Part C—Monitored Retrievable Storage
§10161. Monitored retrievable storage
(a) Findings
The Congress finds that—
(1) long-term storage of high-level radioactive waste or spent nuclear fuel in monitored retrievable storage facilities is an option for providing safe and reliable management of such waste or spent fuel;
(2) the executive branch and the Congress should proceed as expeditiously as possible to consider fully a proposal for construction of one or more monitored retrievable storage facilities to provide such long-term storage;
(3) the Federal Government has the responsibility to ensure that site-specific designs for such facilities are available as provided in this section;
(4) the generators and owners of the high-level radioactive waste and spent nuclear fuel to be stored in such facilities have the responsibility to pay the costs of the long-term storage of such waste and spent fuel; and
(5) disposal of high-level radioactive waste and spent nuclear fuel in a repository developed under this chapter should proceed regardless of any construction of a monitored retrievable storage facility pursuant to this section.
(b) Submission of proposal by Secretary
(1) On or before June 1, 1985, the Secretary shall complete a detailed study of the need for and feasibility of, and shall submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high-level radioactive waste and spent nuclear fuel. Each such facility shall be designed—
(A) to accommodate spent nuclear fuel and high-level radioactive waste resulting from civilian nuclear activities;
(B) to permit continuous monitoring, management, and maintenance of such spent fuel and waste for the foreseeable future;
(C) to provide for the ready retrieval of such spent fuel and waste for further processing or disposal; and
(D) to safely store such spent fuel and waste as long as may be necessary by maintaining such facility through appropriate means, including any required replacement of such facility.
(2) Such proposal shall include—
(A) the establishment of a Federal program for the siting, development, construction, and operation of facilities capable of safely storing high-level radioactive waste and spent nuclear fuel, which facilities are to be licensed by the Commission;
(B) a plan for the funding of the construction and operation of such facilities, which plan shall provide that the costs of such activities shall be borne by the generators and owners of the high-level radioactive waste and spent nuclear fuel to be stored in such facilities;
(C) site-specific designs, specifications, and cost estimates sufficient to (i) solicit bids for the construction of the first such facility; (ii) support congressional authorization of the construction of such facility; and (iii) enable completion and operation of such facility as soon as practicable following congressional authorization of such facility; and
(D) a plan for integrating facilities constructed pursuant to this section with other storage and disposal facilities authorized in this chapter.
(3) In formulating such proposal, the Secretary shall consult with the Commission and the Administrator, and shall submit their comments on such proposal to the Congress at the time such proposal is submitted.
(4) The proposal shall include, for the first such facility, at least 3 alternative sites and at least 5 alternative combinations of such proposed sites and facility designs consistent with the criteria of paragraph (1). The Secretary shall recommend the combination among the alternatives that the Secretary deems preferable. The environmental assessment under subsection (c) shall include a full analysis of the relative advantages and disadvantages of all 5 such alternative combinations of proposed sites and proposed facility designs.
(c) Environmental impact statements
(1) Preparation and submission to the Congress of the proposal required in this section shall not require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (
(2) If the Congress by law, after review of the proposal submitted by the Secretary under subsection (b), specifically authorizes construction of a monitored retrievable storage facility, the requirements of the National Environmental Policy Act of 1969 (
(d) Licensing
Any facility authorized pursuant to this section shall be subject to licensing under
(e) Clarification
Nothing in this section limits the consideration of alternative facility designs consistent with the criteria of paragraph (b)(1) in any environmental impact statement, or in any licensing procedure of the Commission, with respect to any monitored, retrievable facility authorized pursuant to this section.
(f) Impact assistance
(1) Upon receipt by the Secretary of congressional authorization to construct a facility described in subsection (b), the Secretary shall commence making annual impact aid payments to appropriate units of general local government in order to mitigate any social or economic impacts resulting from the construction and subsequent operation of any such facility within the jurisdictional boundaries of any such unit.
(2) Payments made available to units of general local government under this subsection shall be—
(A) allocated in a fair and equitable manner, with priority given to units of general local government determined by the Secretary to be most severely affected; and
(B) utilized by units of general local government only for planning, construction, maintenance, and provision of public services related to the siting of such facility.
(3) Such payments shall be subject to such terms and conditions as the Secretary determines are necessary to ensure achievement of the purposes of this subsection. The Secretary shall issue such regulations as may be necessary to carry out the provisions of this subsection.
(4) Such payments shall be made available entirely from funds held in the Nuclear Waste Fund established in
(5) The Secretary may consult with appropriate units of general local government in advance of commencement of construction of any such facility in an effort to determine the level of payments each such unit is eligible to receive under this subsection.
