all remedial action necessary to protect human health and the environment with respect to any such substance remaining on the property has been taken before the date of such transfer, and
(II) any additional remedial action found to be necessary after the date of such transfer shall be conducted by the United States; and
(iii) a clause granting the United States access to the property in any case in which remedial action or corrective action is found to be necessary after the date of such transfer.
(B) Covenant requirements
For purposes of subparagraphs (A)(ii)(I) and (C)(iii), all remedial action described in such subparagraph has been taken if the construction and installation of an approved remedial design has been completed, and the remedy has been demonstrated to the Administrator to be operating properly and successfully. The carrying out of long-term pumping and treating, or operation and maintenance, after the remedy has been demonstrated to the Administrator to be operating properly and successfully does not preclude the transfer of the property. The requirements of subparagraph (A)(ii) shall not apply in any case in which the person or entity to whom the real property is transferred is a potentially responsible party with respect to such property. The requirements of subparagraph (A)(ii) shall not apply in any case in which the transfer of the property occurs or has occurred by means of a lease, without regard to whether the lessee has agreed to purchase the property or whether the duration of the lease is longer than 55 years. In the case of a lease entered into after September 30, 1995, with respect to real property located at an installation approved for closure or realignment under a base closure law, the agency leasing the property, in consultation with the Administrator, shall determine before leasing the property that the property is suitable for lease, that the uses contemplated for the lease are consistent with protection of human health and the environment, and that there are adequate assurances that the United States will take all remedial action referred to in subparagraph (A)(ii) that has not been taken on the date of the lease.
(C) Deferral
(i) In general
The Administrator, with the concurrence of the Governor of the State in which the facility is located (in the case of real property at a Federal facility that is listed on the National Priorities List), or the Governor of the State in which the facility is located (in the case of real property at a Federal facility not listed on the National Priorities List) may defer the requirement of subparagraph (A)(ii)(I) with respect to the property if the Administrator or the Governor, as the case may be, determines that the property is suitable for transfer, based on a finding that—
(I) the property is suitable for transfer for the use intended by the transferee, and the intended use is consistent with protection of human health and the environment;
(II) the deed or other agreement proposed to govern the transfer between the United States and the transferee of the property contains the assurances set forth in clause (ii);
(III) the Federal agency requesting deferral has provided notice, by publication in a newspaper of general circulation in the vicinity of the property, of the proposed transfer and of the opportunity for the public to submit, within a period of not less than 30 days after the date of the notice, written comments on the suitability of the property for transfer; and
(IV) the deferral and the transfer of the property will not substantially delay any necessary response action at the property.
(ii) Response action assurances
With regard to a release or threatened release of a hazardous substance for which a Federal agency is potentially responsible under this section, the deed or other agreement proposed to govern the transfer shall contain assurances that—
(I) provide for any necessary restrictions on the use of the property to ensure the protection of human health and the environment;
(II) provide that there will be restrictions on use necessary to ensure that required remedial investigations, response action, and oversight activities will not be disrupted;
(III) provide that all necessary response action will be taken and identify the schedules for investigation and completion of all necessary response action as approved by the appropriate regulatory agency; and
(IV) provide that the Federal agency responsible for the property subject to transfer will submit a budget request to the Director of the Office of Management and Budget that adequately addresses schedules for investigation and completion of all necessary response action, subject to congressional authorizations and appropriations.
(iii) Warranty
When all response action necessary to protect human health and the environment with respect to any substance remaining on the property on the date of transfer has been taken, the United States shall execute and deliver to the transferee an appropriate document containing a warranty that all such response action has been taken, and the making of the warranty shall be considered to satisfy the requirement of subparagraph (A)(ii)(I).
(iv) Federal responsibility
A deferral under this subparagraph shall not increase, diminish, or affect in any manner any rights or obligations of a Federal agency (including any rights or obligations under this section and
(4) Identification of uncontaminated property
(A) In the case of real property to which this paragraph applies (as set forth in subparagraph (E)), the head of the department, agency, or instrumentality of the United States with jurisdiction over the property shall identify the real property on which no hazardous substances and no petroleum products or their derivatives were known to have been released or disposed of. Such identification shall be based on an investigation of the real property to determine or discover the obviousness of the presence or likely presence of a release or threatened release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel and motor oil, on the real property. The identification shall consist, at a minimum, of a review of each of the following sources of information concerning the current and previous uses of the real property:
(i) A detailed search of Federal Government records pertaining to the property.
(ii) Recorded chain of title documents regarding the real property.
(iii) Aerial photographs that may reflect prior uses of the real property and that are reasonably obtainable through State or local government agencies.
(iv) A visual inspection of the real property and any buildings, structures, equipment, pipe, pipeline, or other improvements on the real property, and a visual inspection of properties immediately adjacent to the real property.
(v) A physical inspection of property adjacent to the real property, to the extent permitted by owners or operators of such property.
(vi) Reasonably obtainable Federal, State, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release or threatened release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel and motor oil, on the real property.
(vii) Interviews with current or former employees involved in operations on the real property.
Such identification shall also be based on sampling, if appropriate under the circumstances. The results of the identification shall be provided immediately to the Administrator and State and local government officials and made available to the public.
(B) The identification required under subparagraph (A) is not complete until concurrence in the results of the identification is obtained, in the case of real property that is part of a facility on the National Priorities List, from the Administrator, or, in the case of real property that is not part of a facility on the National Priorities List, from the appropriate State official. In the case of a concurrence which is required from a State official, the concurrence is deemed to be obtained if, within 90 days after receiving a request for the concurrence, the State official has not acted (by either concurring or declining to concur) on the request for concurrence.
(C)(i) Except as provided in clauses (ii), (iii), and (iv), the identification and concurrence required under subparagraphs (A) and (B), respectively, shall be made at least 6 months before the termination of operations on the real property.
(ii) In the case of real property described in subparagraph (E)(i)(II) on which operations have been closed or realigned or scheduled for closure or realignment pursuant to a base closure law described in subparagraph (E)(ii)(I) or (E)(ii)(II) by October 19, 1992, the identification and concurrence required under subparagraphs (A) and (B), respectively, shall be made not later than 18 months after October 19, 1992.
(iii) In the case of real property described in subparagraph (E)(i)(II) on which operations are closed or realigned or become scheduled for closure or realignment pursuant to the base closure law described in subparagraph (E)(ii)(II) after October 19, 1992, the identification and concurrence required under subparagraphs (A) and (B), respectively, shall be made not later than 18 months after the date by which a joint resolution disapproving the closure or realignment of the real property under section 2904(b) of such base closure law must be enacted, and such a joint resolution has not been enacted.
(iv) In the case of real property described in subparagraphs (E)(i)(II) on which operations are closed or realigned pursuant to a base closure law described in subparagraph (E)(ii)(III) or (E)(ii)(IV), the identification and concurrence required under subparagraphs (A) and (B), respectively, shall be made not later than 18 months after the date on which the real property is selected for closure or realignment pursuant to such a base closure law.
(D) In the case of the sale or other transfer of any parcel of real property identified under subparagraph (A), the deed entered into for the sale or transfer of such property by the United States to any other person or entity shall contain—
(i) a covenant warranting that any response action or corrective action found to be necessary after the date of such sale or transfer shall be conducted by the United States; and
(ii) a clause granting the United States access to the property in any case in which a response action or corrective action is found to be necessary after such date at such property, or such access is necessary to carry out a response action or corrective action on adjoining property.
(E)(i) This paragraph applies to—
(I) real property owned by the United States and on which the United States plans to terminate Federal Government operations, other than real property described in subclause (II); and
(II) real property that is or has been used as a military installation and on which the United States plans to close or realign military operations pursuant to a base closure law.
(ii) For purposes of this paragraph, the term "base closure law" includes the following:
(I) Title II of the Defense Authorization Amendments and Base Closure and Realignment Act (
(II) The Defense Base Closure and Realignment Act of 1990 (part A of title XXIX of
(III)
(IV) Any provision of law authorizing the closure or realignment of a military installation enacted on or after October 19, 1992.
(F) Nothing in this paragraph shall affect, preclude, or otherwise impair the termination of Federal Government operations on real property owned by the United States.
(5) Notification of States regarding certain leases
In the case of real property owned by the United States, on which any hazardous substance or any petroleum product or its derivatives (including aviation fuel and motor oil) was stored for one year or more, known to have been released, or disposed of, and on which the United States plans to terminate Federal Government operations, the head of the department, agency, or instrumentality of the United States with jurisdiction over the property shall notify the State in which the property is located of any lease entered into by the United States that will encumber the property beyond the date of termination of operations on the property. Such notification shall be made before entering into the lease and shall include the length of the lease, the name of person to whom the property is leased, and a description of the uses that will be allowed under the lease of the property and buildings and other structures on the property.
(i) Obligations under Solid Waste Disposal Act
Nothing in this section shall affect or impair the obligation of any department, agency, or instrumentality of the United States to comply with any requirement of the Solid Waste Disposal Act [
(j) National security
(1) Site specific Presidential orders
The President may issue such orders regarding response actions at any specified site or facility of the Department of Energy or the Department of Defense as may be necessary to protect the national security interests of the United States at that site or facility. Such orders may include, where necessary to protect such interests, an exemption from any requirement contained in this subchapter or under title III of the Superfund Amendments and Reauthorization Act of 1986 [
(2) Classified information
Notwithstanding any other provision of law, all requirements of the Atomic Energy Act [
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (a)(1) to (3), (c)(1), (d)(2)(B), and (j)(2), was in the original "this Act", meaning
Section 2904(b) of such base closure law, referred to in subsec. (h)(4)(C)(iii), means section 2904(b) of
The Solid Waste Disposal Act, referred to in subsec. (i), is title II of
Title III of the Superfund Amendments and Reauthorization Act of 1986, referred to in subsec. (j), is title III of
The Atomic Energy Act, referred to in subsec. (j)(2), probably means the Atomic Energy Act of 1954, act Aug. 1, 1946, ch. 724, as added by act Aug. 30, 1954, ch. 1073, §1,
Amendments
1996—Subsec. (a)(4).
Subsec. (d).
Subsec. (h)(3).
Subsec. (h)(4)(A).
1992—Subsec. (h)(3).
Subsec. (h)(3)(C).
Subsec. (h)(4).
Subsec. (h)(5).
Statutory Notes and Related Subsidiaries
Termination of Reporting Requirements
For termination, effective May 15, 2000, of provisions of law requiring submittal to Congress of any annual, semiannual, or other regular periodic report listed in House Document No. 103–7 (in which a report required under subsec. (e)(5) of this section is listed as the 5th item on page 151), see section 3003 of
Environmental Compliance Not Affected by Pub. L. 114–120
Identification of Uncontaminated Property at Installations To Be Closed
"(1) the date that is 9 months after the date of the submittal, if any, to the transition coordinator for the installation concerned of a specific use proposed for all or a portion of the real property of the installation; or
"(2) the date specified in section 120(h)(4)(C)(iii) of such Act."
Congressional Findings
"(1) The closure of certain Federal facilities is having adverse effects on the economies of local communities by eliminating jobs associated with such facilities, and delay in remediation of environmental contamination of real property at such facilities is preventing transfer and private development of such property.
"(2) Each department, agency, or instrumentality of the United States, in cooperation with local communities, should expeditiously identify real property that offers the greatest opportunity for reuse and redevelopment on each facility under the jurisdiction of the department, agency, or instrumentality where operations are terminating.
"(3) Remedial actions, including remedial investigations and feasibility studies, and corrective actions at such Federal facilities should be expedited in a manner to facilitate environmental protection and the sale or transfer of such excess real property for the purpose of mitigating adverse economic effects on the surrounding community.
"(4) Each department, agency, or instrumentality of the United States, in accordance with applicable law, should make available without delay such excess real property.
"(5) In the case of any real property owned by the United States and transferred to another person, the United States Government should remain responsible for conducting any remedial action or corrective action necessary to protect human health and the environment with respect to any hazardous substance or petroleum product or its derivatives, including aviation fuel and motor oil, that was present on such real property at the time of transfer."
Applicability
"(1) owned or operated by the United States and subject to the jurisdiction of such Department;
"(2) located in St. Charles and St. Louis counties, Missouri, or the city of St. Louis, Missouri, and
"(3) published in the National Priorities List.
In preparing such plans, the Secretary of Energy shall consult with the Administrator of the Environmental Protection Agency."
§9621. Cleanup standards
(a) Selection of remedial action
The President shall select appropriate remedial actions determined to be necessary to be carried out under
(b) General rules
(1) Remedial actions in which treatment which permanently and significantly reduces the volume, toxicity or mobility of the hazardous substances, pollutants, and contaminants is a principal element, are to be preferred over remedial actions not involving such treatment. The offsite transport and disposal of hazardous substances or contaminated materials without such treatment should be the least favored alternative remedial action where practicable treatment technologies are available. The President shall conduct an assessment of permanent solutions and alternative treatment technologies or resource recovery technologies that, in whole or in part, will result in a permanent and significant decrease in the toxicity, mobility, or volume of the hazardous substance, pollutant, or contaminant. In making such assessment, the President shall specifically address the long-term effectiveness of various alternatives. In assessing alternative remedial actions, the President shall, at a minimum, take into account:
(A) the long-term uncertainties associated with land disposal;
(B) the goals, objectives, and requirements of the Solid Waste Disposal Act [
(C) the persistence, toxicity, mobility, and propensity to bioaccumulate of such hazardous substances and their constituents;
(D) short- and long-term potential for adverse health effects from human exposure;
(E) long-term maintenance costs;
(F) the potential for future remedial action costs if the alternative remedial action in question were to fail; and
(G) the potential threat to human health and the environment associated with excavation, transportation, and redisposal, or containment.
The President shall select a remedial action that is protective of human health and the environment, that is cost effective, and that utilizes permanent solutions and alternative treatment technologies or resource recovery technologies to the maximum extent practicable. If the President selects a remedial action not appropriate for a preference under this subsection, the President shall publish an explanation as to why a remedial action involving such reductions was not selected.
(2) The President may select an alternative remedial action meeting the objectives of this subsection whether or not such action has been achieved in practice at any other facility or site that has similar characteristics. In making such a selection, the President may take into account the degree of support for such remedial action by parties interested in such site.
(c) Review
If the President selects a remedial action that results in any hazardous substances, pollutants, or contaminants remaining at the site, the President shall review such remedial action no less often than each 5 years after the initiation of such remedial action to assure that human health and the environment are being protected by the remedial action being implemented. In addition, if upon such review it is the judgment of the President that action is appropriate at such site in accordance with
(d) Degree of cleanup
(1) Remedial actions selected under this section or otherwise required or agreed to by the President under this chapter shall attain a degree of cleanup of hazardous substances, pollutants, and contaminants released into the environment and of control of further release at a minimum which assures protection of human health and the environment. Such remedial actions shall be relevant and appropriate under the circumstances presented by the release or threatened release of such substance, pollutant, or contaminant.
