SUBCHAPTER II—NEW FACILITIES
Part A—Prohibitions
§8311. Coal capability of new electric powerplants; certification of compliance
(a) General prohibition
Except to such extent as may be authorized under part B, no new electric powerplant may be constructed or operated as a base load powerplant without the capability to use coal or another alternate fuel as a primary energy source.
(b) Capability to use coal or alternate fuel
An electric powerplant has the capability to use coal or another alternate fuel for purposes of this section if such electric powerplant—
(1) has sufficient inherent design characteristics to permit the addition of equipment (including all necessary pollution devices) necessary to render such electric powerplant capable of using coal or another alternate fuel as its primary energy source; and
(2) is not physically, structurally, or technologically precluded from using coal or another alternate fuel as its primary energy source.
Capability to use coal or another alternate fuel shall not be interpreted to require any such powerplant to be immediately able to use coal or another alternate fuel as its primary energy source on its initial day of operation.
(c) Applicability to base load powerplants
(1) This section shall apply only to base load powerplants, and shall not apply to peakload powerplants or intermediate load powerplants.
(2) For the purposes of this section, hours of electrical generation pursuant to emergency situations, as defined by the Secretary and reported to the Secretary, shall not be included in a determination of whether a powerplant is being operated as a base load powerplant.
(d) Self-certification
(1) In order to meet the requirement of subsection (a), the owner or operator of any new electric powerplant to be operated as a base load powerplant proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary prior to construction, or prior to operation as a base load powerplant in the case of a new electric powerplant operated as a peakload powerplant or intermediate load powerplant, that such powerplant has capability to use coal or another alternate fuel, within the meaning of subsection (b). Such certification shall be effective to establish compliance with the requirement of subsection (a) as of the date it is filed with the Secretary. Within 15 days after receipt of a certification submitted pursuant to this paragraph, the Secretary shall publish in the Federal Register a notice reciting that the certification has been filed.
(2) The Secretary, within 60 days after the filing of a certification under paragraph (1), may require the owner or operator of such powerplant to provide such supporting documents as may be necessary to verify the certification.
(
Editorial Notes
Amendments
1987—
"(1) natural gas or petroleum shall not be used as a primary energy source in any new electric powerplant; and
"(2) no new electric powerplant may be constructed without the capability to use coal or any other alternate fuel as a primary energy source."
§8312. Repealed. Pub. L. 100–42, §1(a)(1), May 21, 1987, 101 Stat. 310
Section,
Part B—Exemptions
§8321. Temporary exemptions
(a) General exemption due to lack of alternate fuel supply, site limitations, or environmental requirements
After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary shall, by order, grant an exemption under this subsection for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that for the period of the proposed exemption, despite diligent good faith efforts—
(1) it is likely that an adequate and reliable supply of coal or other alternate fuel of the quality necessary to conform with design and operational requirements for use as a primary energy source will not be available to such powerplant at a cost (taking into account associated facilities for the transportation and use of such fuel) which, based upon the best practicable estimates, does not substantially exceed the cost, as determined by rule by the Secretary, of the fuel that would be used as a primary energy source;
(2) one or more site limitations exist which would ot 1 permit the location or operation of such a powerplant using coal or any other alternate fuel as a primary energy source; or
(3) the prohibitions of
(b) Temporary exemption based upon future use of synthetic fuels
After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary shall, by order, grant an exemption under this subsection for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that—
(1) the petitioner will comply with the prohibitions of part A by the end of the proposed exemption by the use of a synthetic fuel derived from coal or another alternate fuel; and
(2) the petitioner is not able to comply with such prohibitions by the use of such synthetic fuel until the end of the proposed exemption.
The effectiveness of an exemption under this subsection is conditioned on the petitioner filing and maintaining a compliance plan meeting the requirements of
(c), (d) Repealed. Pub. L. 100–42, §1(c)(5)(E), May 21, 1987, 101 Stat. 312
(e) Duration of temporary exemptions
(1) Except as provided in paragraph (2), exemptions under this section for any powerplant may not exceed, taking into account any extension or renewal, 5 years.
