SUBCHAPTER III—EXISTING FACILITIES
Part A—Prohibitions
§8341. Existing electric powerplants
(a) Certification by powerplants of coal capability
At any time, the owner or operator of an existing electric powerplant may certify to the Secretary, for purposes of subsection (b)—
(1) whether or not such powerplant has or previously had the technical capability to use coal or another alternate fuel as a primary energy source;
(2) whether or not such powerplant could have the technical capability to use coal or another alternate fuel as a primary energy source without having—
(A) substantial physical modification of the powerplant, or
(B) substantial reduction in the rated capacity of the powerplant; and
(3) whether or not it is financially feasible to use coal or another alternate fuel as a primary energy source in such a powerplant.
(b) Authority of Secretary to prohibit where coal or alternate fuel capability exists
The Secretary may prohibit, in accordance with section 8343(a) or (b) of this title, the use of petroleum or natural gas, or both, as a primary energy source in any existing electric powerplant, if an affirmative certification under subsection (a)(1), (2), and (3) is in effect with respect to such powerplant and if, after examining the basis for the certification, the Secretary concurs with the certification.
(c) Authority of Secretary to prohibit excessive use in mixtures
At any time, the owner or operator of an existing electric powerplant may certify to the Secretary for purposes of this subsection whether or not it is technically and financially feasible to use a mixture of petroleum or natural gas and coal or another alternate fuel as a primary energy source in that powerplant. If an affirmative certification under this subsection is in effect with respect to such powerplant and if, after examining the basis for the certification, the Secretary concurs with the certification, the Secretary may prohibit, in accordance with
(d) Amendment of subsection (a) and (c) certifications
The owner or operator of any such powerplant may at any time amend any certification under subsection (a) or (c) in order to take into account changes in relevant facts and circumstances; except that no such amendment to such a certification may be made after the date of any final prohibition under subsection (b) or (c) based on that certification.
(
Editorial Notes
Prior Provisions
A prior section 8341,
Statutory Notes and Related Subsidiaries
Effective Date
Section effective Aug. 13, 1981, see section 1038 of
Validity of Orders Under Former Provisions of This Section
"(a) The amendments made by section 1021 to section 301(b) and (c) of the Powerplant and Industrial Fuel Use Act of 1978 [subsecs. (b) and (c) of this section] shall not apply to any electric powerplant for which a final order was issued pursuant to section 301(b) or (c) of such Act before the date of the enactment of this Act [Aug. 13, 1981].
"(b) Any electric powerplant issued a proposed order under section 301(b) or (c) of such Act which is pending on the date of the enactment of this Act may elect not to have the amendments made by section 1021 to such section 301(b) or (c) apply with respect to that powerplant. Such an election shall be irrevocable and shall be made in such form and manner as the Secretary of Energy shall, within 45 days after the date of the enactment of this Act, prescribe. Such an election shall be made not later than 60 days after the date on which the Secretary of Energy prescribes the form and manner of making such election.
"(c)(1) The amendments made by section 1021 shall not affect the validity of any final order issued under section 301(b) or (c) of the Powerplant and Industrial Fuel Use Act of 1978 before the date of the enactment of this Act.
"(2) The validity of any proposed order issued under such section 301(b) or (c) shall not be affected in the case of powerplants covered by elections made under subsection (b).
"(3) The authority of the Secretary of Energy to amend, repeal, rescind, modify, or enforce any order referred to in paragraph (1) or (2), or rules applicable thereto, shall remain in effect notwithstanding any such amendments."
§8342. Repealed. Pub. L. 100–42, §1(a)(2), May 21, 1987, 101 Stat. 310
Section,
§8343. Rules relating to case-by-case and category prohibitions
(a) Case-by-case prohibitions
(1) Except to the extent authorized by subsection (b), the Secretary shall prohibit any powerplant from using natural gas or petroleum under the authority granted him under section 8341(b) or (c) of this title only by means of a final order issued by him which shall be limited to the particular powerplant involved.