(2)(A) With respect to any hazardous substance, pollutant or contaminant that will remain onsite, if—
(i) any standard, requirement, criteria, or limitation under any Federal environmental law, including, but not limited to, the Toxic Substances Control Act [
(ii) any promulgated standard, requirement, criteria, or limitation under a State environmental or facility siting law that is more stringent than any Federal standard, requirement, criteria, or limitation, including each such State standard, requirement, criteria, or limitation contained in a program approved, authorized or delegated by the Administrator under a statute cited in subparagraph (A), and that has been identified to the President by the State in a timely manner,
is legally applicable to the hazardous substance or pollutant or contaminant concerned or is relevant and appropriate under the circumstances of the release or threatened release of such hazardous substance or pollutant or contaminant, the remedial action selected under
(B)(i) In determining whether or not any water quality criteria under the Clean Water Act [
(ii) For the purposes of this section, a process for establishing alternate concentration limits to those otherwise applicable for hazardous constituents in groundwater under subparagraph (A) may not be used to establish applicable standards under this paragraph if the process assumes a point of human exposure beyond the boundary of the facility, as defined at the conclusion of the remedial investigation and feasibility study, except where—
(I) there are known and projected points of entry of such groundwater into surface water; and
(II) on the basis of measurements or projections, there is or will be no statistically significant increase of such constituents from such groundwater in such surface water at the point of entry or at any point where there is reason to believe accumulation of constituents may occur downstream; and
(III) the remedial action includes enforceable measures that will preclude human exposure to the contaminated groundwater at any point between the facility boundary and all known and projected points of entry of such groundwater into surface water
then the assumed point of human exposure may be at such known and projected points of entry.
(C)(i) Clause (ii) of this subparagraph shall be applicable only in cases where, due to the President's selection, in compliance with subsection (b)(1), of a proposed remedial action which does not permanently and significantly reduce the volume, toxicity, or mobility of hazardous substances, pollutants, or contaminants, the proposed disposition of waste generated by or associated with the remedial action selected by the President is land disposal in a State referred to in clause (ii).
(ii) Except as provided in clauses (iii) and (iv), a State standard, requirement, criteria, or limitation (including any State siting standard or requirement) which could effectively result in the statewide prohibition of land disposal of hazardous substances, pollutants, or contaminants shall not apply.
(iii) Any State standard, requirement, criteria, or limitation referred to in clause (ii) shall apply where each of the following conditions is met:
(I) The State standard, requirement, criteria, or limitation is of general applicability and was adopted by formal means.
(II) The State standard, requirement, criteria, or limitation was adopted on the basis of hydrologic, geologic, or other relevant considerations and was not adopted for the purpose of precluding onsite remedial actions or other land disposal for reasons unrelated to protection of human health and the environment.
(III) The State arranges for, and assures payment of the incremental costs of utilizing, a facility for disposition of the hazardous substances, pollutants, or contaminants concerned.
(iv) Where the remedial action selected by the President does not conform to a State standard and the State has initiated a law suit against the Environmental Protection Agency prior to May 1, 1986, to seek to have the remedial action conform to such standard, the President shall conform the remedial action to the State standard. The State shall assure the availability of an offsite facility for such remedial action.
(3) In the case of any removal or remedial action involving the transfer of any hazardous substance or pollutant or contaminant offsite, such hazardous substance or pollutant or contaminant shall only be transferred to a facility which is operating in compliance with section 3004 and 3005 of the Solid Waste Disposal Act [
(A) The unit to which the hazardous substance or pollutant or contaminant is transferred is not releasing any hazardous waste, or constituent thereof, into the groundwater or surface water or soil.
(B) All such releases from other units at the facility are being controlled by a corrective action program approved by the Administrator under subtitle C of the Solid Waste Disposal Act [
The President shall notify the owner or operator of such facility of determinations under this paragraph.
(4) The President may select a remedial action meeting the requirements of paragraph (1) that does not attain a level or standard of control at least equivalent to a legally applicable or relevant and appropriate standard, requirement, criteria, or limitation as required by paragraph (2) (including subparagraph (B) thereof), if the President finds that—
(A) the remedial action selected is only part of a total remedial action that will attain such level or standard of control when completed;
(B) compliance with such requirement at that facility will result in greater risk to human health and the environment than alternative options;
(C) compliance with such requirements is technically impracticable from an engineering perspective;
(D) the remedial action selected will attain a standard of performance that is equivalent to that required under the otherwise applicable standard, requirement, criteria, or limitation, through use of another method or approach;
(E) with respect to a State standard, requirement, criteria, or limitation, the State has not consistently applied (or demonstrated the intention to consistently apply) the standard, requirement, criteria, or limitation in similar circumstances at other remedial actions within the State; or
(F) in the case of a remedial action to be undertaken solely under
The President shall publish such findings, together with an explanation and appropriate documentation.
(e) Permits and enforcement
(1) No Federal, State, or local permit shall be required for the portion of any removal or remedial action conducted entirely onsite, where such remedial action is selected and carried out in compliance with this section.
(2) A State may enforce any Federal or State standard, requirement, criteria, or limitation to which the remedial action is required to conform under this chapter in the United States district court for the district in which the facility is located. Any consent decree shall require the parties to attempt expeditiously to resolve disagreements concerning implementation of the remedial action informally with the appropriate Federal and State agencies. Where the parties agree, the consent decree may provide for administrative enforcement. Each consent decree shall also contain stipulated penalties for violations of the decree in an amount not to exceed $25,000 per day, which may be enforced by either the President or the State. Such stipulated penalties shall not be construed to impair or affect the authority of the court to order compliance with the specific terms of any such decree.
(f) State involvement
(1) The President shall promulgate regulations providing for substantial and meaningful involvement by each State in initiation, development, and selection of remedial actions to be undertaken in that State. The regulations, at a minimum, shall include each of the following:
(A) State involvement in decisions whether to perform a preliminary assessment and site inspection.
(B) Allocation of responsibility for hazard ranking system scoring.
(C) State concurrence in deleting sites from the National Priorities List.
(D) State participation in the long-term planning process for all remedial sites within the State.
(E) A reasonable opportunity for States to review and comment on each of the following:
(i) The remedial investigation and feasibility study and all data and technical documents leading to its issuance.
(ii) The planned remedial action identified in the remedial investigation and feasibility study.
(iii) The engineering design following selection of the final remedial action.
(iv) Other technical data and reports relating to implementation of the remedy.
(v) Any proposed finding or decision by the President to exercise the authority of subsection (d)(4).
(F) Notice to the State of negotiations with potentially responsible parties regarding the scope of any response action at a facility in the State and an opportunity to participate in such negotiations and, subject to paragraph (2), be a party to any settlement.
(G) Notice to the State and an opportunity to comment on the President's proposed plan for remedial action as well as on alternative plans under consideration. The President's proposed decision regarding the selection of remedial action shall be accompanied by a response to the comments submitted by the State, including an explanation regarding any decision under subsection (d)(4) on compliance with promulgated State standards. A copy of such response shall also be provided to the State.
(H) Prompt notice and explanation of each proposed action to the State in which the facility is located.
Prior to the promulgation of such regulations, the President shall provide notice to the State of negotiations with potentially responsible parties regarding the scope of any response action at a facility in the State, and such State may participate in such negotiations and, subject to paragraph (2), any settlements.
(2)(A) This paragraph shall apply to remedial actions secured under
(B) If the State does not concur in such selection, and the State desires to have the remedial action conform to such standard, requirement, criteria, or limitation, the State shall intervene in the action under
(C) The President may conclude settlement negotiations with potentially responsible parties without State concurrence.
(3)(A) This paragraph shall apply to remedial actions at facilities owned or operated by a department, agency, or instrumentality of the United States. At least 30 days prior to the publication of the President's final remedial action plan, if the President proposes to select a remedial action that does not attain a legally applicable or relevant and appropriate standard, requirement, criteria, or limitation, under the authority of subsection (d)(4), the President shall provide an opportunity for the State to concur or not concur in such selection. If the State concurs, or does not act within 30 days, the remedial action may proceed.
(B) If the State does not concur in such selection as provided in subparagraph (A), and desires to have the remedial action conform to such standard, requirement, criteria, or limitation, the State may maintain an action as follows:
(i) If the President has notified the State of selection of such a remedial action, the State may bring an action within 30 days of such notification for the sole purpose of determining whether the finding of the President is supported by substantial evidence. Such action shall be brought in the United States district court for the district in which the facility is located.
(ii) If the State establishes, on the administrative record, that the President's finding is not supported by substantial evidence, the remedial action shall be modified to conform to such standard, requirement, criteria, or limitation.
(iii) If the State fails to establish that the President's finding was not supported by substantial evidence and if the State pays, within 60 days of judgment, the additional costs attributable to meeting such standard, requirement, criteria, or limitation, the remedial action shall be selected to meet such standard, requirement, criteria, or limitation. If the State fails to pay within 60 days, the remedial action selected by the President shall proceed through completion.
(C) Nothing in this section precludes, and the court shall not enjoin, the Federal agency from taking any remedial action unrelated to or not inconsistent with such standard, requirement, criteria, or limitation.
(
Editorial Notes
References in Text
The Solid Waste Disposal Act, referred to in subsecs. (b)(1)(B) and (d)(2)(A)(i), (3)(B), is title II of
This chapter, referred to in subsecs. (d)(1) and (e)(2), was in the original "this Act", meaning
The Toxic Substances Control Act, referred to in subsec. (d)(2)(A)(i), (3), is
The Safe Drinking Water Act, referred to in subsec. (d)(2)(A), is title XIV of act July 1, 1944, as added Dec. 16, 1974,
The Clean Air Act, referred to in subsec. (d)(2)(A)(i), is act July 14, 1955, ch. 360,
The Clean Water Act, referred to in subsec. (d)(2)(A)(i), (B)(i), is act June 30, 1948, ch. 758, as amended generally by
The Marine Protection, Research and Sanctuaries Act, referred to in subsec. (d)(2)(A)(i), probably means the Marine Protection, Research and Sanctuaries Act of 1972,
Statutory Notes and Related Subsidiaries
Effective Date
"(1) The requirements of section 121 of CERCLA shall not apply to any remedial action for which the Record of Decision (hereinafter in this section referred to as the 'ROD') was signed, or the consent decree was lodged, before date of enactment [Oct. 17, 1986].
"(2) If the ROD was signed, or the consent decree lodged, within the 30-day period immediately following enactment of the Act [Oct. 17, 1986], the Administrator shall certify in writing that the portion of the remedial action covered by the ROD or consent decree complies to the maximum extent practicable with section 121 of CERCLA.
Any ROD signed before enactment of this Act [Oct. 17, 1986] and reopened after enactment of this Act to modify or supplement the selection of remedy shall be subject to the requirements of section 121 of CERCLA."
Termination of Reporting Requirements
For termination, effective May 15, 2000, of provisions of law requiring submittal to Congress of any annual, semiannual, or other regular periodic report listed in House Document No. 103–7 (in which the report under subsec. (c) of this section appears to be the report listed as the 15th item on page 20), see section 3003 of
§9622. Settlements
(a) Authority to enter into agreements
The President, in his discretion, may enter into an agreement with any person (including the owner or operator of the facility from which a release or substantial threat of release emanates, or any other potentially responsible person), to perform any response action (including any action described in
(b) Agreements with potentially responsible parties
(1) Mixed funding
An agreement under this section may provide that the President will reimburse the parties to the agreement from the Fund, with interest, for certain costs of actions under the agreement that the parties have agreed to perform but which the President has agreed to finance. In any case in which the President provides such reimbursement, the President shall make all reasonable efforts to recover the amount of such reimbursement under
(2) Reviewability
The President's decisions regarding the availability of fund financing under this subsection shall not be subject to judicial review under subsection (d).
(3) Retention of funds
If, as part of any agreement, the President will be carrying out any action and the parties will be paying amounts to the President, the President may, notwithstanding any other provision of law, retain and use such amounts for purposes of carrying out the agreement.
(4) Future obligation of Fund
In the case of a completed remedial action pursuant to an agreement described in paragraph (1), the Fund shall be subject to an obligation for subsequent remedial actions at the same facility but only to the extent that such subsequent actions are necessary by reason of the failure of the original remedial action. Such obligation shall be in a proportion equal to, but not exceeding, the proportion contributed by the Fund for the original remedial action. The Fund's obligation for such future remedial action may be met through Fund expenditures or through payment, following settlement or enforcement action, by parties who were not signatories to the original agreement.
(c) Effect of agreement
(1) Liability
Whenever the President has entered into an agreement under this section, the liability to the United States under this chapter of each party to the agreement, including any future liability to the United States, arising from the release or threatened release that is the subject of the agreement shall be limited as provided in the agreement pursuant to a covenant not to sue in accordance with subsection (f). A covenant not to sue may provide that future liability to the United States of a settling potentially responsible party under the agreement may be limited to the same proportion as that established in the original settlement agreement. Nothing in this section shall limit or otherwise affect the authority of any court to review in the consent decree process under subsection (d) any covenant not to sue contained in an agreement under this section. In determining the extent to which the liability of parties to an agreement shall be limited pursuant to a covenant not to sue, the President shall be guided by the principle that a more complete covenant not to sue shall be provided for a more permanent remedy undertaken by such parties.
(2) Actions against other persons
If an agreement has been entered into under this section, the President may take any action under
(A) The liability of any person under
(B) The authority of the President to maintain an action under this chapter against any person who is not a party to the agreement.
(d) Enforcement
(1) Cleanup agreements
(A) Consent decree
Whenever the President enters into an agreement under this section with any potentially responsible party with respect to remedial action under
(B) Effect
The entry of any consent decree under this subsection shall not be construed to be an acknowledgment by the parties that the release or threatened release concerned constitutes an imminent and substantial endangerment to the public health or welfare or the environment. Except as otherwise provided in the Federal Rules of Evidence, the participation by any party in the process under this section shall not be considered an admission of liability for any purpose, and the fact of such participation shall not be admissible in any judicial or administrative proceeding, including a subsequent proceeding under this section.
(C) Structure
The President may fashion a consent decree so that the entering of such decree and compliance with such decree or with any determination or agreement made pursuant to this section shall not be considered an admission of liability for any purpose.
(2) Public participation
(A) Filing of proposed judgment
At least 30 days before a final judgment is entered under paragraph (1), the proposed judgment shall be filed with the court.
