SUBCHAPTER V—PERMITS
§7661. Definitions
As used in this subchapter—
(1) Affected source
The term "affected source" shall have the meaning given such term in subchapter IV–A.
(2) Major source
The term "major source" means any stationary source (or any group of stationary sources located within a contiguous area and under common control) that is either of the following:
(A) A major source as defined in
(B) A major stationary source as defined in
(3) Schedule of compliance
The term "schedule of compliance" means a schedule of remedial measures, including an enforceable sequence of actions or operations, leading to compliance with an applicable implementation plan, emission standard, emission limitation, or emission prohibition.
(4) Permitting authority
The term "permitting authority" means the Administrator or the air pollution control agency authorized by the Administrator to carry out a permit program under this subchapter.
(July 14, 1955, ch. 360, title V, §501, as added
§7661a. Permit programs
(a) Violations
After the effective date of any permit program approved or promulgated under this subchapter, it shall be unlawful for any person to violate any requirement of a permit issued under this subchapter, or to operate an affected source (as provided in subchapter IV–A), a major source, any other source (including an area source) subject to standards or regulations under
(b) Regulations
The Administrator shall promulgate within 12 months after November 15, 1990, regulations establishing the minimum elements of a permit program to be administered by any air pollution control agency. These elements shall include each of the following:
(1) Requirements for permit applications, including a standard application form and criteria for determining in a timely fashion the completeness of applications.
(2) Monitoring and reporting requirements.
(3)(A) A requirement under State or local law or interstate compact that the owner or operator of all sources subject to the requirement to obtain a permit under this subchapter pay an annual fee, or the equivalent over some other period, sufficient to cover all reasonable (direct and indirect) costs required to develop and administer the permit program requirements of this subchapter, including
(i) reviewing and acting upon any application for such a permit,
(ii) if the owner or operator receives a permit for such source, whether before or after November 15, 1990, implementing and enforcing the terms and conditions of any such permit (not including any court costs or other costs associated with any enforcement action),
(iii) emissions and ambient monitoring,
(iv) preparing generally applicable regulations, or guidance,
(v) modeling, analyses, and demonstrations, and
(vi) preparing inventories and tracking emissions.
(B) The total amount of fees collected by the permitting authority shall conform to the following requirements:
(i) The Administrator shall not approve a program as meeting the requirements of this paragraph unless the State demonstrates that, except as otherwise provided in subparagraphs 2 (ii) through (v) of this subparagraph, the program will result in the collection, in the aggregate, from all sources subject to subparagraph (A), of an amount not less than $25 per ton of each regulated pollutant, or such other amount as the Administrator may determine adequately reflects the reasonable costs of the permit program.
(ii) As used in this subparagraph, the term "regulated pollutant" shall mean (I) a volatile organic compound; (II) each pollutant regulated under
(iii) In determining the amount under clause (i), the permitting authority is not required to include any amount of regulated pollutant emitted by any source in excess of 4,000 tons per year of that regulated pollutant.
(iv) The requirements of clause (i) shall not apply if the permitting authority demonstrates that collecting an amount less than the amount specified under clause (i) will meet the requirements of subparagraph (A).
(v) The fee calculated under clause (i) shall be increased (consistent with the need to cover the reasonable costs authorized by subparagraph (A)) in each year beginning after 1990, by the percentage, if any, by which the Consumer Price Index for the most recent calendar year ending before the beginning of such year exceeds the Consumer Price Index for the calendar year 1989. For purposes of this clause—
(I) the Consumer Price Index for any calendar year is the average of the Consumer Price Index for all-urban consumers published by the Department of Labor, as of the close of the 12-month period ending on August 31 of each calendar year, and
(II) the revision of the Consumer Price Index which is most consistent with the Consumer Price Index for calendar year 1989 shall be used.
(C)(i) If the Administrator determines, under subsection (d), that the fee provisions of the operating permit program do not meet the requirements of this paragraph, or if the Administrator makes a determination, under subsection (i), that the permitting authority is not adequately administering or enforcing an approved fee program, the Administrator may, in addition to taking any other action authorized under this subchapter, collect reasonable fees from the sources identified under subparagraph (A). Such fees shall be designed solely to cover the Administrator's costs of administering the provisions of the permit program promulgated by the Administrator.