(2) The Secretary may issue such a final order only with respect to a powerplant which is not, at the time the proposed order is issued, covered by a final rule issued under section 1 (b).
(b) Prohibitions applicable to categories of facilities
(1) The Secretary may prohibit, by rule, the use of natural gas or petroleum under
(2) Each powerplant to be covered by any final rule issued under this subsection shall be specifically identified in the proposed rule published under
(3) In prescribing any final rule under this subsection, the Secretary shall take into account any special circumstances or characteristics of each category of powerplants (such as the intermittent use, size, age, or geographic location of such powerplants). Any such rules shall not apply in the case of any existing electric powerplant with respect to which a comparable prohibition was issued by order.
(
Editorial Notes
Amendments
1987—Subsec. (a)(1).
Subsec. (a)(2).
Subsec. (a)(3).
"(A) Subject to subparagraph (B), the Secretary shall not issue a final order under this subsection to any powerplant if it is demonstrated that such powerplant would have been granted an exemption if such prohibition had been established by a final rule pursuant to subsection (b) rather than by order pursuant to this subsection, except that if a temporary exemption would have been granted, such a final order may be issued but may not take effect until such time as the temporary exemption would have terminated.
"(B) In any case in which an order is not issued by reason of subparagraph (A) or in which the effective date of such order is delayed under subparagraph (A), the Secretary shall take such steps as may be necessary to assure the installation involved complies with the same requirements (including provisions of
Subsec. (b)(1).
"(A) in the case of any category of existing electric powerplants identified in such rule; and
"(B) in the case of any category of existing major fuel-burning installations which have design capabilities of consuming fuel (or any mixture thereof) at a fuel heat input rate of 300 million Btu's per hour or greater which are identified in such rule."
Subsec. (b)(2).
Subsec. (b)(3).
1 So in original. Probably should be "subsection".
Part B—Exemptions
§8351. Temporary exemptions
(a) Temporary exemption due to lack of alternate fuel supply, site limitations, or environmental requirements
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant such an exemption for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that for the period of the proposed exemption, despite diligent good faith efforts—
(1) it is likely that an adequate and reliable supply of coal or other alternate fuel of the quality necessary to conform with design and operational requirements for use as a primary energy source, will not be available to such powerplant at a cost (taking into account associated facilities for the transportation and use of such fuel) which, based upon the best practicable estimates, does not substantially exceed the costs, as determined by rule by the Secretary, of using imported petroleum as a primary energy source;
(2) one or more site limitations exist which would not permit the operation of such a powerplant using coal or any other alternate fuel as a primary energy source; or
(3) the prohibitions of
(b) Temporary exemption based upon future use of synthetic fuels
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary, by order, shall grant an exemption under this subsection for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that—
(1) the petitioner will comply with the prohibitions of part A by the end of the proposed exemption by the use of a synthetic fuel derived from coal or another alternate fuel; and
(2) the petitioner is not able to comply with such prohibitions by the use of such synthetic fuel until the end of the proposed exemption.
The effectiveness of an exemption under this subsection is conditioned on the petitioner filing and maintaining a compliance plan meeting the requirements of
(c) Temporary exemption based upon use of innovative technologies
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary, by order, shall grant an exemption under this subsection for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that such powerplant will comply with such prohibitions at the expiration of such exemption by the adoption of a technology for the use of coal or another alternate fuel which at the time of the granting of the exemption is determined by the Secretary to be an innovative technology. The effectiveness of an exemption under this subsection is conditioned on the petitioner filing and maintaining a compliance plan meeting the requirements of
(d) Temporary exemption for units to be retired
(1) After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant an exemption under this subsection for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that such powerplant is to permanently cease operation at or before the expiration of the exemption period. An exemption under this subsection is conditioned on the petitioner filing and maintaining a compliance plan meeting the requirements of section 8354(b) (other than paragraph (1)(B)) of this title.