(2)(A) An exemption under subsection (a)(1) may be granted for a period of more than 5 years, but may not exceed, taking into account any extension or renewal, 10 years.
(B) An exemption under subsection (b) may be extended beyond the 5-year limit under paragraph (1), but such exemption, so extended, may not exceed 10 years.
(3) If an exemption is granted for any powerplant before the powerplant is placed in service, the period before it is placed in service shall not be taken into account in computing the 5-year and the 10-year limitations of paragraphs (1) and (2).
(
Editorial Notes
Amendments
1987—Subsec. (a).
Subsec. (b).
Subsec. (c).
Subsec. (d).
Subsec. (e)(1), (3).
Statutory Notes and Related Subsidiaries
Exemption for Certain Electric Powerplants and Temporary Exemption Issued Under Subsection (d) as Effective Prior to 180 Days After November 9, 1978
For effectiveness of exemption for certain electric powerplants and the temporary exemption issued under subsec. (d) of this section as prior to 180 days after Nov. 9, 1978, see section 902 of
1 So in original. Probably should be "not".
§8322. Permanent exemptions
(a) Permanent exemption due to lack of alternate fuel supply, site limitations, environmental requirements, or adequate capital
(1) After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary shall, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that despite diligent good faith efforts—
(A) it is likely that an adequate and reliable supply of coal or other alternate fuel of the quality necessary to conform with design and operational requirements for use as a primary energy source (i) will not be available within the first 10 years of the useful life of the powerplant, or (ii) will not be available at a cost (taking into account associated facilities for the transportation and use of such fuel) which, based upon the best practicable estimates, does not substantially exceed the cost, as determined by rule by the Secretary, of the fuel that would be used as a primary energy source during the useful life of the powerplant involved;
(B) one or more site limitations exist which would not permit the location or operation of such powerplant using coal or any other alternate fuel as a primary energy source;
(C) the prohibitions of part A could not be satisfied without violating applicable environmental requirements; or
(D) the required use of coal or any other alternate fuel would not allow the petitioner to obtain adequate capital for the financing of such powerplant.
(2) The demonstration required to be made by a petitioner under paragraph (1) shall be made with respect to the site of such powerplant and reasonable alternative sites.
(b) Permanent exemption due to certain State or local requirements
After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary may, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that—
(1) with respect to the proposed site of the powerplant, the construction or operation of such a facility using coal or any other alternate fuel is infeasible because of a State or local requirement (other than a building code or a nuisance or zoning law);
(2) there is no reasonable alternative site for such powerplant which meets the criteria set forth in subsection (a)(1)(A) through (D); and
(3) the granting of the exemption would be in the public interest and would be consistent with the purposes of this chapter.
(c) Permanent exemption for cogeneration
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a cogeneration facility, the Secretary may, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he—
(1) finds that the petitioner has demonstrated that economic and other benefits of cogeneration are unobtainable unless petroleum or natural gas, or both, are used in such facility, and
(2) includes in the final order a statement of the basis for such finding.
(d) Permanent exemption for certain mixtures containing natural gas or petroleum
After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary shall, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that—
(1) the powerplant uses, or proposes to use, a mixture of petroleum or natural gas and coal or another alternate fuel as a primary energy source; and
(2) the amount of the petroleum or natural gas used in such mixture will not exceed the minimum percentage of the total Btu heat input of the primary energy sources of such powerplant needed to maintain reliability of operation of such powerplant consistent with maintaining a reasonable level of fuel efficiency, as determined in accordance with rules prescribed by the Secretary.
(e) Permanent exemption for emergency purposes
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that such powerplant will be maintained and operated only for emergency purposes (as defined by rule by the Secretary).