(ii) Any source that fails to pay fees lawfully imposed by the Administrator under this subparagraph shall pay a penalty of 50 percent of the fee amount, plus interest on the fee amount computed in accordance with
(iii) Any fees, penalties, and interest collected under this subparagraph shall be deposited in a special fund in the United States Treasury for licensing and other services, which thereafter shall be available for appropriation, to remain available until expended, subject to appropriation, to carry out the Agency's activities for which the fees were collected. Any fee required to be collected by a State, local, or interstate agency under this subsection shall be utilized solely to cover all reasonable (direct and indirect) costs required to support the permit program as set forth in subparagraph (A).
(4) Requirements for adequate personnel and funding to administer the program.
(5) A requirement that the permitting authority have adequate authority to:
(A) issue permits and assure compliance by all sources required to have a permit under this subchapter with each applicable standard, regulation or requirement under this chapter;
(B) issue permits for a fixed term, not to exceed 5 years;
(C) assure that upon issuance or renewal permits incorporate emission limitations and other requirements in an applicable implementation plan;
(D) terminate, modify, or revoke and reissue permits for cause;
(E) enforce permits, permit fee requirements, and the requirement to obtain a permit, including authority to recover civil penalties in a maximum amount of not less than $10,000 per day for each violation, and provide appropriate criminal penalties; and
(F) assure that no permit will be issued if the Administrator objects to its issuance in a timely manner under this subchapter.
(6) Adequate, streamlined, and reasonable procedures for expeditiously determining when applications are complete, for processing such applications, for public notice, including offering an opportunity for public comment and a hearing, and for expeditious review of permit actions, including applications, renewals, or revisions, and including an opportunity for judicial review in State court of the final permit action by the applicant, any person who participated in the public comment process, and any other person who could obtain judicial review of that action under applicable law.
(7) To ensure against unreasonable delay by the permitting authority, adequate authority and procedures to provide that a failure of such permitting authority to act on a permit application or permit renewal application (in accordance with the time periods specified in
(8) Authority, and reasonable procedures consistent with the need for expeditious action by the permitting authority on permit applications and related matters, to make available to the public any permit application, compliance plan, permit, and monitoring or compliance report under
(9) A requirement that the permitting authority, in the case of permits with a term of 3 or more years for major sources, shall require revisions to the permit to incorporate applicable standards and regulations promulgated under this chapter after the issuance of such permit. Such revisions shall occur as expeditiously as practicable and consistent with the procedures established under paragraph (6) but not later than 18 months after the promulgation of such standards and regulations. No such revision shall be required if the effective date of the standards or regulations is a date after the expiration of the permit term. Such permit revision shall be treated as a permit renewal if it complies with the requirements of this subchapter regarding renewals.
(10) Provisions to allow changes within a permitted facility (or one operating pursuant to
(c) Single permit
A single permit may be issued for a facility with multiple sources.
(d) Submission and approval
(1) Not later than 3 years after November 15, 1990, the Governor of each State shall develop and submit to the Administrator a permit program under State or local law or under an interstate compact meeting the requirements of this subchapter. In addition, the Governor shall submit a legal opinion from the attorney general (or the attorney for those State air pollution control agencies that have independent legal counsel), or from the chief legal officer of an interstate agency, that the laws of the State, locality, or the interstate compact provide adequate authority to carry out the program. Not later than 1 year after receiving a program, and after notice and opportunity for public comment, the Administrator shall approve or disapprove such program, in whole or in part. The Administrator may approve a program to the extent that the program meets the requirements of this chapter, including the regulations issued under subsection (b). If the program is disapproved, in whole or in part, the Administrator shall notify the Governor of any revisions or modifications necessary to obtain approval. The Governor shall revise and resubmit the program for review under this section within 180 days after receiving notification.