(B) Opportunity for comment
The Attorney General shall provide an opportunity to persons who are not named as parties to the action to comment on the proposed judgment before its entry by the court as a final judgment. The Attorney General shall consider, and file with the court, any written comments, views, or allegations relating to the proposed judgment. The Attorney General may withdraw or withhold its consent to the proposed judgment if the comments, views, and allegations concerning the judgment disclose facts or considerations which indicate that the proposed judgment is inappropriate, improper, or inadequate.
(3) 9604(b) agreements
Whenever the President enters into an agreement under this section with any potentially responsible party with respect to action under
(e) Special notice procedures
(1) Notice
Whenever the President determines that a period of negotiation under this subsection would facilitate an agreement with potentially responsible parties for taking response action (including any action described in
(A) The names and addresses of potentially responsible parties (including owners and operators and other persons referred to in
(B) To the extent such information is available, the volume and nature of substances contributed by each potentially responsible party identified at the facility.
(C) A ranking by volume of the substances at the facility, to the extent such information is available.
The President shall make the information referred to in this paragraph available in advance of notice under this paragraph upon the request of a potentially responsible party in accordance with procedures provided by the President. The provisions of subsection (e) of
(2) Negotiation
(A) Moratorium
Except as provided in this subsection, the President may not commence action under
(B) Proposals
Persons receiving notice and information under paragraph (1) of this subsection with respect to action under
(C) Additional parties
If an additional potentially responsible party is identified during the negotiation period or after an agreement has been entered into under this subsection concerning a release or threatened release, the President may bring the additional party into the negotiation or enter into a separate agreement with such party.
(3) Preliminary allocation of responsibility
(A) In general
The President shall develop guidelines for preparing nonbinding preliminary allocations of responsibility. In developing these guidelines the President may include such factors as the President considers relevant, such as: volume, toxicity, mobility, strength of evidence, ability to pay, litigative risks, public interest considerations, precedential value, and inequities and aggravating factors. When it would expedite settlements under this section and remedial action, the President may, after completion of the remedial investigation and feasibility study, provide a nonbinding preliminary allocation of responsibility which allocates percentages of the total cost of response among potentially responsible parties at the facility.
(B) Collection of information
To collect information necessary or appropriate for performing the allocation under subparagraph (A) or for otherwise implementing this section, the President may by subpoena require the attendance and testimony of witnesses and the production of reports, papers, documents, answers to questions, and other information that the President deems necessary. Witnesses shall be paid the same fees and mileage that are paid witnesses in the courts of the United States. In the event of contumacy or failure or refusal of any person to obey any such subpoena, any district court of the United States in which venue is proper shall have jurisdiction to order any such person to comply with such subpoena. Any failure to obey such an order of the court is punishable by the court as a contempt thereof.
(C) Effect
The nonbinding preliminary allocation of responsibility shall not be admissible as evidence in any proceeding, and no court shall have jurisdiction to review the nonbinding preliminary allocation of responsibility. The nonbinding preliminary allocation of responsibility shall not constitute an apportionment or other statement on the divisibility of harm or causation.
(D) Costs
The costs incurred by the President in producing the nonbinding preliminary allocation of responsibility shall be reimbursed by the potentially responsible parties whose offer is accepted by the President. Where an offer under this section is not accepted, such costs shall be considered costs of response.
(E) Decision to reject offer
Where the President, in his discretion, has provided a nonbinding preliminary allocation of responsibility and the potentially responsible parties have made a substantial offer providing for response to the President which he rejects, the reasons for the rejection shall be provided in a written explanation. The President's decision to reject such an offer shall not be subject to judicial review.
(4) Failure to propose
If the President determines that a good faith proposal for undertaking or financing action under
(5) Significant threats
Nothing in this subsection shall limit the President's authority to undertake response or enforcement action regarding a significant threat to public health or the environment within the negotiation period established by this subsection.
(6) Inconsistent response action
When either the President, or a potentially responsible party pursuant to an administrative order or consent decree under this chapter, has initiated a remedial investigation and feasibility study for a particular facility under this chapter, no potentially responsible party may undertake any remedial action at the facility unless such remedial action has been authorized by the President.
(f) Covenant not to sue
(1) Discretionary covenants
The President may, in his discretion, provide any person with a covenant not to sue concerning any liability to the United States under this chapter, including future liability, resulting from a release or threatened release of a hazardous substance addressed by a remedial action, whether that action is onsite or offsite, if each of the following conditions is met:
(A) The covenant not to sue is in the public interest.
(B) The covenant not to sue would expedite response action consistent with the National Contingency Plan under
(C) The person is in full compliance with a consent decree under
(D) The response action has been approved by the President.
(2) Special covenants not to sue
In the case of any person to whom the President is authorized under paragraph (1) of this subsection to provide a covenant not to sue, for the portion of remedial action—
(A) which involves the transport and secure disposition offsite of hazardous substances in a facility meeting the requirements of sections 6924(c), (d), (e), (f), (g), (m), (o), (p), (u), and (v) and 6925(c) of this title, where the President has rejected a proposed remedial action that is consistent with the National Contingency Plan that does not include such offsite disposition and has thereafter required offsite disposition; or
(B) which involves the treatment of hazardous substances so as to destroy, eliminate, or permanently immobilize the hazardous constituents of such substances, such that, in the judgment of the President, the substances no longer present any current or currently foreseeable future significant risk to public health, welfare or the environment, no byproduct of the treatment or destruction process presents any significant hazard to public health, welfare or the environment, and all byproducts are themselves treated, destroyed, or contained in a manner which assures that such byproducts do not present any current or currently foreseeable future significant risk to public health, welfare or the environment,
the President shall provide such person with a covenant not to sue with respect to future liability to the United States under this chapter for a future release or threatened release of hazardous substances from such facility, and a person provided such covenant not to sue shall not be liable to the United States under
(3) Requirement that remedial action be completed
A covenant not to sue concerning future liability to the United States shall not take effect until the President certifies that remedial action has been completed in accordance with the requirements of this chapter at the facility that is the subject of such covenant.
(4) Factors
In assessing the appropriateness of a covenant not to sue under paragraph (1) and any condition to be included in a covenant not to sue under paragraph (1) or (2), the President shall consider whether the covenant or condition is in the public interest on the basis of such factors as the following:
(A) The effectiveness and reliability of the remedy, in light of the other alternative remedies considered for the facility concerned.
(B) The nature of the risks remaining at the facility.
(C) The extent to which performance standards are included in the order or decree.
(D) The extent to which the response action provides a complete remedy for the facility, including a reduction in the hazardous nature of the substances at the facility.
(E) The extent to which the technology used in the response action is demonstrated to be effective.
(F) Whether the Fund or other sources of funding would be available for any additional remedial actions that might eventually be necessary at the facility.
(G) Whether the remedial action will be carried out, in whole or in significant part, by the responsible parties themselves.
(5) Satisfactory performance
Any covenant not to sue under this subsection shall be subject to the satisfactory performance by such party of its obligations under the agreement concerned.
(6) Additional condition for future liability
(A) Except for the portion of the remedial action which is subject to a covenant not to sue under paragraph (2) or under subsection (g) (relating to de minimis settlements), a covenant not to sue a person concerning future liability to the United States shall include an exception to the covenant that allows the President to sue such person concerning future liability resulting from the release or threatened release that is the subject of the covenant where such liability arises out of conditions which are unknown at the time the President certifies under paragraph (3) that remedial action has been completed at the facility concerned.
(B) In extraordinary circumstances, the President may determine, after assessment of relevant factors such as those referred to in paragraph (4) and volume, toxicity, mobility, strength of evidence, ability to pay, litigative risks, public interest considerations, precedential value, and inequities and aggravating factors, not to include the exception referred to in subparagraph (A) if other terms, conditions, or requirements of the agreement containing the covenant not to sue are sufficient to provide all reasonable assurances that public health and the environment will be protected from any future releases at or from the facility.
(C) The President is authorized to include any provisions allowing future enforcement action under
(g) De minimis settlements
(1) Expedited final settlement
Whenever practicable and in the public interest, as determined by the President, the President shall as promptly as possible reach a final settlement with a potentially responsible party in an administrative or civil action under
(A) Both of the following are minimal in comparison to other hazardous substances at the facility:
(i) The amount of the hazardous substances contributed by that party to the facility.
(ii) The toxic or other hazardous effects of the substances contributed by that party to the facility.
(B) The potentially responsible party—
(i) is the owner of the real property on or in which the facility is located;
(ii) did not conduct or permit the generation, transportation, storage, treatment, or disposal of any hazardous substance at the facility; and
(iii) did not contribute to the release or threat of release of a hazardous substance at the facility through any action or omission.
This subparagraph (B) does not apply if the potentially responsible party purchased the real property with actual or constructive knowledge that the property was used for the generation, transportation, storage, treatment, or disposal of any hazardous substance.
(2) Covenant not to sue
The President may provide a covenant not to sue with respect to the facility concerned to any party who has entered into a settlement under this subsection unless such a covenant would be inconsistent with the public interest as determined under subsection (f).
(3) Expedited agreement
The President shall reach any such settlement or grant any such covenant not to sue as soon as possible after the President has available the information necessary to reach such a settlement or grant such a covenant.
(4) Consent decree or administrative order
A settlement under this subsection shall be entered as a consent decree or embodied in an administrative order setting forth the terms of the settlement. In the case of any facility where the total response costs exceed $500,000 (excluding interest), if the settlement is embodied as an administrative order, the order may be issued only with the prior written approval of the Attorney General. If the Attorney General or his designee has not approved or disapproved the order within 30 days of this referral, the order shall be deemed to be approved unless the Attorney General and the Administrator have agreed to extend the time. The district court for the district in which the release or threatened release occurs may enforce any such administrative order.
(5) Effect of agreement
A party who has resolved its liability to the United States under this subsection shall not be liable for claims for contribution regarding matters addressed in the settlement. Such settlement does not discharge any of the other potentially responsible parties unless its terms so provide, but it reduces the potential liability of the others by the amount of the settlement.
(6) Settlements with other potentially responsible parties
Nothing in this subsection shall be construed to affect the authority of the President to reach settlements with other potentially responsible parties under this chapter.
(7) Reduction in settlement amount based on limited ability to pay
(A) In general
The condition for settlement under this paragraph is that the potentially responsible party is a person who demonstrates to the President an inability or a limited ability to pay response costs.
(B) Considerations
In determining whether or not a demonstration is made under subparagraph (A) by a person, the President shall take into consideration the ability of the person to pay response costs and still maintain its basic business operations, including consideration of the overall financial condition of the person and demonstrable constraints on the ability of the person to raise revenues.
(C) Information
A person requesting settlement under this paragraph shall promptly provide the President with all relevant information needed to determine the ability of the person to pay response costs.
(D) Alternative payment methods
If the President determines that a person is unable to pay its total settlement amount at the time of settlement, the President shall consider such alternative payment methods as may be necessary or appropriate.
(8) Additional conditions for expedited settlements
(A) Waiver of claims
The President shall require, as a condition for settlement under this subsection, that a potentially responsible party waive all of the claims (including a claim for contribution under this chapter) that the party may have against other potentially responsible parties for response costs incurred with respect to the facility, unless the President determines that requiring a waiver would be unjust.
(B) Failure to comply
The President may decline to offer a settlement to a potentially responsible party under this subsection if the President determines that the potentially responsible party has failed to comply with any request for access or information or an administrative subpoena issued by the President under this chapter or has impeded or is impeding, through action or inaction, the performance of a response action with respect to the facility.
(C) Responsibility to provide information and access
A potentially responsible party that enters into a settlement under this subsection shall not be relieved of the responsibility to provide any information or access requested in accordance with subsection (e)(3)(B) or
(9) Basis of determination
If the President determines that a potentially responsible party is not eligible for settlement under this subsection, the President shall provide the reasons for the determination in writing to the potentially responsible party that requested a settlement under this subsection.
(10) Notification
As soon as practicable after receipt of sufficient information to make a determination, the President shall notify any person that the President determines is eligible under paragraph (1) of the person's eligibility for an expedited settlement.
(11) No judicial review
A determination by the President under paragraph (7), (8), (9), or (10) shall not be subject to judicial review.
(12) Notice of settlement
After a settlement under this subsection becomes final with respect to a facility, the President shall promptly notify potentially responsible parties at the facility that have not resolved their liability to the United States of the settlement.
(h) Cost recovery settlement authority
(1) Authority to settle
The head of any department or agency with authority to undertake a response action under this chapter pursuant to the national contingency plan may consider, compromise, and settle a claim under
(2) Use of arbitration
Arbitration in accordance with regulations promulgated under this subsection may be used as a method of settling claims of the United States where the total response costs for the facility concerned do not exceed $500,000 (excluding interest). After consultation with the Attorney General, the department or agency head may establish and publish regulations for the use of arbitration or settlement under this subsection.
(3) Recovery of claims
If any person fails to pay a claim that has been settled under this subsection, the department or agency head shall request the Attorney General to bring a civil action in an appropriate district court to recover the amount of such claim, plus costs, attorneys' fees, and interest from the date of the settlement. In such an action, the terms of the settlement shall not be subject to review.
(4) Claims for contribution
A person who has resolved its liability to the United States under this subsection shall not be liable for claims for contribution regarding matters addressed in the settlement. Such settlement shall not discharge any of the other potentially liable persons unless its terms so provide, but it reduces the potential liability of the others by the amount of the settlement.
(i) Settlement procedures
(1) Publication in Federal Register
At least 30 days before any settlement (including any settlement arrived at through arbitration) may become final under subsection (h), or under subsection (g) in the case of a settlement embodied in an administrative order, the head of the department or agency which has jurisdiction over the proposed settlement shall publish in the Federal Register notice of the proposed settlement. The notice shall identify the facility concerned and the parties to the proposed settlement.
(2) Comment period
For a 30-day period beginning on the date of publication of notice under paragraph (1) of a proposed settlement, the head of the department or agency which has jurisdiction over the proposed settlement shall provide an opportunity for persons who are not parties to the proposed settlement to file written comments relating to the proposed settlement.
(3) Consideration of comments
The head of the department or agency shall consider any comments filed under paragraph (2) in determining whether or not to consent to the proposed settlement and may withdraw or withhold consent to the proposed settlement if such comments disclose facts or considerations which indicate the proposed settlement is inappropriate, improper, or inadequate.
(j) Natural resources
(1) Notification of trustee
Where a release or threatened release of any hazardous substance that is the subject of negotiations under this section may have resulted in damages to natural resources under the trusteeship of the United States, the President shall notify the Federal natural resource trustee of the negotiations and shall encourage the participation of such trustee in the negotiations.
(2) Covenant not to sue
An agreement under this section may contain a covenant not to sue under
(k) Section not applicable to vessels
The provisions of this section shall not apply to releases from a vessel.