(g) Limitation
No monitored retrievable storage facility developed pursuant to this section may be constructed in any State in which there is located any site approved for site characterization under
(h) Participation of States and Indian tribes
Any facility authorized pursuant to this section shall be subject to the provisions of
(
Editorial Notes
References in Text
The National Environmental Policy Act of 1969, referred to in subsec. (c), is
§10162. Authorization of monitored retrievable storage
(a) Nullification of Oak Ridge siting proposal
The proposal of the Secretary (EC–1022, 100th Congress) to locate a monitored retrievable storage facility at a site on the Clinch River in the Roane County portion of Oak Ridge, Tennessee, with alternative sites on the Oak Ridge Reservation of the Department of Energy and on the former site of a proposed nuclear powerplant in Hartsville, Tennessee, is annulled and revoked. In carrying out the provisions of
(b) Authorization
The Secretary is authorized to site, construct, and operate one monitored retrievable storage facility subject to the conditions described in
(
Editorial Notes
Codification
§10163. Monitored Retrievable Storage Commission
(a) 1 Establishment
(1)(A) There is established a Monitored Retrievable Storage Review Commission (hereinafter in this section referred to as the "MRS Commission"), that shall consist of 3 members who shall be appointed by and serve at the pleasure of the President pro tempore of the Senate and the Speaker of the House of Representatives.
(B) Members of the MRS Commission shall be appointed not later than 30 days after December 22, 1987, from among persons who as a result of training, experience and attainments are exceptionally well qualified to evaluate the need for a monitored retrievable storage facility as a part of the Nation's nuclear waste management system.
(C) The MRS Commission shall prepare a report on the need for a monitored retrievable storage facility as a part of a national nuclear waste management system that achieves the purposes of this chapter. In preparing the report under this subparagraph, the MRS Commission shall—
(i) review the status and adequacy of the Secretary's evaluation of the systems advantages and disadvantages of bringing such a facility into the national nuclear waste disposal system;
(ii) obtain comment and available data on monitored retrievable storage from affected parties, including States containing potentially acceptable sites;
(iii) evaluate the utility of a monitored retrievable storage facility from a technical perspective; and
(iv) make a recommendation to Congress as to whether such a facility should be included in the national nuclear waste management system in order to achieve the purposes of this chapter, including meeting needs for packaging and handling of spent nuclear fuel, improving the flexibility of the repository development schedule, and providing temporary storage of spent nuclear fuel accepted for disposal.
(2) In preparing the report and making its recommendation under paragraph (1) the MRS Commission shall compare such a facility to the alternative of at-reactor storage of spent nuclear fuel prior to disposal of such fuel in a repository under this chapter. Such comparison shall take into consideration the impact on—
(A) repository design and construction;
(B) waste package design, fabrication and standardization;
(C) waste preparation;
(D) waste transportation systems;
(E) the reliability of the national system for the disposal of radioactive waste;
(F) the ability of the Secretary to fulfill contractual commitments of the Department under this chapter to accept spent nuclear fuel for disposal; and
(G) economic factors, including the impact on the costs likely to be imposed on ratepayers of the Nation's electric utilities for temporary at-reactor storage of spent nuclear fuel prior to final disposal in a repository, as well as the costs likely to be imposed on ratepayers of the Nation's electric utilities in building and operating such a facility.
(3) The report under this subsection, together with the recommendation of the MRS Commission, shall be transmitted to Congress on November 1, 1989.
(4)(A)(i) Each member of the MRS Commission shall be paid at the rate provided for level III of the Executive Schedule for each day (including travel time) such member is engaged in the work of the MRS Commission, and shall receive travel expenses, including per diem in lieu of subsistence in the same manner as is permitted under
(ii) The MRS Commission may appoint and fix compensation, not to exceed the rate of basic pay payable for GS–18 of the General Schedule, for such staff as may be necessary to carry out its functions.
(B)(i) The MRS Commission may hold hearings, sit and act at such times and places, take such testimony and receive such evidence as the MRS Commission considers appropriate. Any member of the MRS Commission may administer oaths or affirmations to witnesses appearing before the MRS Commission.
(ii) The MRS Commission may request any Executive agency, including the Department, to furnish such assistance or information, including records, data, files, or documents, as the Commission considers necessary to carry out its functions. Unless prohibited by law, such agency shall promptly furnish such assistance or information.