(2)(A) If the Governor does not submit a program as required under paragraph (1) or if the Administrator disapproves a program submitted by the Governor under paragraph (1), in whole or in part, the Administrator may, prior to the expiration of the 18-month period referred to in subparagraph (B), in the Administrator's discretion, apply any of the sanctions specified in
(B) If the Governor does not submit a program as required under paragraph (1), or if the Administrator disapproves any such program submitted by the Governor under paragraph (1), in whole or in part, 18 months after the date required for such submittal or the date of such disapproval, as the case may be, the Administrator shall apply sanctions under
(C) The sanctions under
(3) If a program meeting the requirements of this subchapter has not been approved in whole for any State, the Administrator shall, 2 years after the date required for submission of such a program under paragraph (1), promulgate, administer, and enforce a program under this subchapter for that State.
(e) Suspension
The Administrator shall suspend the issuance of permits promptly upon publication of notice of approval of a permit program under this section, but may, in such notice, retain jurisdiction over permits that have been federally issued, but for which the administrative or judicial review process is not complete. The Administrator shall continue to administer and enforce federally issued permits under this subchapter until they are replaced by a permit issued by a permitting program. Nothing in this subsection should be construed to limit the Administrator's ability to enforce permits issued by a State.
(f) Prohibition
No partial permit program shall be approved unless, at a minimum, it applies, and ensures compliance with, this subchapter and each of the following:
(1) All requirements established under subchapter IV–A applicable to "affected sources".
(2) All requirements established under
(3) All requirements of subchapter I (other than
Approval of a partial program shall not relieve the State of its obligation to submit a complete program, nor from the application of any sanctions under this chapter for failure to submit an approvable permit program.
(g) Interim approval
If a program (including a partial permit program) submitted under this subchapter substantially meets the requirements of this subchapter, but is not fully approvable, the Administrator may by rule grant the program interim approval. In the notice of final rulemaking, the Administrator shall specify the changes that must be made before the program can receive full approval. An interim approval under this subsection shall expire on a date set by the Administrator not later than 2 years after such approval, and may not be renewed. For the period of any such interim approval, the provisions of subsection (d)(2), and the obligation of the Administrator to promulgate a program under this subchapter for the State pursuant to subsection (d)(3), shall be suspended. Such provisions and such obligation of the Administrator shall apply after the expiration of such interim approval.
(h) Effective date
The effective date of a permit program, or partial or interim program, approved under this subchapter, shall be the effective date of approval by the Administrator. The effective date of a permit program, or partial permit program, promulgated by the Administrator shall be the date of promulgation.
(i) Administration and enforcement
(1) Whenever the Administrator makes a determination that a permitting authority is not adequately administering and enforcing a program, or portion thereof, in accordance with the requirements of this subchapter, the Administrator shall provide notice to the State and may, prior to the expiration of the 18-month period referred to in paragraph (2), in the Administrator's discretion, apply any of the sanctions specified in
(2) Whenever the Administrator makes a determination that a permitting authority is not adequately administering and enforcing a program, or portion thereof, in accordance with the requirements of this subchapter, 18 months after the date of the notice under paragraph (1), the Administrator shall apply the sanctions under
(3) The sanctions under
(4) Whenever the Administrator has made a finding under paragraph (1) with respect to any State, unless the State has corrected such deficiency within 18 months after the date of such finding, the Administrator shall, 2 years after the date of such finding, promulgate, administer, and enforce a program under this subchapter for that State. Nothing in this paragraph shall be construed to affect the validity of a program which has been approved under this subchapter or the authority of any permitting authority acting under such program until such time as such program is promulgated by the Administrator under this paragraph.
(July 14, 1955, ch. 360, title V, §502, as added
1 So in original. Probably should be "part".
2 So in original. Probably should be "clauses".
3 So in original. A closing parenthesis probably should precede the colon.
§7661b. Permit applications
(a) Applicable date
Any source specified in
(1) the effective date of a permit program or partial or interim permit program applicable to the source; or
(2) the date such source becomes subject to
(b) Compliance plan
(1) The regulations required by
(2) The regulations shall further require the permittee to periodically (but no less frequently than annually) certify that the facility is in compliance with any applicable requirements of the permit, and to promptly report any deviations from permit requirements to the permitting authority.