(2) Notwithstanding any other provision of this chapter, an exemption under this part may not be granted for any powerplant once an exemption under this subsection has been granted for such powerplant.
(e) Temporary public interest exemption
After consideration of a petition (and comments thereon) for an exemption for a powerplant from one or more of the prohibitions of part A for a powerplant, the Secretary may, by order, grant an exemption under this subsection for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that for the period of the proposed exemption the issuance of such exemption is in the public interest and is consistent with the purposes of this chapter.
(f) Temporary exemption for peakload powerplants
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant an exemption under this subsection for the use of natural gas or petroleum, if the petitioner certifies that such powerplant is to be operated solely as a peakload powerplant.
(g) Temporary exemption for powerplants where necessary to maintain reliability of service
(1) After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant an exemption under this subsection for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that such exemption is necessary to prevent impairment of reliability of service.
(2) Notwithstanding any other provision of this chapter, an exemption under this part (other than a permanent exemption under
(h) Duration of temporary exemptions
(1) Except as provided in paragraphs (2) and (3), exemptions under this section for any powerplant may not exceed, taking into account any extension or renewal, 5 years.
(2)(A) An exemption under subsection (a)(1) may be granted for a period of more than 5 years, but may not exceed, taking into account any extension or renewal, 10 years.
(B) Subject to paragraph (3), an exemption under subsections (b), (c), and (g) may be extended beyond the 5-year limit under paragraph (1), but such exemption, so extended, may not exceed 10 years.
(3) An exemption under subsections (d), (f), and (g) for the use of natural gas by a powerplant may not extend beyond December 31, 1994.
(4) In computing the 5-year and 10-year limitations of paragraphs (1) and (2) in the case of any exemption under this section, the period before the prohibition on the use of natural gas and petroleum would first apply (if the exemption had not been granted) shall be disregarded.
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (d)(2), (e), and (g)(2), was in the original "this Act", meaning
Amendments
1987—Subsec. (a).
Subsecs. (b) to (e), (h)(1).
Statutory Notes and Related Subsidiaries
Exemption for Certain Electric Powerplants as Effective Prior to 180 Days After November 9, 1978
For effectiveness of exemption for certain electric powerplants as prior to 180 days after Nov. 9, 1978, see section 902(a) of
§8352. Permanent exemptions
(a) Permanent exemption due to lack of alternate fuel supply, site limitations, or environmental requirements
(1) After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant a permanent exemption under this subsection for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that despite diligent good faith efforts—
(A) it is likely that an adequate and reliable supply of coal or other alternate fuels of the quality necessary to conform with design and operational requirements for use as a primary energy source will not be available to such powerplant at a cost (taking into account associated facilities for the transportation and use of such fuel) which, based upon the best practicable estimates, does not substantially exceed the cost, as determined by rule by the Secretary, of using imported petroleum as a primary energy source during the remaining useful life of the powerplant;
(B) one or more site limitations exist which would not permit the operation of such a powerplant using coal or any other alternate fuel as a primary energy source; or
(C) the prohibitions of part A could not be satisfied without violating applicable environmental requirements.
(2) Notwithstanding the preceding provisions of this subsection, a powerplant which has been granted an exemption under subsection (g) may not be granted an exemption under this subsection.
(b) Permanent exemption due to certain State or local requirements
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary may, by order, grant a permanent exemption under this subsection, if he finds that the petitioner has demonstrated that—
(1) with respect to the site of the powerplant, the operation of such a facility using coal or any other alternate fuel is infeasible because of a State or local requirement;
(2) if such State or local requirement is under a building code or nuisance or zoning law, no other exemption under this part could be granted for such facility; and
(3) the granting of the exemption would be in the public interest and would be consistent with the purposes of this chapter.