(l) Civil penalties
A potentially responsible party which is a party to an administrative order or consent decree entered pursuant to an agreement under this section or
(m) Applicability of general principles of law
In the case of consent decrees and other settlements under this section (including covenants not to sue), no provision of this chapter shall be construed to preclude or otherwise affect the applicability of general principles of law regarding the setting aside or modification of consent decrees or other settlements.
(
Editorial Notes
References in Text
This chapter, referred to in text, was in the original "this Act", meaning
The Federal Rules of Evidence, referred to in subsec. (d)(1)(B), are set out in the Appendix to Title 28, Judiciary and Judicial Procedure.
Amendments
2002—Subsec. (g)(7) to (12).
Statutory Notes and Related Subsidiaries
Effect on Concluded Actions
Amendment by
Coordination of Titles I to IV of Pub. L. 99–499
Any provision of titles I to IV of
§9623. Reimbursement to local governments
(a) Application
Any general purpose unit of local government for a political subdivision which is affected by a release or threatened release at any facility may apply to the President for reimbursement under this section.
(b) Reimbursement
(1) Temporary emergency measures
The President is authorized to reimburse local community authorities for expenses incurred (before or after October 17, 1986) in carrying out temporary emergency measures necessary to prevent or mitigate injury to human health or the environment associated with the release or threatened release of any hazardous substance or pollutant or contaminant. Such measures may include, where appropriate, security fencing to limit access, response to fires and explosions, and other measures which require immediate response at the local level.
(2) Local funds not supplanted
Reimbursement under this section shall not supplant local funds normally provided for response.
(c) Amount
The amount of any reimbursement to any local authority under subsection (b)(1) may not exceed $25,000 for a single response. The reimbursement under this section with respect to a single facility shall be limited to the units of local government having jurisdiction over the political subdivision in which the facility is located.
(d) Procedure
Reimbursements authorized pursuant to this section shall be in accordance with rules promulgated by the Administrator within one year after October 17, 1986.
(
§9624. Methane recovery
(a) In general
In the case of a facility at which equipment for the recovery or processing (including recirculation of condensate) of methane has been installed, for purposes of this chapter:
(1) The owner or operator of such equipment shall not be considered an "owner or operator", as defined in
(2) The owner or operator of such equipment shall not be considered to have arranged for disposal or treatment of any hazardous substance at such facility pursuant to
(3) The owner or operator of such equipment shall not be subject to any action under
(b) Exceptions
Subsection (a) does not apply with respect to a release or threatened release of a hazardous substance from a facility described in subsection (a) if either of the following circumstances exist:
(1) The release or threatened release was primarily caused by activities of the owner or operator of the equipment described in subsection (a).
(2) The owner or operator of such equipment would be covered by paragraph (1), (2), (3), or (4) of subsection (a) of
In the case of any release or threatened release referred to in paragraph (1), the owner or operator of the equipment described in subsection (a) shall be liable under this chapter only for costs or damages primarily caused by the activities of such owner or operator.
(
Editorial Notes
References in Text
This chapter, referred to in text, was in the original "this Act", meaning
§9625. Section 6921(b)(3)(A)(i) waste
(a) Revision of hazard ranking system
This section shall apply only to facilities which are not included or proposed for inclusion on the National Priorities List and which contain substantial volumes of waste described in
(1) The quantity, toxicity, and concentrations of hazardous constituents which are present in such waste and a comparison thereof with other wastes.
(2) The extent of, and potential for, release of such hazardous constituents into the environment.
(3) The degree of risk to human health and the environment posed by such constituents.
(b) Inclusion prohibited
Until the hazard ranking system is revised as required by this section, the President may not include on the National Priorities List any facility which contains substantial volumes of waste described in
(
Editorial Notes
References in Text
This chapter, referred to in subsec. (b), was in the original "this Act", meaning
§9626. Indian tribes
(a) Treatment generally
The governing body of an Indian tribe shall be afforded substantially the same treatment as a State with respect to the provisions of
(b) Community relocation
Should the President determine that proper remedial action is the permanent relocation of tribal members away from a contaminated site because it is cost effective and necessary to protect their health and welfare, such finding must be concurred in by the affected tribal government before relocation shall occur. The President, in cooperation with the Secretary of the Interior, shall also assure that all benefits of the relocation program are provided to the affected tribe and that alternative land of equivalent value is available and satisfactory to the tribe. Any lands acquired for relocation of tribal members shall be held in trust by the United States for the benefit of the tribe.
(c) Study
The President shall conduct a survey, in consultation with the Indian tribes, to determine the extent of hazardous waste sites on Indian lands. Such survey shall be included within a report which shall make recommendations on the program needs of tribes under this chapter, with particular emphasis on how tribal participation in the administration of such programs can be maximized. Such report shall be submitted to Congress along with the President's budget request for fiscal year 1988.
(d) Limitation
Notwithstanding any other provision of this chapter, no action under this chapter by an Indian tribe shall be barred until the later of the following:
(1) The applicable period of limitations has expired.
(2) 2 years after the United States, in its capacity as trustee for the tribe, gives written notice to the governing body of the tribe that it will not present a claim or commence an action on behalf of the tribe or fails to present a claim or commence an action within the time limitations specified in this chapter.
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (c) and (d), was in the original "this Act", meaning
§9627. Recycling transactions
(a) Liability clarification
(1) As provided in subsections (b), (c), (d), and (e), a person who arranged for recycling of recyclable material shall not be liable under
(2) A determination whether or not any person shall be liable under
(b) Recyclable material defined
For purposes of this section, the term "recyclable material" means scrap paper, scrap plastic, scrap glass, scrap textiles, scrap rubber (other than whole tires), scrap metal, or spent lead-acid, spent nickel-cadmium, and other spent batteries, as well as minor amounts of material incident to or adhering to the scrap material as a result of its normal and customary use prior to becoming scrap; except that such term shall not include—
(1) shipping containers of a capacity from 30 liters to 3,000 liters, whether intact or not, having any hazardous substance (but not metal bits and pieces or hazardous substance that form an integral part of the container) contained in or adhering thereto; or
(2) any item of material that contained polychlorinated biphenyls at a concentration in excess of 50 parts per million or any new standard promulgated pursuant to applicable Federal laws.
(c) Transactions involving scrap paper, plastic, glass, textiles, or rubber
Transactions involving scrap paper, scrap plastic, scrap glass, scrap textiles, or scrap rubber (other than whole tires) shall be deemed to be arranging for recycling if the person who arranged for the transaction (by selling recyclable material or otherwise arranging for the recycling of recyclable material) can demonstrate by a preponderance of the evidence that all of the following criteria were met at the time of the transaction:
(1) The recyclable material met a commercial specification grade.
(2) A market existed for the recyclable material.
(3) A substantial portion of the recyclable material was made available for use as feedstock for the manufacture of a new saleable product.
(4) The recyclable material could have been a replacement or substitute for a virgin raw material, or the product to be made from the recyclable material could have been a replacement or substitute for a product made, in whole or in part, from a virgin raw material.
(5) For transactions occurring 90 days or more after November 29, 1999, the person exercised reasonable care to determine that the facility where the recyclable material was handled, processed, reclaimed, or otherwise managed by another person (hereinafter in this section referred to as a "consuming facility") was in compliance with substantive (not procedural or administrative) provisions of any Federal, State, or local environmental law or regulation, or compliance order or decree issued pursuant thereto, applicable to the handling, processing, reclamation, storage, or other management activities associated with recyclable material.
(6) For purposes of this subsection, "reasonable care" shall be determined using criteria that include (but are not limited to)—
(A) the price paid in the recycling transaction;
(B) the ability of the person to detect the nature of the consuming facility's operations concerning its handling, processing, reclamation, or other management activities associated with recyclable material; and
(C) the result of inquiries made to the appropriate Federal, State, or local environmental agency (or agencies) regarding the consuming facility's past and current compliance with substantive (not procedural or administrative) provisions of any Federal, State, or local environmental law or regulation, or compliance order or decree issued pursuant thereto, applicable to the handling, processing, reclamation, storage, or other management activities associated with the recyclable material. For the purposes of this paragraph, a requirement to obtain a permit applicable to the handling, processing, reclamation, or other management activity associated with the recyclable materials shall be deemed to be a substantive provision.
(d) Transactions involving scrap metal
(1) Transactions involving scrap metal shall be deemed to be arranging for recycling if the person who arranged for the transaction (by selling recyclable material or otherwise arranging for the recycling of recyclable material) can demonstrate by a preponderance of the evidence that at the time of the transaction—
(A) the person met the criteria set forth in subsection (c) with respect to the scrap metal;
(B) the person was in compliance with any applicable regulations or standards regarding the storage, transport, management, or other activities associated with the recycling of scrap metal that the Administrator promulgates under the Solid Waste Disposal Act [
(C) the person did not melt the scrap metal prior to the transaction.
(2) For purposes of paragraph (1)(C), melting of scrap metal does not include the thermal separation of 2 or more materials due to differences in their melting points (referred to as "sweating").
(3) For purposes of this subsection, the term "scrap metal" means bits and pieces of metal parts (e.g., bars, turnings, rods, sheets, wire) or metal pieces that may be combined together with bolts or soldering (e.g., radiators, scrap automobiles, railroad box cars), which when worn or superfluous can be recycled, except for scrap metals that the Administrator excludes from this definition by regulation.
(e) Transactions involving batteries
Transactions involving spent lead-acid batteries, spent nickel-cadmium batteries, or other spent batteries shall be deemed to be arranging for recycling if the person who arranged for the transaction (by selling recyclable material or otherwise arranging for the recycling of recyclable material) can demonstrate by a preponderance of the evidence that at the time of the transaction—
(1) the person met the criteria set forth in subsection (c) with respect to the spent lead-acid batteries, spent nickel-cadmium batteries, or other spent batteries, but the person did not recover the valuable components of such batteries; and
(2)(A) with respect to transactions involving lead-acid batteries, the person was in compliance with applicable Federal environmental regulations or standards, and any amendments thereto, regarding the storage, transport, management, or other activities associated with the recycling of spent lead-acid batteries;
(B) with respect to transactions involving nickel-cadmium batteries, Federal environmental regulations or standards are in effect regarding the storage, transport, management, or other activities associated with the recycling of spent nickel-cadmium batteries, and the person was in compliance with applicable regulations or standards or any amendments thereto; or
(C) with respect to transactions involving other spent batteries, Federal environmental regulations or standards are in effect regarding the storage, transport, management, or other activities associated with the recycling of such batteries, and the person was in compliance with applicable regulations or standards or any amendments thereto.
(f) Exclusions
(1) The exemptions set forth in subsections (c), (d), and (e) shall not apply if—
(A) the person had an objectively reasonable basis to believe at the time of the recycling transaction—
(i) that the recyclable material would not be recycled;
(ii) that the recyclable material would be burned as fuel, or for energy recovery or incineration; or
(iii) for transactions occurring before 90 days after November 29, 1999, that the consuming facility was not in compliance with a substantive (not procedural or administrative) provision of any Federal, State, or local environmental law or regulation, or compliance order or decree issued pursuant thereto, applicable to the handling, processing, reclamation, or other management activities associated with the recyclable material;
(B) the person had reason to believe that hazardous substances had been added to the recyclable material for purposes other than processing for recycling; or
(C) the person failed to exercise reasonable care with respect to the management and handling of the recyclable material (including adhering to customary industry practices current at the time of the recycling transaction designed to minimize, through source control, contamination of the recyclable material by hazardous substances).
(2) For purposes of this subsection, an objectively reasonable basis for belief shall be determined using criteria that include (but are not limited to) the size of the person's business, customary industry practices (including customary industry practices current at the time of the recycling transaction designed to minimize, through source control, contamination of the recyclable material by hazardous substances), the price paid in the recycling transaction, and the ability of the person to detect the nature of the consuming facility's operations concerning its handling, processing, reclamation, or other management activities associated with the recyclable material.
(3) For purposes of this subsection, a requirement to obtain a permit applicable to the handling, processing, reclamation, or other management activities associated with recyclable material shall be deemed to be a substantive provision.
(g) Effect on other liability
Nothing in this section shall be deemed to affect the liability of a person under paragraph (1) or (2) of
(h) Regulations
The Administrator has the authority, under
(i) Effect on pending or concluded actions
The exemptions provided in this section shall not affect any concluded judicial or administrative action or any pending judicial action initiated by the United States prior to November 29, 1999.
(j) Liability for attorney's fees for certain actions
Any person who commences an action in contribution against a person who is not liable by operation of this section shall be liable to that person for all reasonable costs of defending that action, including all reasonable attorney's and expert witness fees.
(k) Relationship to liability under other laws
Nothing in this section shall affect—
(1) liability under any other Federal, State, or local statute or regulation promulgated pursuant to any such statute, including any requirements promulgated by the Administrator under the Solid Waste Disposal Act [
(2) the ability of the Administrator to promulgate regulations under any other statute, including the Solid Waste Disposal Act.
(l) Limitation on statutory construction
Nothing in this section shall be construed to—
(1) affect any defenses or liabilities of any person to whom subsection (a)(1) does not apply; or
(2) create any presumption of liability against any person to whom subsection (a)(1) does not apply.
(
Editorial Notes
References in Text
The Solid Waste Disposal Act, referred to in subsecs. (d)(1)(B) and (k), is title II of
Statutory Notes and Related Subsidiaries
Superfund Recycling Equity; Purposes
"(1) to promote the reuse and recycling of scrap material in furtherance of the goals of waste minimization and natural resource conservation while protecting human health and the environment;
"(2) to create greater equity in the statutory treatment of recycled versus virgin materials; and
"(3) to remove the disincentives and impediments to recycling created as an unintended consequence of the 1980 Superfund liability provisions."
1 So in original. Probably should be "subsection".
§9628. State response programs
(a) Assistance to States
(1) In general
(A) States
The Administrator may award a grant to a State or Indian tribe that—
(i) has a response program that includes each of the elements, or is taking reasonable steps to include each of the elements, listed in paragraph (2); or
(ii) is a party to a memorandum of agreement with the Administrator for voluntary response programs.
(B) Use of grants by States
(i) In general
A State or Indian tribe may use a grant under this subsection to establish or enhance the response program of the State or Indian tribe.
(ii) Additional uses
In addition to the uses under clause (i), a State or Indian tribe may use a grant under this subsection to—
(I) capitalize a revolving loan fund for brownfield remediation under
(II) purchase insurance or develop a risk sharing pool, an indemnity pool, or insurance mechanism to provide financing for response actions under a State response program; or
(III) assist small communities, Indian tribes, rural areas, or disadvantaged areas in carrying out activities described in
(iii) Small communities, Indian tribes, rural areas, and disadvantaged areas
(I) In general
To make grants to States or Indian tribes under clause (ii)(III), the Administrator may use, in addition to amounts available to carry out this subsection, not more than $1,500,000 of the amounts made available to carry out
(II) Limitation
Each grant made under subclause (I) may be not more than $20,000.