(c) Deadline
Any person required to have a permit shall, not later than 12 months after the date on which the source becomes subject to a permit program approved or promulgated under this subchapter, or such earlier date as the permitting authority may establish, submit to the permitting authority a compliance plan and an application for a permit signed by a responsible official, who shall certify the accuracy of the information submitted. The permitting authority shall approve or disapprove a completed application (consistent with the procedures established under this subchapter for consideration of such applications), and shall issue or deny the permit, within 18 months after the date of receipt thereof, except that the permitting authority shall establish a phased schedule for acting on permit applications submitted within the first full year after the effective date of a permit program (or a partial or interim program). Any such schedule shall assure that at least one-third of such permits will be acted on by such authority annually over a period of not to exceed 3 years after such effective date. Such authority shall establish reasonable procedures to prioritize such approval or disapproval actions in the case of applications for construction or modification under the applicable requirements of this chapter.
(d) Timely and complete applications
Except for sources required to have a permit before construction or modification under the applicable requirements of this chapter, if an applicant has submitted a timely and complete application for a permit required by this subchapter (including renewals), but final action has not been taken on such application, the source's failure to have a permit shall not be a violation of this chapter, unless the delay in final action was due to the failure of the applicant timely to submit information required or requested to process the application. No source required to have a permit under this subchapter shall be in violation of
(e) Copies; availability
A copy of each permit application, compliance plan (including the schedule of compliance), emissions or compliance monitoring report, certification, and each permit issued under this subchapter, shall be available to the public. If an applicant or permittee is required to submit information entitled to protection from disclosure under
(July 14, 1955, ch. 360, title V, §503, as added
§7661c. Permit requirements and conditions
(a) Conditions
Each permit issued under this subchapter shall include enforceable emission limitations and standards, a schedule of compliance, a requirement that the permittee submit to the permitting authority, no less often than every 6 months, the results of any required monitoring, and such other conditions as are necessary to assure compliance with applicable requirements of this chapter, including the requirements of the applicable implementation plan.
(b) Monitoring and analysis
The Administrator may by rule prescribe procedures and methods for determining compliance and for monitoring and analysis of pollutants regulated under this chapter, but continuous emissions monitoring need not be required if alternative methods are available that provide sufficiently reliable and timely information for determining compliance. Nothing in this subsection shall be construed to affect any continuous emissions monitoring requirement of subchapter IV–A, or where required elsewhere in this chapter.
(c) Inspection, entry, monitoring, certification, and reporting
Each permit issued under this subchapter shall set forth inspection, entry, monitoring, compliance certification, and reporting requirements to assure compliance with the permit terms and conditions. Such monitoring and reporting requirements shall conform to any applicable regulation under subsection (b). Any report required to be submitted by a permit issued to a corporation under this subchapter shall be signed by a responsible corporate official, who shall certify its accuracy.
(d) General permits
The permitting authority may, after notice and opportunity for public hearing, issue a general permit covering numerous similar sources. Any general permit shall comply with all requirements applicable to permits under this subchapter. No source covered by a general permit shall thereby be relieved from the obligation to file an application under
(e) Temporary sources
The permitting authority may issue a single permit authorizing emissions from similar operations at multiple temporary locations. No such permit shall be issued unless it includes conditions that will assure compliance with all the requirements of this chapter at all authorized locations, including, but not limited to, ambient standards and compliance with any applicable increment or visibility requirements under part C of subchapter I. Any such permit shall in addition require the owner or operator to notify the permitting authority in advance of each change in location. The permitting authority may require a separate permit fee for operations at each location.
(f) Permit shield
Compliance with a permit issued in accordance with this subchapter shall be deemed compliance with
(1) the permit includes the applicable requirements of such provisions, or
(2) the permitting authority in acting on the permit application makes a determination relating to the permittee that such other provisions (which shall be referred to in such determination) are not applicable and the permit includes the determination or a concise summary thereof.
Nothing in the preceding sentence shall alter or affect the provisions of
(July 14, 1955, ch. 360, title V, §504, as added
§7661d. Notification to Administrator and contiguous States
(a) Transmission and notice
(1) Each permitting authority—
(A) shall transmit to the Administrator a copy of each permit application (and any application for a permit modification or renewal) or such portion thereof, including any compliance plan, as the Administrator may require to effectively review the application and otherwise to carry out the Administrator's responsibilities under this chapter, and
(B) shall provide to the Administrator a copy of each permit proposed to be issued and issued as a final permit.