(c) Permanent exemption for cogeneration
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a cogeneration facility, the Secretary may, by order, grant a permanent exemption under this subsection, if he—
(1) finds that the petitioner has demonstrated that economic and other benefits of cogeneration are unobtainable unless petroleum or natural gas, or both, are used in such facility, and
(2) includes in the final order a statement of the basis for such finding.
(d) Permanent exemption for certain fuel mixtures containing natural gas or petroleum
(1) After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant a permanent exemption under this subsection, if he finds that the petitioner has demonstrated that—
(A) the powerplant uses, or proposes to use, a mixture of petroleum or natural gas and coal or another alternate fuel as a primary energy source; and
(B) the amount of the petroleum or natural gas used in such mixture will not exceed the minimum percentage of the total Btu heat input of the primary energy sources of such powerplant needed to maintain reliability of operation of the unit consistent with maintaining a reasonable level of fuel efficiency, as determined in accordance with rules prescribed by the Secretary.
(2) Repealed.
(3) The Secretary may authorize a higher percentage than that referred to in paragraph (1)(B) if he finds that the higher percentage of natural gas allowed would be mixed with synthetic fuels derived from municipal wastes or agricultural wastes and would encourage the use of alternate or new technologies which use renewable sources of energy.
(e) Permanent exemption for emergency purposes
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant a permanent exemption under this subsection, if he finds that the petitioner has demonstrated that such powerplant will be maintained and operated only for emergency purposes (as defined by rule by the Secretary).
(f) Permanent exemption for peakload powerplants
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant a permanent exemption under this subsection, if he finds that—
(1) the powerplant is operated solely as a peakload powerplant;
(2) a denial of such petition is likely to result in an impairment of reliability of service; and
(3)(A) modification of the powerplant to permit compliance with such prohibitions is technically infeasible; or
(B) such modification would result in an unreasonable expense.
(g) Permanent exemption for intermediate load powerplants
(1) After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A on the use of petroleum by a powerplant, the Secretary may, by order, grant a permanent exemption under this subsection, if he finds that the petitioner has demonstrated that—
(A) the Administrator of the Environmental Protection Agency (or the appropriate State air pollution control agency) certifies to the Secretary that the use by such powerplant of coal or any available alternate fuel as a primary energy source will cause or contribute to a concentration, in an air quality control region or any area within such region, of a pollutant for which any national ambient air quality standard is or would be exceeded for such area;
(B) such powerplant is to be operated only to replace no more than the equivalent capacity of existing electric powerplants—
(i) which use natural gas or petroleum as a primary energy source,
(ii) which are owned by the same person who is to operate such powerplant, and
(iii) which, if they used coal as a primary energy source, would cause or contribute to such a concentration in such region;
(C) such powerplant is and shall continue to be operated solely as an intermediate load powerplant;
(D) the net fuel heat input rate for such powerplant will be maintained at or less than 9,500 Btu's per kilowatt hour throughout the remaining useful life of the powerplant; and
(E) the powerplant has the capability to use synthetic fuels derived from coal or other alternate fuel.
(2) The Secretary shall, from time to time, review each exemption granted to a powerplant under this subsection, and shall terminate such exemption if he finds that there is available a supply of synthetic fuel derived from coal or other alternate fuel suitable for use as a primary energy source by such powerplant.
(h) Permanent exemption for use of natural gas by certain powerplants with capacities of less than 250 million Btu's per hour
(1) Subject to paragraph (2), after consideration of a petition (and comments thereon) for an exemption from any prohibition of part A for the use of natural gas by a powerplant, the Secretary shall, by order, grant a permanent exemption under this subsection for such use, if he finds that the petitioner has demonstrated that—
(A) such powerplant has a design capability of consuming fuel (or any mixture thereof) at a fuel heat input rate of less than 250 million Btu's per hour;
(B) such powerplant was a baseload powerplant on April 20, 1977; and
(C) such powerplant is not capable of consuming coal without—
(i) substantial physical modification of the unit; or
(ii) substantial reduction in the rated capacity of the unit (as determined by the Secretary).
