42 USC CHAPTER 85, SUBCHAPTER I, Part D, subpart 4: additional provisions for particulate matter nonattainment areas
Result 1 of 1
   
 
42 USC CHAPTER 85, SUBCHAPTER I, Part D, subpart 4: additional provisions for particulate matter nonattainment areas
From Title 42—THE PUBLIC HEALTH AND WELFARECHAPTER 85—AIR POLLUTION PREVENTION AND CONTROLSUBCHAPTER I—PROGRAMS AND ACTIVITIESPart D—Plan Requirements for Nonattainment Areas

subpart 4—additional provisions for particulate matter nonattainment areas

§7513. Classifications and attainment dates

(a) Initial classifications

Every area designated nonattainment for PM–10 pursuant to section 7407(d) of this title shall be classified at the time of such designation, by operation of law, as a moderate PM–10 nonattainment area (also referred to in this subpart as a "Moderate Area") at the time of such designation. At the time of publication of the notice under section 7407(d)(4) of this title (relating to area designations) for each PM–10 nonattainment area, the Administrator shall publish a notice announcing the classification of such area. The provisions of section 7502(a)(1)(B) of this title (relating to lack of notice-and-comment and judicial review) shall apply with respect to such classification.

(b) Reclassification as Serious

(1) Reclassification before attainment date

The Administrator may reclassify as a Serious PM–10 nonattainment area (identified in this subpart also as a "Serious Area") any area that the Administrator determines cannot practicably attain the national ambient air quality standard for PM–10 by the attainment date (as prescribed in subsection (c)) for Moderate Areas. The Administrator shall reclassify appropriate areas as Serious by the following dates:

(A) For areas designated nonattainment for PM–10 under section 7407(d)(4) of this title, the Administrator shall propose to reclassify appropriate areas by June 30, 1991, and take final action by December 31, 1991.

(B) For areas subsequently designated nonattainment, the Administrator shall reclassify appropriate areas within 18 months after the required date for the State's submission of a SIP for the Moderate Area.

(2) Reclassification upon failure to attain

Within 6 months following the applicable attainment date for a PM–10 nonattainment area, the Administrator shall determine whether the area attained the standard by that date. If the Administrator finds that any Moderate Area is not in attainment after the applicable attainment date—

(A) the area shall be reclassified by operation of law as a Serious Area; and

(B) the Administrator shall publish a notice in the Federal Register no later than 6 months following the attainment date, identifying the area as having failed to attain and identifying the reclassification described under subparagraph (A).

(c) Attainment dates

Except as provided under subsection (d), the attainment dates for PM–10 nonattainment areas shall be as follows:

(1) Moderate Areas

For a Moderate Area, the attainment date shall be as expeditiously as practicable but no later than the end of the sixth calendar year after the area's designation as nonattainment, except that, for areas designated nonattainment for PM–10 under section 7407(d)(4) of this title, the attainment date shall not extend beyond December 31, 1994.

(2) Serious Areas

For a Serious Area, the attainment date shall be as expeditiously as practicable but no later than the end of the tenth calendar year beginning after the area's designation as nonattainment, except that, for areas designated nonattainment for PM–10 under section 7407(d)(4) of this title, the date shall not extend beyond December 31, 2001.

(d) Extension of attainment date for Moderate Areas

Upon application by any State, the Administrator may extend for 1 additional year (hereinafter referred to as the "Extension Year") the date specified in paragraph 1 (c)(1) if—

(1) the State has complied with all requirements and commitments pertaining to the area in the applicable implementation plan; and

(2) no more than one exceedance of the 24-hour national ambient air quality standard level for PM–10 has occurred in the area in the year preceding the Extension Year, and the annual mean concentration of PM–10 in the area for such year is less than or equal to the standard level.


No more than 2 one-year extensions may be issued under the subsection for a single nonattainment area.

(e) Extension of attainment date for Serious Areas

Upon application by any State, the Administrator may extend the attainment date for a Serious Area beyond the date specified under subsection (c), if attainment by the date established under subsection (c) would be impracticable, the State has complied with all requirements and commitments pertaining to that area in the implementation plan, and the State demonstrates to the satisfaction of the Administrator that the plan for that area includes the most stringent measures that are included in the implementation plan of any State or are achieved in practice in any State, and can feasibly be implemented in the area. At the time of such application, the State must submit a revision to the implementation plan that includes a demonstration of attainment by the most expeditious alternative date practicable. In determining whether to grant an extension, and the appropriate length of time for any such extension, the Administrator may consider the nature and extent of nonattainment, the types and numbers of sources or other emitting activities in the area (including the influence of uncontrollable natural sources and transboundary emissions from foreign countries), the population exposed to concentrations in excess of the standard, the presence and concentration of potentially toxic substances in the mix of particulate emissions in the area, and the technological and economic feasibility of various control measures. The Administrator may not approve an extension until the State submits an attainment demonstration for the area. The Administrator may grant at most one such extension for an area, of no more than 5 years.

(f) Waivers for certain areas

The Administrator may, on a case-by-case basis, waive any requirement applicable to any Serious Area under this subpart where the Administrator determines that anthropogenic sources of PM–10 do not contribute significantly to the violation of the PM–10 standard in the area. The Administrator may also waive a specific date for attainment of the standard where the Administrator determines that nonanthropogenic sources of PM–10 contribute significantly to the violation of the PM–10 standard in the area.

(July 14, 1955, ch. 360, title I, §188, as added Pub. L. 101–549, title I, §105(a), Nov. 15, 1990, 104 Stat. 2458.)