(III) Inclusion in other grants
The Administrator may, at the request of a State or Indian tribe, include a grant under this clause in any other grant to the State or Indian tribe made under this subsection.
(iv) Definitions
In this subparagraph:
(I) Disadvantaged area
The term "disadvantaged area" means a community with an annual median household income that is less than 80 percent of the statewide annual median household income, as determined by the President based on the latest available decennial census.
(II) Small community
The term "small community" means a community with a population of not more than 15,000 individuals, as determined by the President based on the latest available decennial census.
(2) Elements
The elements of a State or Indian tribe response program referred to in paragraph (1)(A)(i) are the following:
(A) Timely survey and inventory of brownfield sites in the State.
(B) Oversight and enforcement authorities or other mechanisms, and resources, that are adequate to ensure that—
(i) a response action will—
(I) protect human health and the environment; and
(II) be conducted in accordance with applicable Federal and State law; and
(ii) if the person conducting the response action fails to complete the necessary response activities, including operation and maintenance or long-term monitoring activities, the necessary response activities are completed.
(C) Mechanisms and resources to provide meaningful opportunities for public participation, including—
(i) public access to documents that the State, Indian tribe, or party conducting the cleanup is relying on or developing in making cleanup decisions or conducting site activities;
(ii) prior notice and opportunity for comment on proposed cleanup plans and site activities; and
(iii) a mechanism by which—
(I) a person that is or may be affected by a release or threatened release of a hazardous substance, pollutant, or contaminant at a brownfield site located in the community in which the person works or resides may request the conduct of a site assessment; and
(II) an appropriate State official shall consider and appropriately respond to a request under subclause (I).
(D) Mechanisms for approval of a cleanup plan, and a requirement for verification by and certification or similar documentation from the State, an Indian tribe, or a licensed site professional to the person conducting a response action indicating that the response is complete.
(3) Funding
There is authorized to be appropriated to carry out this subsection $50,000,000 for each of fiscal years 2019 through 2023.
(b) Enforcement in cases of a release subject to State program
(1) Enforcement
(A) In general
Except as provided in subparagraph (B) and subject to subparagraph (C), in the case of an eligible response site at which—
(i) there is a release or threatened release of a hazardous substance, pollutant, or contaminant; and
(ii) a person is conducting or has completed a response action regarding the specific release that is addressed by the response action that is in compliance with the State program that specifically governs response actions for the protection of public health and the environment,
the President may not use authority under this chapter to take an administrative or judicial enforcement action under
(B) Exceptions
The President may bring an administrative or judicial enforcement action under this chapter during or after completion of a response action described in subparagraph (A) with respect to a release or threatened release at an eligible response site described in that subparagraph if—
(i) the State requests that the President provide assistance in the performance of a response action;
(ii) the Administrator determines that contamination has migrated or will migrate across a State line, resulting in the need for further response action to protect human health or the environment, or the President determines that contamination has migrated or is likely to migrate onto property subject to the jurisdiction, custody, or control of a department, agency, or instrumentality of the United States and may impact the authorized purposes of the Federal property;
(iii) after taking into consideration the response activities already taken, the Administrator determines that—
(I) a release or threatened release may present an imminent and substantial endangerment to public health or welfare or the environment; and
(II) additional response actions are likely to be necessary to address, prevent, limit, or mitigate the release or threatened release; or
(iv) the Administrator, after consultation with the State, determines that information, that on the earlier of the date on which cleanup was approved or completed, was not known by the State, as recorded in documents prepared or relied on in selecting or conducting the cleanup, has been discovered regarding the contamination or conditions at a facility such that the contamination or conditions at the facility present a threat requiring further remediation to protect public health or welfare or the environment. Consultation with the State shall not limit the ability of the Administrator to make this determination.
(C) Public record
The limitations on the authority of the President under subparagraph (A) apply only at sites in States that maintain, update not less than annually, and make available to the public a record of sites, by name and location, at which response actions have been completed in the previous year and are planned to be addressed under the State program that specifically governs response actions for the protection of public health and the environment in the upcoming year. The public record shall identify whether or not the site, on completion of the response action, will be suitable for unrestricted use and, if not, shall identify the institutional controls relied on in the remedy. Each State and tribe receiving financial assistance under subsection (a) shall maintain and make available to the public a record of sites as provided in this paragraph.
(D) EPA notification
(i) In general
In the case of an eligible response site at which there is a release or threatened release of a hazardous substance, pollutant, or contaminant and for which the Administrator intends to carry out an action that may be barred under subparagraph (A), the Administrator shall—
(I) notify the State of the action the Administrator intends to take; and
(II)(aa) wait 48 hours for a reply from the State under clause (ii); or
(bb) if the State fails to reply to the notification or if the Administrator makes a determination under clause (iii), take immediate action under that clause.
(ii) State reply
Not later than 48 hours after a State receives notice from the Administrator under clause (i), the State shall notify the Administrator if—
(I) the release at the eligible response site is or has been subject to a cleanup conducted under a State program; and
(II) the State is planning to abate the release or threatened release, any actions that are planned.
(iii) Immediate Federal action
The Administrator may take action immediately after giving notification under clause (i) without waiting for a State reply under clause (ii) if the Administrator determines that one or more exceptions under subparagraph (B) are met.
(E) Report to Congress
Not later than 90 days after the date of initiation of any enforcement action by the President under clause (ii), (iii), or (iv) of subparagraph (B), the President shall submit to Congress a report describing the basis for the enforcement action, including specific references to the facts demonstrating that enforcement action is permitted under subparagraph (B).
(2) Savings provision
(A) Costs incurred prior to limitations
Nothing in paragraph (1) precludes the President from seeking to recover costs incurred prior to January 11, 2002, or during a period in which the limitations of paragraph (1)(A) were not applicable.
(B) Effect on agreements between States and EPA
Nothing in paragraph (1)—
(i) modifies or otherwise affects a memorandum of agreement, memorandum of understanding, or any similar agreement relating to this chapter between a State agency or an Indian tribe and the Administrator that is in effect on or before January 11, 2002 (which agreement shall remain in effect, subject to the terms of the agreement); or
(ii) limits the discretionary authority of the President to enter into or modify an agreement with a State, an Indian tribe, or any other person relating to the implementation by the President of statutory authorities.
(3) Effective date
This subsection applies only to response actions conducted after February 15, 2001.
(c) Effect on Federal laws
Nothing in this section affects any liability or response authority under any Federal law, including—
(1) this chapter, except as provided in subsection (b);
(2) the Solid Waste Disposal Act (
(3) the Federal Water Pollution Control Act (
(4) the Toxic Substances Control Act (
(5) the Safe Drinking Water Act (
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (b)(1)(A), (B), (2)(B)(i) and (c)(1), was in the original "this Act", meaning
The Solid Waste Disposal Act, referred to in subsec. (c)(2), is title II of
The Federal Water Pollution Control Act, referred to in subsec. (c)(3), is act June 30, 1948, ch. 758, as amended generally by
The Toxic Substances Control Act, referred to in subsec. (c)(4), is
The Safe Drinking Water Act, referred to in subsec. (c)(5), is title XIV of act July 1, 1944, as added Dec. 16, 1974,
Amendments
2018—Subsec. (a)(1)(B)(ii)(III).
Subsec. (a)(1)(B)(iii), (iv).
Subsec. (a)(3).
SUBCHAPTER II—HAZARDOUS SUBSTANCE RESPONSE REVENUE
Part A—Hazardous Substance Response Trust Fund
§§9631 to 9633. Repealed. Pub. L. 99–499, title V, §517(c)(1), Oct. 17, 1986, 100 Stat. 1774
Section 9631,
Section 9632,
Section 9633,
Statutory Notes and Related Subsidiaries
Effective Date of Repeal
Repeal by
Part B—Post-closure Liability Trust Fund
§9641. Repealed. Pub. L. 99–499, title V, §514(b), Oct. 17, 1986, 100 Stat. 1767
Section,
Statutory Notes and Related Subsidiaries
Effective Date of Repeal
"(1)
"(2)
SUBCHAPTER III—MISCELLANEOUS PROVISIONS
§9651. Reports and studies
(a) Implementation experiences; identification and disposal of waste
(1) The President shall submit to the Congress, within four years after December 11, 1980, a comprehensive report on experience with the implementation of this chapter including, but not limited to—
(A) the extent to which the chapter and Fund are effective in enabling Government to respond to and mitigate the effects of releases of hazardous substances;
(B) a summary of past receipts and disbursements from the Fund;
(C) a projection of any future funding needs remaining after the expiration of authority to collect taxes, and of the threat to public health, welfare, and the environment posed by the projected releases which create any such needs;
(D) the record and experience of the Fund in recovering Fund disbursements from liable parties;
(E) the record of State participation in the system of response, liability, and compensation established by this chapter;
(F) the impact of the taxes imposed by subchapter II 1 of this chapter on the Nation's balance of trade with other countries;
(G) an assessment of the feasibility and desirability of a schedule of taxes which would take into account one or more of the following: the likelihood of a release of a hazardous substance, the degree of hazard and risk of harm to public health, welfare, and the environment resulting from any such release, incentives to proper handling, recycling, incineration, and neutralization of hazardous wastes, and disincentives to improper or illegal handling or disposal of hazardous materials, administrative and reporting burdens on Government and industry, and the extent to which the tax burden falls on the substances and parties which create the problems addressed by this chapter. In preparing the report, the President shall consult with appropriate Federal, State, and local agencies, affected industries and claimants, and such other interested parties as he may find useful. Based upon the analyses and consultation required by this subsection, the President shall also include in the report any recommendations for legislative changes he may deem necessary for the better effectuation of the purposes of this chapter, including but not limited to recommendations concerning authorization levels, taxes, State participation, liability and liability limits, and financial responsibility provisions for the Response Trust Fund and the Post-closure Liability Trust Fund;
(H) an exemption from or an increase in the substances or the amount of taxes imposed by
(I) the economic impact of taxing coal-derived substances and recycled metals.
(2) The Administrator of the Environmental Protection Agency (in consultation with the Secretary of the Treasury) shall submit to the Congress (i) within four years after December 11, 1980, a report identifying additional wastes designated by rule as hazardous after the effective date of this chapter and pursuant to section 3001 of the Solid Waste Disposal Act [
(b) Private insurance protection
The President shall conduct a study to determine (1) whether adequate private insurance protection is available on reasonable terms and conditions to the owners and operators of vessels and facilities subject to liability under
(c) Regulations respecting assessment of damages to natural resources
(1) The President, acting through Federal officials designated by the National Contingency Plan published under
(2) Such regulations shall specify (A) standard procedures for simplified assessments requiring minimal field observation, including establishing measures of damages based on units of discharge or release or units of affected area, and (B) alternative protocols for conducting assessments in individual cases to determine the type and extent of short- and long-term injury, destruction, or loss. Such regulations shall identify the best available procedures to determine such damages, including both direct and indirect injury, destruction, or loss and shall take into consideration factors including, but not limited to, replacement value, use value, and ability of the ecosystem or resource to recover.
(3) Such regulations shall be reviewed and revised as appropriate every two years.
(d) Issues, alternatives, and policy considerations involving selection of locations for waste treatment, storage, and disposal facilities
The Administrator of the Environmental Protection Agency shall, in consultation with other Federal agencies and appropriate representatives of State and local governments and nongovernmental agencies, conduct a study and report to the Congress within two years of December 11, 1980, on the issues, alternatives, and policy considerations involved in the selection of locations for hazardous waste treatment, storage, and disposal facilities. This study shall include—
(A) an assessment of current and projected treatment, storage, and disposal capacity needs and shortfalls for hazardous waste by management category on a State-by-State basis;
(B) an evaluation of the appropriateness of a regional approach to siting and designing hazardous waste management facilities and the identification of hazardous waste management regions, interstate or intrastate, or both, with similar hazardous waste management needs;
(C) solicitation and analysis of proposals for the construction and operation of hazardous waste management facilities by nongovernmental entities, except that no proposal solicited under terms of this subsection shall be analyzed if it involves cost to the United States Government or fails to comply with the requirements of subtitle C of the Solid Waste Disposal Act [
(D) recommendations on the appropriate balance between public and private sector involvement in the siting, design, and operation of new hazardous waste management facilities;
(E) documentation of the major reasons for public opposition to new hazardous waste management facilities; and
(F) an evaluation of the various options for overcoming obstacles to siting new facilities, including needed legislation for implementing the most suitable option or options.
(e) Adequacy of existing common law and statutory remedies
(1) In order to determine the adequacy of existing common law and statutory remedies in providing legal redress for harm to man and the environment caused by the release of hazardous substances into the environment, there shall be submitted to the Congress a study within twelve months of December 11, 1980.
(2) This study shall be conducted with the assistance of the American Bar Association, the American Law Institute, the Association of American Trial Lawyers, and the National Association of State Attorneys General with the President of each entity selecting three members from each organization to conduct the study. The study chairman and one reporter shall be elected from among the twelve members of the study group.
(3) As part of their review of the adequacy of existing common law and statutory remedies, the study group shall evaluate the following:
(A) the nature, adequacy, and availability of existing remedies under present law in compensating for harm to man from the release of hazardous substances;
(B) the nature of barriers to recovery (particularly with respect to burdens of going forward and of proof and relevancy) and the role such barriers play in the legal system;
(C) the scope of the evidentiary burdens placed on the plaintiff in proving harm from the release of hazardous substances, particularly in light of the scientific uncertainty over causation with respect to—
(i) carcinogens, mutagens, and teratogens, and
(ii) the human health effects of exposure to low doses of hazardous substances over long periods of time;
(D) the nature and adequacy of existing remedies under present law in providing compensation for damages to natural resources from the release of hazardous substances;
(E) the scope of liability under existing law and the consequences, particularly with respect to obtaining insurance, of any changes in such liability;
(F) barriers to recovery posed by existing statutes of limitations.
(4) The report shall be submitted to the Congress with appropriate recommendations. Such recommendations shall explicitly address—
(A) the need for revisions in existing statutory or common law, and
(B) whether such revisions should take the form of Federal statutes or the development of a model code which is recommended for adoption by the States.
(5) The Fund shall pay administrative expenses incurred for the study. No expenses shall be available to pay compensation, except expenses on a per diem basis for the one reporter, but in no case shall the total expenses of the study exceed $300,000.
(f) Modification of national contingency plan
The President, acting through the Administrator of the Environmental Protection Agency, the Secretary of Transportation, the Administrator of the Occupational Safety and Health Administration, and the Director of the National Institute for Occupational Safety and Health shall study and, not later than two years after December 11, 1980, shall modify the national contingency plan to provide for the protection of the health and safety of employees involved in response actions.