(f) Permanent exemption for powerplants necessary to maintain reliability of service
After consideration of a petition (and comments thereon) for an exemption for a powerplant from one or more of the prohibitions of part A, the Secretary may, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum if he finds that the petitioner has demonstrated that—
(1) such exemption is necessary to prevent impairment of reliability of service, and
(2) the petitioner, despite diligent good faith efforts, is not able to make the demonstration necessary to obtain an exemption under subsection (a) or (b) in the time required to prevent such impairment of service.
(
Editorial Notes
References in Text
This chapter, referred to in subsec. (b)(3), was in the original "this Act", meaning
Amendments
1987—Subsec. (a)(1).
Subsec. (a)(2).
"(A) in the case of a new major fuel-burning installation, be made with respect to the site of such installation proposed by the petitioner; and
"(B) in the case of a new electric powerplant,"
after "paragraph (1) shall".
Subsec. (a)(3).
Subsec. (b).
Subsec. (d).
Subsec. (e).
Subsec. (g).
Subsec. (h).
Subsec. (i).
Subsec. (j).
Statutory Notes and Related Subsidiaries
Exemption for Certain Electric Powerplants as Effective Prior to 180 Days After November 9, 1978
For effectiveness of exemption for certain electric powerplants as prior to 180 days after Nov. 9, 1978, see section 902(a) of
§8323. General requirements for exemptions
(a) Use of mixtures or fluidized bed combustion not feasible
Except in the case of an exemption under
(1) if the applicant has demonstrated that the use of a mixture of natural gas or petroleum and coal or another alternate fuel, for which an exemption under
(2) if the Secretary has not made a finding that the use of a method of fluidized bed combustion of coal or another alternate fuel is economically and technically feasible.
(b) State approval required for powerplant
If the appropriate State regulatory authority has not approved a powerplant for which a petition has been filed, such exemption, to the extent it applies to the prohibition under
(c) No alternative power supply in the case of a powerplant
(1) Except in the case of an exemption under
(2) The Secretary shall forward a copy of any such petition to the Federal Energy Regulatory Commission promptly after it is filed with the Secretary and shall consult with such Commission before making any finding on such petition under paragraph (1).
(
Editorial Notes
Amendments
1987—Subsec. (a).
Subsec. (b).
"(1) to the extent it applies to the prohibition under
"(2) to the extent it applies to the prohibition under
Subsec. (c)(1).
Statutory Notes and Related Subsidiaries
Exemption for Certain Electric Powerplants as Effective Prior to 180 Days After November 9, 1978
For effectiveness of exemption for certain electric powerplants as prior to 180 days after Nov. 9, 1978, see section 902(a) of
§8324. Terms and conditions; compliance plans
(a) Terms and conditions generally
Any exemption from any prohibition under this part shall be on such terms and conditions as the Secretary determines appropriate, including terms and conditions requiring the use of effective fuel conservation measures which are practicable and consistent with the purposes of this chapter. In the case of any temporary exemption, the terms and conditions (which may include a compliance plan meeting the requirements of subsection (b)) shall be designed to insure that upon the expiration of such exemption, the persons and powerplant covered by such exemption will comply with the applicable prohibitions.
(b) Compliance plans
A compliance plan meets the requirements of this subsection if it is approved by the Secretary and—
(1) contains (A) a schedule indicating how compliance with applicable prohibitions of this chapter will occur and (B) evidence of binding contracts for fuel, or facilities for the production of fuel, which would allow or 1 such compliance; and
(2) is revised at such times and to such extent as the Secretary may require to reflect changes in circumstances.
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (a) and (b)(1)(A), was in the original "this Act", meaning
Amendments
1987—Subsec. (a).
Statutory Notes and Related Subsidiaries
Exemption for Certain Electric Powerplants as Effective Prior to 180 Days After November 9, 1978
For effectiveness of exemption for certain electric powerplants as prior to 180 days after Nov. 9, 1978, see section 902(a) of