(2) The permitting authority shall notify all States—
(A) whose air quality may be affected and that are contiguous to the State in which the emission originates, or
(B) that are within 50 miles of the source,
of each permit application or proposed permit forwarded to the Administrator under this section, and shall provide an opportunity for such States to submit written recommendations respecting the issuance of the permit and its terms and conditions. If any part of those recommendations are not accepted by the permitting authority, such authority shall notify the State submitting the recommendations and the Administrator in writing of its failure to accept those recommendations and the reasons therefor.
(b) Objection by EPA
(1) If any permit contains provisions that are determined by the Administrator as not in compliance with the applicable requirements of this chapter, including the requirements of an applicable implementation plan, the Administrator shall, in accordance with this subsection, object to its issuance. The permitting authority shall respond in writing if the Administrator (A) within 45 days after receiving a copy of the proposed permit under subsection (a)(1), or (B) within 45 days after receiving notification under subsection (a)(2), objects in writing to its issuance as not in compliance with such requirements. With the objection, the Administrator shall provide a statement of the reasons for the objection. A copy of the objection and statement shall be provided to the applicant.
(2) If the Administrator does not object in writing to the issuance of a permit pursuant to paragraph (1), any person may petition the Administrator within 60 days after the expiration of the 45-day review period specified in paragraph (1) to take such action. A copy of such petition shall be provided to the permitting authority and the applicant by the petitioner. The petition shall be based only on objections to the permit that were raised with reasonable specificity during the public comment period provided by the permitting agency (unless the petitioner demonstrates in the petition to the Administrator that it was impracticable to raise such objections within such period or unless the grounds for such objection arose after such period). The petition shall identify all such objections. If the permit has been issued by the permitting agency, such petition shall not postpone the effectiveness of the permit. The Administrator shall grant or deny such petition within 60 days after the petition is filed. The Administrator shall issue an objection within such period if the petitioner demonstrates to the Administrator that the permit is not in compliance with the requirements of this chapter, including the requirements of the applicable implementation plan. Any denial of such petition shall be subject to judicial review under
(3) Upon receipt of an objection by the Administrator under this subsection, the permitting authority may not issue the permit unless it is revised and issued in accordance with subsection (c). If the permitting authority has issued a permit prior to receipt of an objection by the Administrator under paragraph (2) of this subsection, the Administrator shall modify, terminate, or revoke such permit and the permitting authority may thereafter only issue a revised permit in accordance with subsection (c).
(c) Issuance or denial
If the permitting authority fails, within 90 days after the date of an objection under subsection (b), to submit a permit revised to meet the objection, the Administrator shall issue or deny the permit in accordance with the requirements of this subchapter. No objection shall be subject to judicial review until the Administrator takes final action to issue or deny a permit under this subsection.
(d) Waiver of notification requirements
(1) The Administrator may waive the requirements of subsections (a) and (b) at the time of approval of a permit program under this subchapter for any category (including any class, type, or size within such category) of sources covered by the program other than major sources.
(2) The Administrator may, by regulation, establish categories of sources (including any class, type, or size within such category) to which the requirements of subsections (a) and (b) shall not apply. The preceding sentence shall not apply to major sources.
(3) The Administrator may exclude from any waiver under this subsection notification under subsection (a)(2). Any waiver granted under this subsection may be revoked or modified by the Administrator by rule.
(e) Refusal of permitting authority to terminate, modify, or revoke and reissue
If the Administrator finds that cause exists to terminate, modify, or revoke and reissue a permit under this subchapter, the Administrator shall notify the permitting authority and the source of the Administrator's finding. The permitting authority shall, within 90 days after receipt of such notification, forward to the Administrator under this section a proposed determination of termination, modification, or revocation and reissuance, as appropriate. The Administrator may extend such 90 day period for an additional 90 days if the Administrator finds that a new or revised permit application is necessary, or that the permitting authority must require the permittee to submit additional information. The Administrator may review such proposed determination under the provisions of subsections (a) and (b). If the permitting authority fails to submit the required proposed determination, or if the Administrator objects and the permitting authority fails to resolve the objection within 90 days, the Administrator may, after notice and in accordance with fair and reasonable procedures, terminate, modify, or revoke and reissue the permit.