(g) Insurability study
(1) Study by Comptroller General
The Comptroller General of the United States, in consultation with the persons described in paragraph (2), shall undertake a study to determine the insurability, and effects on the standard of care, of the liability of each of the following:
(A) Persons who generate hazardous substances: liability for costs and damages under this chapter.
(B) Persons who own or operate facilities: liability for costs and damages under this chapter.
(C) Persons liable for injury to persons or property caused by the release of hazardous substances into the environment.
(2) Consultation
In conducting the study under this subsection, the Comptroller General shall consult with the following:
(A) Representatives of the Administrator.
(B) Representatives of persons described in subparagraphs (A) through (C) of the preceding paragraph.
(C) Representatives (i) of groups or organizations comprised generally of persons adversely affected by releases or threatened releases of hazardous substances and (ii) of groups organized for protecting the interests of consumers.
(D) Representatives of property and casualty insurers.
(E) Representatives of reinsurers.
(F) Persons responsible for the regulation of insurance at the State level.
(3) Items evaluated
The study under this section shall include, among other matters, an evaluation of the following:
(A) Current economic conditions in, and the future outlook for, the commercial market for insurance and reinsurance.
(B) Current trends in statutory and common law remedies.
(C) The impact of possible changes in traditional standards of liability, proof, evidence, and damages on existing statutory and common law remedies.
(D) The effect of the standard of liability and extent of the persons upon whom it is imposed under this chapter on the protection of human health and the environment and on the availability, underwriting, and pricing of insurance coverage.
(E) Current trends, if any, in the judicial interpretation and construction of applicable insurance contracts, together with the degree to which amendments in the language of such contracts and the description of the risks assumed, could affect such trends.
(F) The frequency and severity of a representative sample of claims closed during the calendar year immediately preceding October 17, 1986.
(G) Impediments to the acquisition of insurance or other means of obtaining liability coverage other than those referred to in the preceding subparagraphs.
(H) The effects of the standards of liability and financial responsibility requirements imposed pursuant to this chapter on the cost of, and incentives for, developing and demonstrating alternative and innovative treatment technologies, as well as waste generation minimization.
(4) Submission
The Comptroller General shall submit a report on the results of the study to Congress with appropriate recommendations within 12 months after October 17, 1986.
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (a)(1)(A), (E), (G), (c)(1), and (g), was in the original "this Act", meaning
Subchapter II of this chapter, referred to in subsec. (a)(1)(F), was in the original "title II of this Act", meaning title II of
For effective date of this chapter, referred to in subsec. (a)(2), see
Subsection 3001(b)(2)(B) and subsection 3001(b)(3)(A) of the Solid Waste Disposal Act of 1980, referred to in subsec. (a)(2), probably mean section 3001(b)(2)(B) and (3)(A) of the Solid Waste Disposal Act, as amended by the Solid Waste Disposal Act Amendments of 1980, which enacted section 6921(b)(2)(B) and (3)(A) of this title.
The Solid Waste Disposal Act, referred to in subsecs. (a)(2) and (d)(C), is title II of
Codification
Subsec. (h) of this section, which required the Administrator of the Environmental Protection Agency to submit an annual report to Congress of such Agency on the progress achieved in implementing this chapter during the preceding fiscal year, required the Inspector General of the Agency to review the report for reasonableness and accuracy and submit to Congress, as a part of that report, a report on the results of the review, and required the appropriate authorizing committees of Congress, after receiving those reports, to conduct oversight hearings to ensure that this chapter is being implemented according to the purposes of this chapter and congressional intent in enacting this chapter, terminated, effective May 15, 2000, pursuant to section 3003 of
Amendments
1986—Subsec. (a)(1)(H).
Subsec. (c)(1).
Subsec. (g).
Subsec. (h).
1 See References in Text note below.
§9652. Effective dates; savings provisions
(a) Unless otherwise provided, all provisions of this chapter shall be effective on December 11, 1980.
(b) Any regulation issued pursuant to any provisions of
(c) Any regulation—
(1) respecting financial responsibility,
(2) issued pursuant to any provision of law repealed or superseded by this chapter, and
(3) in effect on the date immediately preceding the effective date of this chapter shall be deemed to be a regulation issued pursuant to the authority of this chapter and shall remain in full force and effect unless or until superseded by new regulations issued thereunder.
(d) Nothing in this chapter shall affect or modify in any way the obligations or liabilities of any person under other Federal or State law, including common law, with respect to releases of hazardous substances or other pollutants or contaminants. The provisions of this chapter shall not be considered, interpreted, or construed in any way as reflecting a determination, in part or whole, of policy regarding the inapplicability of strict liability, or strict liability doctrines, to activities relating to hazardous substances, pollutants, or contaminants or other such activities.
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (a), (b), (c)(2), (3), and (d), was in the original "this Act", meaning
§9653. Repealed. Pub. L. 99–499, title V, §511(b), Oct. 17, 1986, 100 Stat. 1761
Section,
Statutory Notes and Related Subsidiaries
Effective Date of Repeal
Repeal effective Jan. 1, 1987, see section 511(c) of
§9654. Applicability of Federal water pollution control funding, etc., provisions
(a) Omitted
(b) One-half of the unobligated balance remaining before December 11, 1980, under subsection (k) 1 of
(c) In any case in which any provision of
(
Editorial Notes
References in Text
Subsection (k) of
Subchapter II of this chapter, referred to in subsec. (b), was in the original "title II of this Act", meaning title II of
This chapter, referred to in subsec. (c), was in the original "this Act", meaning
Codification
Subsec. (a) of this section repealed
1 See References in Text note below.
§9655. Legislative veto of rule or regulation
(a) Transmission to Congress upon promulgation or repromulgation of rule or regulation; disapproval procedures
Notwithstanding any other provision of law, simultaneously with promulgation or repromulgation of any rule or regulation under authority of subchapter I of this chapter, the head of the department, agency, or instrumentality promulgating such rule or regulation shall transmit a copy thereof to the Secretary of the Senate and the Clerk of the House of Representatives. Except as provided in subsection (b) of this section, the rule or regulation shall not become effective, if—
(1) within ninety calendar days of continuous session of Congress after the date of promulgation, both Houses of Congress adopt a concurrent resolution, the matter after the resolving clause of which is as follows: "That Congress disapproves the rule or regulation promulgated by the dealing with the matter of , which rule or regulation was transmitted to Congress on .", the blank spaces therein being appropriately filled; or
(2) within sixty calendar days of continuous session of Congress after the date of promulgation, one House of Congress adopts such a concurrent resolution and transmits such resolution to the other House, and such resolution is not disapproved by such other House within thirty calendar days of continuous session of Congress after such transmittal.
(b) Approval; effective dates
If, at the end of sixty calendar days of continuous session of Congress after the date of promulgation of a rule or regulation, no committee of either House of Congress has reported or been discharged from further consideration of a concurrent resolution disapproving the rule or regulation and neither House has adopted such a resolution, the rule or regulation may go into effect immediately. If, within such sixty calendar days, such a committee has reported or been discharged from further consideration of such a resolution, or either House has adopted such a resolution, the rule or regulation may go into effect not sooner than ninety calendar days of continuous session of Congress after such rule is prescribed unless disapproved as provided in subsection (a) of this section.
(c) Sessions of Congress as applicable
For purposes of subsections (a) and (b) of this section—
(1) continuity of session is broken only by an adjournment of Congress sine die; and
(2) the days on which either House is not in session because of an adjournment of more than three days to a day certain are excluded in the computation of thirty, sixty, and ninety calendar days of continuous session of Congress.
(d) Congressional inaction on, or rejection of, resolution of disapproval
Congressional inaction on, or rejection of, a resolution of disapproval shall not be deemed an expression of approval of such rule or regulation.
(
§9656. Transportation of hazardous substances; listing as hazardous material; liability for release
(a) Each hazardous substance which is listed or designated as provided in
(b) A common or contract carrier shall be liable under other law in lieu of
(
Editorial Notes
Codification
In subsecs. (a) and (b), "
Amendments
1986—Subsec. (a).
Subsec. (b).
§9657. Separability; contribution
If any provision of this chapter, or the application of any provision of this chapter to any person or circumstance, is held invalid, the application of such provision to other persons or circumstances and the remainder of this chapter shall not be affected thereby. If an administrative settlement under
(
Editorial Notes
References in Text
This chapter, referred to in text, was in the original "this Act", meaning
Amendments
1986—
§9658. Actions under State law for damages from exposure to hazardous substances
(a) State statutes of limitations for hazardous substance cases
(1) Exception to State statutes
In the case of any action brought under State law for personal injury, or property damages, which are caused or contributed to by exposure to any hazardous substance, or pollutant or contaminant, released into the environment from a facility, if the applicable limitations period for such action (as specified in the State statute of limitations or under common law) provides a commencement date which is earlier than the federally required commencement date, such period shall commence at the federally required commencement date in lieu of the date specified in such State statute.
(2) State law generally applicable
Except as provided in paragraph (1), the statute of limitations established under State law shall apply in all actions brought under State law for personal injury, or property damages, which are caused or contributed to by exposure to any hazardous substance, or pollutant or contaminant, released into the environment from a facility.
(3) Actions under section 9607
Nothing in this section shall apply with respect to any cause of action brought under
(b) Definitions
As used in this section—
(1) Subchapter I terms
The terms used in this section shall have the same meaning as when used in subchapter I of this chapter.
(2) Applicable limitations period
The term "applicable limitations period" means the period specified in a statute of limitations during which a civil action referred to in subsection (a)(1) may be brought.
(3) Commencement date
The term "commencement date" means the date specified in a statute of limitations as the beginning of the applicable limitations period.
(4) Federally required commencement date
(A) In general
Except as provided in subparagraph (B), the term "federally required commencement date" means the date the plaintiff knew (or reasonably should have known) that the personal injury or property damages referred to in subsection (a)(1) were caused or contributed to by the hazardous substance or pollutant or contaminant concerned.
(B) Special rules
In the case of a minor or incompetent plaintiff, the term "federally required commencement date" means the later of the date referred to in subparagraph (A) or the following:
(i) In the case of a minor, the date on which the minor reaches the age of majority, as determined by State law, or has a legal representative appointed.
(ii) In the case of an incompetent individual, the date on which such individual becomes competent or has had a legal representative appointed.
(
Statutory Notes and Related Subsidiaries
Effective Date
§9659. Citizens suits
(a) Authority to bring civil actions
Except as provided in subsections (d) and (e) of this section and in
(1) against any person (including the United States and any other governmental instrumentality or agency, to the extent permitted by the eleventh amendment to the Constitution) who is alleged to be in violation of any standard, regulation, condition, requirement, or order which has become effective pursuant to this chapter (including any provision of an agreement under
(2) against the President or any other officer of the United States (including the Administrator of the Environmental Protection Agency and the Administrator of the ATSDR) where there is alleged a failure of the President or of such other officer to perform any act or duty under this chapter, including an act or duty under
Paragraph (2) shall not apply to any act or duty under the provisions of
(b) Venue
(1) Actions under subsection (a)(1)
Any action under subsection (a)(1) shall be brought in the district court for the district in which the alleged violation occurred.
(2) Actions under subsection (a)(2)
Any action brought under subsection (a)(2) may be brought in the United States District Court for the District of Columbia.
(c) Relief
The district court shall have jurisdiction in actions brought under subsection (a)(1) to enforce the standard, regulation, condition, requirement, or order concerned (including any provision of an agreement under
(d) Rules applicable to subsection (a)(1) actions
(1) Notice
No action may be commenced under subsection (a)(1) before 60 days after the plaintiff has given notice of the violation to each of the following:
(A) The President.
(B) The State in which the alleged violation occurs.
(C) Any alleged violator of the standard, regulation, condition, requirement, or order concerned (including any provision of an agreement under
Notice under this paragraph shall be given in such manner as the President shall prescribe by regulation.
(2) Diligent prosecution
No action may be commenced under paragraph (1) of subsection (a) if the President has commenced and is diligently prosecuting an action under this chapter, or under the Solid Waste Disposal Act [
(e) Rules applicable to subsection (a)(2) actions
No action may be commenced under paragraph (2) of subsection (a) before the 60th day following the date on which the plaintiff gives notice to the Administrator or other department, agency, or instrumentality that the plaintiff will commence such action. Notice under this subsection shall be given in such manner as the President shall prescribe by regulation.
(f) Costs
The court, in issuing any final order in any action brought pursuant to this section, may award costs of litigation (including reasonable attorney and expert witness fees) to the prevailing or the substantially prevailing party whenever the court determines such an award is appropriate. The court may, if a temporary restraining order or preliminary injunction is sought, require the filing of a bond or equivalent security in accordance with the Federal Rules of Civil Procedure.
(g) Intervention
In any action under this section, the United States or the State, or both, if not a party may intervene as a matter of right. For other provisions regarding intervention, see
(h) Other rights
This chapter does not affect or otherwise impair the rights of any person under Federal, State, or common law, except with respect to the timing of review as provided in
(i) Definitions
The terms used in this section shall have the same meanings as when used in subchapter I.
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (a), (d)(2), and (h), was in the original "this Act", meaning
The Solid Waste Disposal Act, referred to in subsec. (d)(2), is title II of
The Federal Rules of Civil Procedure, referred to in subsec. (f), are set out in the Appendix to Title 28, Judiciary and Judicial Procedure.
§9660. Research, development, and demonstration
(a) Hazardous substance research and training
(1) Authorities of Secretary
The Secretary of Health and Human Services (hereinafter in this subsection referred to as the Secretary), in consultation with the Administrator, shall establish and support a basic research and training program (through grants, cooperative agreements, and contracts) consisting of the following:
(A) Basic research (including epidemiologic and ecologic studies) which may include each of the following:
(i) Advanced techniques for the detection, assessment, and evaluation of the effects on human health of hazardous substances.
(ii) Methods to assess the risks to human health presented by hazardous substances.
(iii) Methods and technologies to detect hazardous substances in the environment and basic biological, chemical, and physical methods to reduce the amount and toxicity of hazardous substances.
(B) Training, which may include each of the following:
(i) Short courses and continuing education for State and local health and environment agency personnel and other personnel engaged in the handling of hazardous substances, in the management of facilities at which hazardous substances are located, and in the evaluation of the hazards to human health presented by such facilities.
(ii) Graduate or advanced training in environmental and occupational health and safety and in the public health and engineering aspects of hazardous waste control.
(iii) Graduate training in the geosciences, including hydrogeology, geological engineering, geophysics, geochemistry, and related fields necessary to meet professional personnel needs in the public and private sectors and to effectuate the purposes of this chapter.
(2) Director of NIEHS
The Director of the National Institute for Environmental Health Sciences shall cooperate fully with the relevant Federal agencies referred to in subparagraph (A) of paragraph (5) in carrying out the purposes of this section.