1 So in original. Probably should be "subsection".

§7513a. Plan provisions and schedules for plan submissions

(a) Moderate Areas

(1) Plan provisions

Each State in which all or part of a Moderate Area is located shall submit, according to the applicable schedule under paragraph (2), an implementation plan that includes each of the following:

(A) For the purpose of meeting the requirements of section 7502(c)(5) of this title, a permit program providing that permits meeting the requirements of section 7503 of this title are required for the construction and operation of new and modified major stationary sources of PM–10.

(B) Either (i) a demonstration (including air quality modeling) that the plan will provide for attainment by the applicable attainment date; or (ii) a demonstration that attainment by such date is impracticable.

(C) Provisions to assure that reasonably available control measures for the control of PM–10 shall be implemented no later than December 10, 1993, or 4 years after designation in the case of an area classified as moderate after November 15, 1990.

(2) Schedule for plan submissions

A State shall submit the plan required under subparagraph (1) no later than the following:

(A) Within 1 year of November 15, 1990, for areas designated nonattainment under section 7407(d)(4) of this title, except that the provision required under subparagraph (1)(A) shall be submitted no later than June 30, 1992.

(B) 18 months after the designation as nonattainment, for those areas designated nonattainment after the designations prescribed under section 7407(d)(4) of this title.

(b) Serious Areas

(1) Plan provisions

In addition to the provisions submitted to meet the requirements of paragraph 1 (a)(1) (relating to Moderate Areas), each State in which all or part of a Serious Area is located shall submit an implementation plan for such area that includes each of the following:

(A) A demonstration (including air quality modeling)—

(i) that the plan provides for attainment of the PM–10 national ambient air quality standard by the applicable attainment date, or

(ii) for any area for which the State is seeking, pursuant to section 7513(e) of this title, an extension of the attainment date beyond the date set forth in section 7513(c) of this title, that attainment by that date would be impracticable, and that the plan provides for attainment by the most expeditious alternative date practicable.


(B) Provisions to assure that the best available control measures for the control of PM–10 shall be implemented no later than 4 years after the date the area is classified (or reclassified) as a Serious Area.

(2) Schedule for plan submissions

A State shall submit the demonstration required for an area under paragraph (1)(A) no later than 4 years after reclassification of the area to Serious, except that for areas reclassified under section 7513(b)(2) of this title, the State shall submit the attainment demonstration within 18 months after reclassification to Serious. A State shall submit the provisions described under paragraph (1)(B) no later than 18 months after reclassification of the area as a Serious Area.

(3) Major sources

For any Serious Area, the terms "major source" and "major stationary source" include any stationary source or group of stationary sources located within a contiguous area and under common control that emits, or has the potential to emit, at least 70 tons per year of PM–10.

(c) Milestones

(1) Plan revisions demonstrating attainment submitted to the Administrator for approval under this subpart shall contain quantitative milestones which are to be achieved every 3 years until the area is redesignated attainment and which demonstrate reasonable further progress, as defined in section 7501(1) of this title, toward attainment by the applicable date.

(2) Not later than 90 days after the date on which a milestone applicable to the area occurs, each State in which all or part of such area is located shall submit to the Administrator a demonstration that all measures in the plan approved under this section have been implemented and that the milestone has been met. A demonstration under this subsection shall be submitted in such form and manner, and shall contain such information and analysis, as the Administrator shall require. The Administrator shall determine whether or not a State's demonstration under this subsection is adequate within 90 days after the Administrator's receipt of a demonstration which contains the information and analysis required by the Administrator.

(3) If a State fails to submit a demonstration under paragraph (2) with respect to a milestone within the required period or if the Administrator determines that the area has not met any applicable milestone, the Administrator shall require the State, within 9 months after such failure or determination to submit a plan revision that assures that the State will achieve the next milestone (or attain the national ambient air quality standard for PM–10, if there is no next milestone) by the applicable date.

(d) Failure to attain

In the case of a Serious PM–10 nonattainment area in which the PM–10 standard is not attained by the applicable attainment date, the State in which such area is located shall, after notice and opportunity for public comment, submit within 12 months after the applicable attainment date, plan revisions which provide for attainment of the PM–10 air quality standard and, from the date of such submission until attainment, for an annual reduction in PM–10 or PM–10 precursor emissions within the area of not less than 5 percent of the amount of such emissions as reported in the most recent inventory prepared for such area.

(e) PM–10 precursors

The control requirements applicable under plans in effect under this part for major stationary sources of PM–10 shall also apply to major stationary sources of PM–10 precursors, except where the Administrator determines that such sources do not contribute significantly to PM–10 levels which exceed the standard in the area. The Administrator shall issue guidelines regarding the application of the preceding sentence.

(July 14, 1955, ch. 360, title I, §189, as added Pub. L. 101–549, title I, §105(a), Nov. 15, 1990, 104 Stat. 2460.)

1 So in original. Probably should be "subsection".

§7513b. Issuance of RACM and BACM guidance

The Administrator shall issue, in the same manner and according to the same procedure as guidance is issued under section 7408(c) of this title, technical guidance on reasonably available control measures and best available control measures for urban fugitive dust, and emissions from residential wood combustion (including curtailments and exemptions from such curtailments) and prescribed silvicultural and agricultural burning, no later than 18 months following November 15, 1990. The Administrator shall also examine other categories of sources contributing to nonattainment of the PM–10 standard, and determine whether additional guidance on reasonably available control measures and best available control measures is needed, and issue any such guidance no later than 3 years after November 15, 1990. In issuing guidelines and making determinations under this section, the Administrator (in consultation with the State) shall take into account emission reductions achieved, or expected to be achieved, under subchapter IV–A and other provisions of this chapter.

(July 14, 1955, ch. 360, title I, §190, as added Pub. L. 101–549, title I, §105(a), Nov. 15, 1990, 104 Stat. 2462.)