(July 14, 1955, ch. 360, title V, §505, as added
§7661e. Other authorities
(a) In general
Nothing in this subchapter shall prevent a State, or interstate permitting authority, from establishing additional permitting requirements not inconsistent with this chapter.
(b) Permits implementing acid rain provisions
The provisions of this subchapter, including provisions regarding schedules for submission and approval or disapproval of permit applications, shall apply to permits implementing the requirements of subchapter IV–A except as modified by that subchapter.
(July 14, 1955, ch. 360, title V, §506, as added
§7661f. Small business stationary source technical and environmental compliance assistance program
(a) Plan revisions
Consistent with
(1) Adequate mechanisms for developing, collecting, and coordinating information concerning compliance methods and technologies for small business stationary sources, and programs to encourage lawful cooperation among such sources and other persons to further compliance with this chapter.
(2) Adequate mechanisms for assisting small business stationary sources with pollution prevention and accidental release detection and prevention, including providing information concerning alternative technologies, process changes, products, and methods of operation that help reduce air pollution.
(3) A designated State office within the relevant State agency to serve as ombudsman for small business stationary sources in connection with the implementation of this chapter.
(4) A compliance assistance program for small business stationary sources which assists small business stationary sources in determining applicable requirements and in receiving permits under this chapter in a timely and efficient manner.
(5) Adequate mechanisms to assure that small business stationary sources receive notice of their rights under this chapter in such manner and form as to assure reasonably adequate time for such sources to evaluate compliance methods and any relevant or applicable proposed or final regulation or standard issued under this chapter.
(6) Adequate mechanisms for informing small business stationary sources of their obligations under this chapter, including mechanisms for referring such sources to qualified auditors or, at the option of the State, for providing audits of the operations of such sources to determine compliance with this chapter.
(7) Procedures for consideration of requests from a small business stationary source for modification of—
(A) any work practice or technological method of compliance, or
(B) the schedule of milestones for implementing such work practice or method of compliance preceding any applicable compliance date,
based on the technological and financial capability of any such small business stationary source. No such modification may be granted unless it is in compliance with the applicable requirements of this chapter, including the requirements of the applicable implementation plan. Where such applicable requirements are set forth in Federal regulations, only modifications authorized in such regulations may be allowed.
(b) Program
The Administrator shall establish within 9 months after November 15, 1990, a small business stationary source technical and environmental compliance assistance program. Such program shall—
(1) assist the States in the development of the program required under subsection (a) (relating to assistance for small business stationary sources);
(2) issue guidance for the use of the States in the implementation of these programs that includes alternative control technologies and pollution prevention methods applicable to small business stationary sources; and
(3) provide for implementation of the program provisions required under subsection (a)(4) in any State that fails to submit such a program under that subsection.
(c) Eligibility
(1) Except as provided in paragraphs (2) and (3), for purposes of this section, the term "small business stationary source" means a stationary source that—
(A) is owned or operated by a person that employs 100 or fewer individuals,1
(B) is a small business concern as defined in the Small Business Act [
(C) is not a major stationary source;
(D) does not emit 50 tons or more per year of any regulated pollutant; and
(E) emits less than 75 tons per year of all regulated pollutants.
(2) Upon petition by a source, the State may, after notice and opportunity for public comment, include as a small business stationary source for purposes of this section any stationary source which does not meet the criteria of subparagraphs 2 (C), (D), or (E) of paragraph (1) but which does not emit more than 100 tons per year of all regulated pollutants.
(3)(A) The Administrator, in consultation with the Administrator of the Small Business Administration and after providing notice and opportunity for public comment, may exclude from the small business stationary source definition under this section any category or subcategory of sources that the Administrator determines to have sufficient technical and financial capabilities to meet the requirements of this chapter without the application of this subsection.