(3) Recipients of grants, etc.
A grant, cooperative agreement, or contract may be made or entered into under paragraph (1) with an accredited institution of higher education. The institution may carry out the research or training under the grant, cooperative agreement, or contract through contracts, including contracts with any of the following:
(A) Generators of hazardous wastes.
(B) Persons involved in the detection, assessment, evaluation, and treatment of hazardous substances.
(C) Owners and operators of facilities at which hazardous substances are located.
(D) State and local governments.
(4) Procedures
In making grants and entering into cooperative agreements and contracts under this subsection, the Secretary shall act through the Director of the National Institute for Environmental Health Sciences. In considering the allocation of funds for training purposes, the Director shall ensure that at least one grant, cooperative agreement, or contract shall be awarded for training described in each of clauses (i), (ii), and (iii) of paragraph (1)(B). Where applicable, the Director may choose to operate training activities in cooperation with the Director of the National Institute for Occupational Safety and Health. The procedures applicable to grants and contracts under title IV of the Public Health Service Act [
(5) Advisory council
To assist in the implementation of this subsection and to aid in the coordination of research and demonstration and training activities funded from the Fund under this section, the Secretary shall appoint an advisory council (hereinafter in this subsection referred to as the "Advisory Council") which shall consist of representatives of the following:
(A) The relevant Federal agencies.
(B) The chemical industry.
(C) The toxic waste management industry.
(D) Institutions of higher education.
(E) State and local health and environmental agencies.
(F) The general public.
(6) Planning
Within nine months after October 17, 1986, the Secretary, acting through the Director of the National Institute for Environmental Health Sciences, shall issue a plan for the implementation of paragraph (1). The plan shall include priorities for actions under paragraph (1) and include research and training relevant to scientific and technological issues resulting from site specific hazardous substance response experience. The Secretary shall, to the maximum extent practicable, take appropriate steps to coordinate program activities under this plan with the activities of other Federal agencies in order to avoid duplication of effort. The plan shall be consistent with the need for the development of new technologies for meeting the goals of response actions in accordance with the provisions of this chapter. The Advisory Council shall be provided an opportunity to review and comment on the plan and priorities and assist appropriate coordination among the relevant Federal agencies referred to in subparagraph (A) of paragraph (5).
(b) Alternative or innovative treatment technology research and demonstration program
(1) Establishment
The Administrator is authorized and directed to carry out a program of research, evaluation, testing, development, and demonstration of alternative or innovative treatment technologies (hereinafter in this subsection referred to as the "program") which may be utilized in response actions to achieve more permanent protection of human health and welfare and the environment.
(2) Administration
The program shall be administered by the Administrator, acting through an office of technology demonstration and shall be coordinated with programs carried out by the Office of Solid Waste and Emergency Response and the Office of Research and Development.
(3) Contracts and grants
In carrying out the program, the Administrator is authorized to enter into contracts and cooperative agreements with, and make grants to, persons, public entities, and nonprofit private entities which are exempt from tax under
(4) Use of sites
In carrying out the program, the Administrator may arrange for the use of sites at which a response may be undertaken under
(5) Demonstration assistance
(A) Program components
The demonstration assistance program shall include the following:
(i) The publication of a solicitation and the evaluation of applications for demonstration projects utilizing alternative or innovative technologies.
(ii) The selection of sites which are suitable for the testing and evaluation of innovative technologies.
(iii) The development of detailed plans for innovative technology demonstration projects.
(iv) The supervision of such demonstration projects and the providing of quality assurance for data obtained.
(v) The evaluation of the results of alternative innovative technology demonstration projects and the determination of whether or not the technologies used are effective and feasible.
(B) Solicitation
Within 90 days after October 17, 1986, and no less often than once every 12 months thereafter, the Administrator shall publish a solicitation for innovative or alternative technologies at a stage of development suitable for full-scale demonstrations at sites at which a response action may be undertaken under
(C) Applications
Any person and any public or private nonprofit entity may submit an application to the Administrator in response to the solicitation. The application shall contain a proposed demonstration plan setting forth how and when the project is to be carried out and such other information as the Administrator may require.
(D) Project selection
In selecting technologies to be demonstrated, the Administrator shall fully review the applications submitted and shall consider at least the criteria specified in paragraph (7). The Administrator shall select or refuse to select a project for demonstration under this subsection within 90 days of receiving the completed application for such project. In the case of a refusal to select the project, the Administrator shall notify the applicant within such 90-day period of the reasons for his refusal.
(E) Site selection
The Administrator shall propose 10 sites at which a response may be undertaken under
(F) Demonstration plan
Within 60 days after the selection of the site under this paragraph to be the location of a demonstration project, the Administrator shall establish a final demonstration plan for the project, based upon the demonstration plan contained in the application for the project. Such plan shall clearly set forth how and when the demonstration project will be carried out.
(G) Supervision and testing
Each demonstration project under this subsection shall be performed by the applicant, or by a person satisfactory to the applicant, under the supervision of the Administrator. The Administrator shall enter into a written agreement with each applicant granting the Administrator the responsibility and authority for testing procedures, quality control, monitoring, and other measurements necessary to determine and evaluate the results of the demonstration project. The Administrator may pay the costs of testing, monitoring, quality control, and other measurements required by the Administrator to determine and evaluate the results of the demonstration project, and the limitations established by subparagraph (J) shall not apply to such costs.
(H) Project completion
Each demonstration project under this subsection shall be completed within such time as is established in the demonstration plan.
(I) Extensions
The Administrator may extend any deadline established under this paragraph by mutual agreement with the applicant concerned.
(J) Funding restrictions
The Administrator shall not provide any Federal assistance for any part of a full-scale field demonstration project under this subsection to any applicant unless such applicant can demonstrate that it cannot obtain appropriate private financing on reasonable terms and conditions sufficient to carry out such demonstration project without such Federal assistance. The total Federal funds for any full-scale field demonstration project under this subsection shall not exceed 50 percent of the total cost of such project estimated at the time of the award of such assistance. The Administrator shall not expend more than $10,000,000 for assistance under the program in any fiscal year and shall not expend more than $3,000,000 for any single project.
(6) Field demonstrations
In carrying out the program, the Administrator shall initiate or cause to be initiated at least 10 field demonstration projects of alternative or innovative treatment technologies at sites at which a response may be undertaken under
(7) Criteria
In selecting technologies to be demonstrated under this subsection, the Administrator shall, consistent with the protection of human health and the environment, consider each of the following criteria:
(A) The potential for contributing to solutions to those waste problems which pose the greatest threat to human health, which cannot be adequately controlled under present technologies, or which otherwise pose significant management difficulties.
(B) The availability of technologies which have been sufficiently developed for field demonstration and which are likely to be cost-effective and reliable.
(C) The availability and suitability of sites for demonstrating such technologies, taking into account the physical, biological, chemical, and geological characteristics of the sites, the extent and type of contamination found at the site, and the capability to conduct demonstration projects in such a manner as to assure the protection of human health and the environment.
(D) The likelihood that the data to be generated from the demonstration project at the site will be applicable to other sites.
(8) Technology transfer
In carrying out the program, the Administrator shall conduct a technology transfer program including the development, collection, evaluation, coordination, and dissemination of information relating to the utilization of alternative or innovative treatment technologies for response actions. The Administrator shall establish and maintain a central reference library for such information. The information maintained by the Administrator shall be made available to the public, subject to the provisions of
(A) trade secrets; or
(B) other proprietary information of such person,
the Administrator shall not disclose such information and disclosure thereof shall be punishable under
(9) Training
The Administrator is authorized and directed to carry out, through the Office of Technology Demonstration, a program of training and an evaluation of training needs for each of the following:
(A) Training in the procedures for the handling and removal of hazardous substances for employees who handle hazardous substances.
(B) Training in the management of facilities at which hazardous substances are located and in the evaluation of the hazards to human health presented by such facilities for State and local health and environment agency personnel.
(10) Definition
For purposes of this subsection, the term "alternative or innovative treatment technologies" means those technologies, including proprietary or patented methods, which permanently alter the composition of hazardous waste through chemical, biological, or physical means so as to significantly reduce the toxicity, mobility, or volume (or any combination thereof) of the hazardous waste or contaminated materials being treated. The term also includes technologies that characterize or assess the extent of contamination, the chemical and physical character of the contaminants, and the stresses imposed by the contaminants on complex ecosystems at sites.
(c) Hazardous substance research
The Administrator may conduct and support, through grants, cooperative agreements, and contracts, research with respect to the detection, assessment, and evaluation of the effects on and risks to human health of hazardous substances and detection of hazardous substances in the environment. The Administrator shall coordinate such research with the Secretary of Health and Human Services, acting through the advisory council established under this section, in order to avoid duplication of effort.
(d) University hazardous substance research centers
(1) Grant program
The Administrator shall make grants to institutions of higher learning to establish and operate not fewer than 5 hazardous substance research centers in the United States. In carrying out the program under this subsection, the Administrator should seek to have established and operated 10 hazardous substance research centers in the United States.
(2) Responsibilities of centers
The responsibilities of each hazardous substance research center established under this subsection shall include, but not be limited to, the conduct of research and training relating to the manufacture, use, transportation, disposal, and management of hazardous substances and publication and dissemination of the results of such research.
(3) Applications
Any institution of higher learning interested in receiving a grant under this subsection shall submit to the Administrator an application in such form and containing such information as the Administrator may require by regulation.
(4) Selection criteria
The Administrator shall select recipients of grants under this subsection on the basis of the following criteria:
(A) The hazardous substance research center shall be located in a State which is representative of the needs of the region in which such State is located for improved hazardous waste management.
(B) The grant recipient shall be located in an area which has experienced problems with hazardous substance management.
(C) There is available to the grant recipient for carrying out this subsection demonstrated research resources.
(D) The capability of the grant recipient to provide leadership in making national and regional contributions to the solution of both long-range and immediate hazardous substance management problems.
(E) The grant recipient shall make a commitment to support ongoing hazardous substance research programs with budgeted institutional funds of at least $100,000 per year.
(F) The grant recipient shall have an interdisciplinary staff with demonstrated expertise in hazardous substance management and research.
(G) The grant recipient shall have a demonstrated ability to disseminate results of hazardous substance research and educational programs through an interdisciplinary continuing education program.
(H) The projects which the grant recipient proposes to carry out under the grant are necessary and appropriate.
(5) Maintenance of effort
No grant may be made under this subsection in any fiscal year unless the recipient of such grant enters into such agreements with the Administrator as the Administrator may require to ensure that such recipient will maintain its aggregate expenditures from all other sources for establishing and operating a regional hazardous substance research center and related research activities at or above the average level of such expenditures in its 2 fiscal years preceding October 17, 1986.
(6) Federal share
The Federal share of a grant under this subsection shall not exceed 80 percent of the costs of establishing and operating the regional hazardous substance research center and related research activities carried out by the grant recipient.
(7) Limitation on use of funds
No funds made available to carry out this subsection shall be used for acquisition of real property (including buildings) or construction of any building.
(8) Administration through the Office of the Administrator
Administrative responsibility for carrying out this subsection shall be in the Office of the Administrator.
(9) Equitable distribution of funds
The Administrator shall allocate funds made available to carry out this subsection equitably among the regions of the United States.
(10) Technology transfer activities
Not less than five percent of the funds made available to carry out this subsection for any fiscal year shall be available to carry out technology transfer activities.
(e) Report to Congress
At the time of the submission of the annual budget request to Congress, the Administrator shall submit to the appropriate committees of the House of Representatives and the Senate and to the advisory council established under subsection (a), a report on the progress of the research, development, and demonstration program authorized by subsection (b), including an evaluation of each demonstration project completed in the preceding fiscal year, findings with respect to the efficacy of such demonstrated technologies in achieving permanent and significant reductions in risk from hazardous wastes, the costs of such demonstration projects, and the potential applicability of, and projected costs for, such technologies at other hazardous substance sites.
(f) Saving provision
Nothing in this section shall be construed to affect the provisions of the Solid Waste Disposal Act [
(g) Small business participation
The Administrator shall ensure, to the maximum extent practicable, an adequate opportunity for small business participation in the program established by subsection (b).
(
Editorial Notes
References in Text
This chapter, referred to in subsec. (a)(1)(B)(iii), (6), was in the original "this Act", meaning
The Public Health Service Act, referred to in subsec. (a)(4), is act July 1, 1944, ch. 373,
The Solid Waste Disposal Act, referred to in subsec. (f), is title II of
Amendments
1986—Subsec. (b)(3).
Statutory Notes and Related Subsidiaries
Methamphetamine Remediation Research
"SECTION 1. SHORT TITLE.
"This Act may be cited as the 'Methamphetamine Remediation Research Act of 2007'.
"SEC. 2. FINDINGS.
"The Congress finds the following:
"(1) Methamphetamine use and production is growing rapidly throughout the United States.
"(2) Materials and residues remaining from the production of methamphetamine pose novel environmental problems in locations where methamphetamine laboratories have been closed.
"(3) There has been little standardization of measures for determining when the site of a closed methamphetamine laboratory has been successfully remediated.
"(4) Initial cleanup actions are generally limited to removal of hazardous substances and contaminated materials that pose an immediate threat to public health or the environment. It is not uncommon for significant levels of contamination to be found throughout residential structures after a methamphetamine laboratory has closed, partially because of a lack of knowledge of how to achieve an effective cleanup.
"(5) Data on methamphetamine laboratory-related contaminants of concern are very limited, and cleanup standards do not currently exist. In addition, procedures for sampling and analysis of contaminants need to be researched and developed.
"(6) Many States are struggling with establishing remediation guidelines and programs to address the rapidly expanding number of methamphetamine laboratories being closed each year.
"SEC. 3. VOLUNTARY GUIDELINES.
"(a)
"(b)
"(1) relevant standards, guidelines, and requirements found in Federal, State, and local laws and regulations;
"(2) the varying types and locations of former methamphetamine laboratories; and
"(3) the expected cost of carrying out any proposed guidelines.
"(c)
"(d)
"SEC. 4. RESEARCH PROGRAM.
"The Administrator shall establish a program of research to support the development and revision of the voluntary guidelines described in section 3. Such research shall—
"(1) identify methamphetamine laboratory-related chemicals of concern;
"(2) assess the types and levels of exposure to chemicals of concern identified under paragraph (1), including routine and accidental exposures, that may present a significant risk of adverse biological effects, and the research necessary to better address biological effects and to minimize adverse human exposures;
"(3) evaluate the performance of various methamphetamine laboratory cleanup and remediation techniques; and
"(4) support other research priorities identified by the Administrator in consultation with States and other interested parties.
"SEC. 5. TECHNOLOGY TRANSFER CONFERENCE.
"(a)
"(b)
"SEC. 6. RESIDUAL EFFECTS STUDY.