(2) An exemption under this subsection may only apply to the prohibitions under
(i) Permanent exemption for use of LNG by certain powerplants
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant a permanent exemption under this subsection for the use of liquefied natural gas if the Administrator of the Environmental Protection Agency (or the appropriate State air pollution control agency) has certified to the Secretary that the use of coal by such powerplant as a primary energy source will cause or contribute to a concentration, in an air quality control region or any area within such region, of a pollutant for which any national ambient air quality standard is or would be exceeded for such region or area and the use of coal would not comply with applicable environmental requirements.
(
Editorial Notes
References in Text
This chapter, referred to in subsec. (b)(3), was in the original "this Act", meaning
Amendments
1987—Subsecs. (a)(1), (b), (d)(1).
Subsec. (d)(2).
Subsec. (d)(3).
Subsec. (e).
Subsec. (j).
Subsec. (k).
Subsec. (l).
Statutory Notes and Related Subsidiaries
Exemption for Certain Electric Powerplants as Effective Prior to 180 Days After November 9, 1978
For effectiveness of exemption for certain electric powerplants as prior to 180 days after Nov. 9, 1978, see section 902(a) of
§8353. General requirements for exemptions
(a) Use of mixtures or fluidized bed combustion not feasible
Except in the case of an exemption under
(1) if the applicant has demonstrated that the use of a mixture of natural gas or petroleum and coal (or other alternate fuels), for which an exemption under
(2) if the Secretary has not made a finding that the use of a method of fluidized bed combustion of coal or an alternate fuel is economically and technically feasible.
(b) No alternative power supply in case of a powerplant
(1) In the case of an exemption under section 8352(b) or (g) of this title, the Secretary may not grant an exemption for an existing powerplant unless he finds that the petitioner has demonstrated that there is no alternative supply of electric power which is available within a reasonable distance at a reasonable cost without impairing short-run or long-run reliability of service and which can be obtained by the petitioner, despite reasonable good faith efforts.
(2) The Secretary shall forward a copy of any such petition to the Federal Energy Regulatory Commission promptly after it is filed with the Secretary and shall consult with the Commission before making any finding on such petition under paragraph (l).
(
Editorial Notes
Amendments
1987—Subsec. (a).
Statutory Notes and Related Subsidiaries
Exemption for Certain Electric Powerplants as Effective Prior to 180 Days After November 9, 1978
For effectiveness of exemption for certain electric powerplants as prior to 180 days after Nov. 9, 1978, see section 902(a) of
§8354. Terms and conditions; compliance plans
(a) Terms and conditions generally
Any exemption from any prohibition under this part shall be on such terms and conditions as the Secretary determines appropriate, including terms and conditions requiring the use of effective fuel conservation measures which are practicable and consistent with the purposes of this chapter. In the case of any temporary exemption, the terms and conditions (which may include a compliance plan meeting the requirements of subsection (b)) shall be designed to insure that upon the expiration of such exemption, the persons and powerplant covered by such exemption will comply with the applicable prohibitions.
(b) Compliance plans
A compliance plan meets the requirements of this subsection if it is approved by the Secretary and—
(1) contains (A) a schedule indicating how compliance with applicable prohibition of this chapter will occur and (B) evidence of binding contracts for fuel, or facilities for the production of fuel, which would allow for such compliance; and
(2) is revised at such times and to such extent as the Secretary may require to reflect changes in circumstances.
(
Editorial Notes
References in Text
This chapter, referred to in subsecs. (a) and (b)(1)(A), was in the original "this Act", meaning
Amendments
1987—Subsec. (a).
Statutory Notes and Related Subsidiaries
Exemption for Certain Electric Powerplants as Effective Prior to 180 Days After November 9, 1978
For effectiveness of exemption for certain electric powerplants as prior to 180 days after Nov. 9, 1978, see section 902(a) of