(B) The State, in consultation with the Administrator and the Administrator of the Small Business Administration and after providing notice and opportunity for public hearing, may exclude from the small business stationary source definition under this section any category or subcategory of sources that the State determines to have sufficient technical and financial capabilities to meet the requirements of this chapter without the application of this subsection.
(d) Monitoring
The Administrator shall direct the Agency's Office of Small and Disadvantaged Business Utilization through the Small Business Ombudsman (hereinafter in this section referred to as the "Ombudsman") to monitor the small business stationary source technical and environmental compliance assistance program under this section. In carrying out such monitoring activities, the Ombudsman shall—
(1) render advisory opinions on the overall effectiveness of the Small Business Stationary Source Technical and Environmental Compliance Assistance Program, difficulties encountered, and degree and severity of enforcement;
(2) make periodic reports to the Congress on the compliance of the Small Business Stationary Source Technical and Environmental Compliance Assistance Program with the requirements of the Paperwork Reduction Act,3 the Regulatory Flexibility Act [
(3) review information to be issued by the Small Business Stationary Source Technical and Environmental Compliance Assistance Program for small business stationary sources to ensure that the information is understandable by the layperson; and
(4) have the Small Business Stationary Source Technical and Environmental Compliance Assistance Program serve as the secretariat for the development and dissemination of such reports and advisory opinions.
(e) Compliance Advisory Panel
(1) There shall be created a Compliance Advisory Panel (hereinafter referred to as the "Panel") on the State level of not less than 7 individuals. This Panel shall—
(A) render advisory opinions concerning the effectiveness of the small business stationary source technical and environmental compliance assistance program, difficulties encountered, and degree and severity of enforcement;
(B) make periodic reports to the Administrator concerning the compliance of the State Small Business Stationary Source Technical and Environmental Compliance Assistance Program with the requirements of the Paperwork Reduction Act,3 the Regulatory Flexibility Act [
(C) review information for small business stationary sources to assure such information is understandable by the layperson; and
(D) have the Small Business Stationary Source Technical and Environmental Compliance Assistance Program serve as the secretariat for the development and dissemination of such reports and advisory opinions.
(2) The Panel shall consist of—
(A) 2 members, who are not owners, or representatives of owners, of small business stationary sources, selected by the Governor to represent the general public;
(B) 2 members selected by the State legislature who are owners, or who represent owners, of small business stationary sources (1 member each by the majority and minority leadership of the lower house, or in the case of a unicameral State legislature, 2 members each shall be selected by the majority leadership and the minority leadership, respectively, of such legislature, and subparagraph (C) shall not apply);
(C) 2 members selected by the State legislature who are owners, or who represent owners, of small business stationary sources (1 member each by the majority and minority leadership of the upper house, or the equivalent State entity); and
(D) 1 member selected by the head of the department or agency of the State responsible for air pollution permit programs to represent that agency.
(f) Fees
The State (or the Administrator) may reduce any fee required under this chapter to take into account the financial resources of small business stationary sources.
(g) Continuous emission monitors
In developing regulations and CTGs under this chapter that contain continuous emission monitoring requirements, the Administrator, consistent with the requirements of this chapter, before applying such requirements to small business stationary sources, shall consider the necessity and appropriateness of such requirements for such sources. Nothing in this subsection shall affect the applicability of subchapter IV–A provisions relating to continuous emissions monitoring.
(h) Control technique guidelines
The Administrator shall consider, consistent with the requirements of this chapter, the size, type, and technical capabilities of small business stationary sources (and sources which are eligible under subsection (c)(2) to be treated as small business stationary sources) in developing CTGs applicable to such sources under this chapter.
(July 14, 1955, ch. 360, title V, §507, as added
Editorial Notes
References in Text
The Small Business Act, referred to in subsec. (c)(1)(B), is
The Paperwork Reduction Act, referred to in subsecs. (d)(2) and (e)(1)(B), probably means the Paperwork Reduction Act of 1980,
The Regulatory Flexibility Act, referred to in subsecs. (d)(2) and (e)(1)(B), is
The Equal Access to Justice Act, referred to in subsecs. (d)(2) and (e)(1)(B), is title II of
1 So in original. The comma probably should be a semicolon.