"(a)
"(1) the residents of buildings where such laboratories are, or were, located, with particular emphasis given to biological impacts on children; and
"(2) first responders.
"(b)
"SEC. 7. METHAMPHETAMINE DETECTION RESEARCH AND DEVELOPMENT PROGRAM.
"The Director of National Institute of Standards and Technology, in consultation with the Administrator, shall support a research program to develop—
"(1) new methamphetamine detection technologies, with emphasis on field test kits and site detection; and
"(2) appropriate standard reference materials and validation procedures for methamphetamine detection testing.
"SEC. 8. SAVINGS CLAUSE.
"Nothing in this Act shall be construed to affect or limit the application of, or any obligation to comply with, any State or Federal environmental law or regulation, including the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (
"SEC. 9. AUTHORIZATION OF APPROPRIATIONS.
"(a)
"(b)
Gulf Coast Hazardous Substance Research, Development, and Demonstration Center
"(1)
"(2)
"(3)
"(B) The Center shall be authorized to make grants, accept contributions, and enter into agreements with universities located in the States of Texas, Louisiana, Mississippi, Alabama, and Florida in order to carry out the purposes of the Center.
"(4)
Pacific Northwest Hazardous Substance Research, Development, and Demonstration Center
"(1)
"(2)
"(3)
"(A)
"(B)
"(4)
"(A)
"(B)
"(5)
Congressional Statement of Purpose
"(1) To establish a comprehensive and coordinated Federal program of research, development, demonstration, and training for the purpose of promoting the development of alternative and innovative treatment technologies that can be used in response actions under the CERCLA program, to provide incentives for the development and use of such technologies, and to improve the scientific capability to assess, detect and evaluate the effects on and risks to human health from hazardous substances.
"(2) To establish a basic university research and education program within the Department of Health and Human Services and a research, demonstration, and training program within the Environmental Protection Agency.
"(3) To reserve certain funds from the Hazardous Substance Trust Fund to support a basic research program within the Department of Health and Human Services, and an applied and developmental research program within the Environmental Protection Agency.
"(4) To enhance the Environmental Protection Agency's internal research capabilities related to CERCLA activities, including site assessment and technology evaluation.
"(5) To provide incentives for the development of alternative and innovative treatment technologies in a manner that supplements or coordinates with, but does not compete with or duplicate, private sector development of such technologies."
Termination of Advisory Councils
Advisory councils established after Jan. 5, 1973, to terminate not later than the expiration of the 2-year period beginning on the date of their establishment, unless, in the case of a council established by the President or an officer of the Federal Government, such council is renewed by appropriate action prior to the expiration of such 2-year period, or in the case of a council established by the Congress, its duration is otherwise provided by law. See
§9660a. Grant program
(1) Grant purposes
Grants for the training and education of workers who are or may be engaged in activities related to hazardous waste removal or containment or emergency response may be made under this section.
(2) Administration
Grants under this section shall be administered by the National Institute of Environmental Health Sciences.
(3) Grant recipients
Grants shall be awarded to nonprofit organizations which demonstrate experience in implementing and operating worker health and safety training and education programs and demonstrate the ability to reach and involve in training programs target populations of workers who are or will be engaged in hazardous waste removal or containment or emergency response operations.
(
Editorial Notes
Codification
Section was enacted as part of the Superfund Amendments and Reauthorization Act of 1986, and not as part of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 which comprises this chapter.
§9661. Love Canal property acquisition
(a) Acquisition of property in Emergency Declaration Area
The Administrator of the Environmental Protection Agency (hereinafter referred to as the "Administrator") may make grants not to exceed $2,500,000 to the State of New York (or to any duly constituted public agency or authority thereof) for purposes of acquisition of private property in the Love Canal Emergency Declaration Area. Such acquisition shall include (but shall not be limited to) all private property within the Emergency Declaration Area, including non-owner occupied residential properties, commercial, industrial, public, religious, non-profit, and vacant properties.
(b) Procedures for acquisition
No property shall be acquired pursuant to this section unless the property owner voluntarily agrees to such acquisition. Compensation for any property acquired pursuant to this section shall be based upon the fair market value of the property as it existed prior to the emergency declaration. Valuation procedures for property acquired with funds provided under this section shall be in accordance with those set forth in the agreement entered into between the New York State Disaster Preparedness Commission and the Love Canal Revitalization Agency on October 9, 1980.
(c) State ownership
The Administrator shall not provide any funds under this section for the acquisition of any properties pursuant to this section unless a public agency or authority of the State of New York first enters into a cooperative agreement with the Administrator providing assurances deemed adequate by the Administrator that the State or an agency created under the laws of the State shall take title to the properties to be so acquired.
(d) Maintenance of property
The Administrator shall enter into a cooperative agreement with an appropriate public agency or authority of the State of New York under which the Administrator shall maintain or arrange for the maintenance of all properties within the Emergency Declaration Area that have been acquired by any public agency or authority of the State. Ninety (90) percent of the costs of such maintenance shall be paid by the Administrator. The remaining portion of such costs shall be paid by the State (unless a credit is available under
(e) Habitability and land use study
The Administrator shall conduct or cause to be conducted a habitability and land-use study. The study shall—
(1) assess the risks associated with inhabiting of the Love Canal Emergency Declaration Area;
(2) compare the level of hazardous waste contamination in that Area to that present in other comparable communities; and
(3) assess the potential uses of the land within the Emergency Declaration Area, including but not limited to residential, industrial, commercial and recreational, and the risks associated with such potential uses.
The Administrator shall publish the findings of such study and shall work with the State of New York to develop recommendations based upon the results of such study.
(f) Funding
For purposes of
(g) Response
The provisions of this section shall not affect the implementation of other response actions within the Emergency Declaration Area that the Administrator has determined (before October 17, 1986) to be necessary to protect the public health or welfare or the environment.
(h) Definitions
For purposes of this section:
(1) Emergency Declaration Area
The terms "Emergency Declaration Area" and "Love Canal Emergency Declaration Area" mean the Emergency Declaration Area as defined in section 950, paragraph (2) of the General Municipal Law of the State of New York,
(2) Private property
As used in subsection (a), the term "private property" means all property which is not owned by a department, agency, or instrumentality of—
(A) the United States, or
(B) the State of New York (or any public agency or authority thereof).
(
Editorial Notes
References in Text
Statutory Notes and Related Subsidiaries
Love Canal Property Acquisition; Congressional Findings
"(1) The area known as Love Canal located in the city of Niagara Falls and the town of Wheatfield, New York, was the first toxic waste site to receive national attention. As a result of that attention Congress investigated the problems associated with toxic waste sites and enacted CERCLA [Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (
"(2) Because Love Canal came to the Nation's attention prior to the passage of CERCLA and because the fund under CERCLA was not available to compensate for all of the hardships endured by the citizens in the area, Congress has determined that special provisions are required. These provisions do not affect the lawfulness, implementation, or selection of any other response actions at Love Canal or at any other facilities."
Coordination of Titles I to IV of Pub. L. 99–499
Any provision of titles I to IV of
1 See References in Text note below.
§9662. Limitation on contract and borrowing authority
Any authority provided by this Act, including any amendment made by this Act, to enter into contracts to obligate the United States or to incur indebtedness for the repayment of which the United States is liable shall be effective only to such extent or in such amounts as are provided in appropriation Acts.
(
Editorial Notes
References in Text
This Act, referred to in text, is
Codification
Section was enacted as part of the Superfund Amendments and Reauthorization Act of 1986, and not as part of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 which comprises this chapter.
SUBCHAPTER IV—POLLUTION INSURANCE
§9671. Definitions
As used in this subchapter—
(1) Insurance
The term "insurance" means primary insurance, excess insurance, reinsurance, surplus lines insurance, and any other arrangement for shifting and distributing risk which is determined to be insurance under applicable State or Federal law.
(2) Pollution liability
The term "pollution liability" means liability for injuries arising from the release of hazardous substances or pollutants or contaminants.
(3) Risk retention group
The term "risk retention group" means any corporation or other limited liability association taxable as a corporation, or as an insurance company, formed under the laws of any State—
(A) whose primary activity consists of assuming and spreading all, or any portion, of the pollution liability of its group members;
(B) which is organized for the primary purpose of conducting the activity described under subparagraph (A);
(C) which is chartered or licensed as an insurance company and authorized to engage in the business of insurance under the laws of any State; and
(D) which does not exclude any person from membership in the group solely to provide for members of such a group a competitive advantage over such a person.
(4) Purchasing group
The term "purchasing group" means any group of persons which has as one of its purposes the purchase of pollution liability insurance on a group basis.
(5) State
The term "State" means any State of the United States, the District of Columbia, the Commonwealth of Puerto Rico, Guam, American Samoa, the Virgin Islands, the Commonwealth of the Northern Marianas, and any other territory or possession over which the United States has jurisdiction.
(
Statutory Notes and Related Subsidiaries
State Powers and Authorities Under Risk Retention Amendments of 1986
§9672. State laws; scope of subchapter
(a) State laws
Nothing in this subchapter shall be construed to affect either the tort law or the law governing the interpretation of insurance contracts of any State. The definitions of pollution liability and pollution liability insurance under any State law shall not be applied for the purposes of this subchapter, including recognition or qualification of risk retention groups or purchasing groups.
(b) Scope of subchapter
The authority to offer or to provide insurance under this subchapter shall be limited to coverage of pollution liability risks and this subchapter does not authorize a risk retention group or purchasing group to provide coverage of any other line of insurance.
(
§9673. Risk retention groups
(a) Exemption
Except as provided in this section, a risk retention group shall be exempt from the following:
(1) A State law, rule, or order which makes unlawful, or regulates, directly or indirectly, the operation of a risk retention group.
(2) A State law, rule, or order which requires or permits a risk retention group to participate in any insurance insolvency guaranty association to which an insurer licensed in the State is required to belong.
(3) A State law, rule, or order which requires any insurance policy issued to a risk retention group or any member of the group to be countersigned by an insurance agent or broker residing in the State.
(4) A State law, rule, or order which otherwise discriminates against a risk retention group or any of its members.
(b) Exceptions
(1) State laws generally applicable
Nothing in subsection (a) shall be construed to affect the applicability of State laws generally applicable to persons or corporations. The State in which a risk retention group is chartered may regulate the formation and operation of the group.
(2) State regulations not subject to exemption
Subsection (a) shall not apply to any State law which requires a risk retention group to do any of the following:
(A) Comply with the unfair claim settlement practices law of the State.
(B) Pay, on a nondiscriminatory basis, applicable premium and other taxes which are levied on admitted insurers and surplus line insurers, brokers, or policyholders under the laws of the State.
(C) Participate, on a nondiscriminatory basis, in any mechanism established or authorized under the law of the State for the equitable apportionment among insurers of pollution liability insurance losses and expenses incurred on policies written through such mechanism.
(D) Submit to the appropriate authority reports and other information required of licensed insurers under the laws of a State relating solely to pollution liability insurance losses and expenses.
(E) Register with and designate the State insurance commissioner as its agent solely for the purpose of receiving service of legal documents or process.
(F) Furnish, upon request, such commissioner a copy of any financial report submitted by the risk retention group to the commissioner of the chartering or licensing jurisdiction.
(G) Submit to an examination by the State insurance commissioner in any State in which the group is doing business to determine the group's financial condition, if—
(i) the commissioner has reason to believe the risk retention group is in a financially impaired condition; and
(ii) the commissioner of the jurisdiction in which the group is chartered has not begun or has refused to initiate an examination of the group.
(H) Comply with a lawful order issued in a delinquency proceeding commenced by the State insurance commissioner if the commissioner of the jurisdiction in which the group is chartered has failed to initiate such a proceeding after notice of a finding of financial impairment under subparagraph (G).
(c) Application of exemptions
The exemptions specified in subsection (a) apply to—
(1) pollution liability insurance coverage provided by a risk retention group for—
(A) such group; or
(B) any person who is a member of such group;
(2) the sale of pollution liability insurance coverage for a risk retention group; and
(3) the provision of insurance related services or management services for a risk retention group or any member of such a group.
(d) Agents or brokers
A State may require that a person acting, or offering to act, as an agent or broker for a risk retention group obtain a license from that State, except that a State may not impose any qualification or requirement which discriminates against a nonresident agent or broker.
(
§9674. Purchasing groups
(a) Exemption
Except as provided in this section, a purchasing group is exempt from the following:
(1) A State law, rule, or order which prohibits the establishment of a purchasing group.
(2) A State law, rule, or order which makes it unlawful for an insurer to provide or offer to provide insurance on a basis providing, to a purchasing group or its member, advantages, based on their loss and expense experience, not afforded to other persons with respect to rates, policy forms, coverages, or other matters.
(3) A State law, rule, or order which prohibits a purchasing group or its members from purchasing insurance on the group basis described in paragraph (2) of this subsection.
(4) A State law, rule, or order which prohibits a purchasing group from obtaining insurance on a group basis because the group has not been in existence for a minimum period of time or because any member has not belonged to the group for a minimum period of time.
(5) A State law, rule, or order which requires that a purchasing group must have a minimum number of members, common ownership or affiliation, or a certain legal form.
(6) A State law, rule, or order which requires that a certain percentage of a purchasing group must obtain insurance on a group basis.
(7) A State law, rule, or order which requires that any insurance policy issued to a purchasing group or any members of the group be countersigned by an insurance agent or broker residing in that State.
(8) A State law, rule, or order which otherwise discriminate 1 against a purchasing group or any of its members.
(b) Application of exemptions
The exemptions specified in subsection (a) apply to the following:
(1) Pollution liability insurance, and comprehensive general liability insurance which includes this coverage, provided to—
(A) a purchasing group; or
(B) any person who is a member of a purchasing group.
(2) The sale of any one of the following to a purchasing group or a member of the group:
(A) Pollution liability insurance and comprehensive general liability coverage.
(B) Insurance related services.
(C) Management services.
(c) Agents or brokers
A State may require that a person acting, or offering to act, as an agent or broker for a purchasing group obtain a license from that State, except that a State may not impose any qualification or requirement which discriminates against a nonresident agent or broker.
(
1 So in original. Probably should be "discriminates".
§9675. Applicability of securities laws
(a) Ownership interests
The ownership interests of members of a risk retention group shall be considered to be—
(1) exempted securities for purposes of
(2) securities for purposes of the provisions of
(b) Investment Company Act
A risk retention group shall not be considered to be an investment company for purposes of the Investment Company Act of 1940 (
(c) Blue sky law
The ownership interests of members in a risk retention group shall not be considered securities for purposes of any State blue sky law.
(
Editorial Notes
References in Text
The Investment Company Act of 1940, referred to in subsec. (b), is title I of act Aug. 22, 1940, ch. 686,