(iii) To the extent permitted by law, the Administrator of the General Services Administration shall, upon request of the MRS Commission, provide the MRS Commission with necessary administrative services, facilities, and support on a reimbursable basis.
(iv) The MRS Commission may procure temporary and intermittent services from experts and consultants to the same extent as is authorized by
(C) The MRS Commission shall cease to exist 60 days after the submission to Congress of the report required under this subsection.
(
Editorial Notes
References in Text
Level III of the Executive Schedule, referred to in subsec. (a)(4)(A)(i), is set out in
Codification
Amendments
1988—Subsec. (a)(3).
Statutory Notes and Related Subsidiaries
References in Other Laws to GS–16, 17, or 18 Pay Rates
References in laws to the rates of pay for GS–16, 17, or 18, or to maximum rates of pay under the General Schedule, to be considered references to rates payable under specified sections of Title 5, Government Organization and Employees, see section 529 [title I, §101(c)(1)] of
1 So in original. No subsec. (b) has been enacted.
§10164. Survey
After the MRS Commission submits its report to the Congress under
(1) enhance the reliability and flexibility of the system for the disposal of spent nuclear fuel and high-level radioactive waste established under this chapter;
(2) minimize the impacts of transportation and handling of such fuel and waste;
(3) provide for public confidence in the ability of such system to safely dispose of the fuel and waste;
(4) impose minimal adverse effects on the local community and the local environment;
(5) provide a high probability that the facility will meet applicable environmental, health, and safety requirements in a timely fashion;
(6) provide such other benefits to the system for the disposal of spent nuclear fuel and high-level radioactive waste as the Secretary deems appropriate; and
(7) unduly burden a State in which significant volumes of high-level radioactive waste resulting from atomic energy defense activities are stored.
(
Editorial Notes
Codification
§10165. Site selection
(a) In general
The Secretary may select the site evaluated under
(b) Limitation
The Secretary may not select a site under subsection (a) until the Secretary recommends to the President the approval of a site for development as a repository under
(c) Site specific activities
The Secretary may conduct such site specific activities at each site surveyed under
(d) Environmental assessment
Site specific activities and selection of a site under this section shall not require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (
(e) Notification before selection
(1) At least 6 months before selecting a site under subsection (a), the Secretary shall notify the Governor and legislature of the State in which such site is located, or the governing body of the affected Indian tribe where such site is located, as the case may be, of such potential selection and the basis for such selection.
(2) Before selecting any site under subsection (a), the Secretary shall hold at least one public hearing in the vicinity of such site to solicit any recommendations of interested parties with respect to issues raised by the selection of such site.
(f) Notification of selection
The Secretary shall promptly notify Congress and the appropriate State or Indian tribe of the selection under subsection (a).
(g) Limitation
No monitored retrievable storage facility authorized pursuant to
(
Editorial Notes
References in Text
The National Environmental Policy Act of 1969, referred to in subsec. (d), is
Codification
§10166. Notice of disapproval
(a) In general
The selection of a site under
(b) References
For purposes of carrying out the provisions of this subsection,1 references in
(
Editorial Notes
Codification
1 So in original. Probably should be "section,".
§10167. Benefits agreement
Once selection of a site for a monitored retrievable storage facility is made by the Secretary under
(
Editorial Notes
Codification
§10168. Construction authorization
(a) Environmental impact statement
(1) Once the selection of a site is effective under
(2) Nothing in this section shall be construed to limit the consideration of alternative facility designs consistent with the criteria described in
(b) Application for construction license
Once the selection of a site for a monitored retrievable storage facility is effective under
(c) Licensing
Any monitored retrievable storage facility authorized pursuant to
(d) Licensing conditions
Any license issued by the Commission for a monitored retrievable storage facility under this section shall provide that—
(1) construction of such facility may not begin until the Commission has issued a license for the construction of a repository under section 10135(d) 1 of this title;
(2) construction of such facility or acceptance of spent nuclear fuel or high-level radioactive waste shall be prohibited during such time as the repository license is revoked by the Commission or construction of the repository ceases;
(3) the quantity of spent nuclear fuel or high-level radioactive waste at the site of such facility at any one time may not exceed 10,000 metric tons of heavy metal until a repository under this chapter first accepts spent nuclear fuel or solidified high-level radioactive waste; and
(4) the quantity of spent nuclear fuel or high-level radioactive waste at the site of such facility at any one time may not exceed 15,000 metric tons of heavy metal.
(
Editorial Notes
References in Text
The National Environmental Policy Act of 1969, referred to in subsec. (a)(1), is
Codification
1 So in original.
§10169. Financial assistance
The provisions of
(