CHAPTER 32A —COLORADO RIVER BASIN SALINITY CONTROL
SUBCHAPTER I—PROGRAMS DOWNSTREAM FROM IMPERIAL DAM
SUBCHAPTER II—MEASURES UPSTREAM FROM IMPERIAL DAM
SUBCHAPTER I—PROGRAMS DOWNSTREAM FROM IMPERIAL DAM
§1571. Water quality improvement
(a) Authority to proceed with program
The Secretary of the Interior, hereinafter referred to as the "Secretary", is authorized and directed to proceed with a program of works of improvement for the enhancement and protection of the quality of water available in the Colorado River for use in the United States and the Republic of Mexico, and to enable the United States to comply with its obligations under the agreement with Mexico of August 30, 1973 (Minute No. 242 of the International Boundary and Water Commission, United States and Mexico), concluded pursuant to the Treaty of February 3, 1944 (TS 994), in accordance with the provisions of this chapter.
(b) Desalting complexes and plants
(1) The Secretary is authorized to construct, operate, and maintain a desalting complex, including (1) a desalting plant to reduce the salinity of drain water from the Wellton-Mohawk division of the Gila project, Arizona (hereinafter referred to as the division), including a pretreatment plant for settling, softening, and filtration of the drain water to be desalted; (2) the necessary appurtenant works including the intake pumping plant system, product waterline, power transmission facilities, and permanent operating facilities; (3) the necessary extension in the United States and Mexico of the existing bypass drain to carry the reject stream from the desalting plant and other drainage waters to the Santa Clara Slough in Mexico, with the part in Mexico, subject to arrangements made pursuant to subsection (d); (4) replacement of the metal flume in the existing main outlet drain extension with a concrete siphon; (5) reduction of the quantity of irrigation return flows through acquisition of lands to reduce the size of the division, and irrigation efficiency improvements to minimize return flows; (6) acquire on behalf of the United States such lands or interest in lands in the Painted Rock Reservoir as may be necessary to operate the project in accordance with the obligations of Minute No. 242, and (7) all associated facilities including roads, railroad spur, and transmission lines.
(2)(A) The desalting plant shall be designed to treat approximately one hundred and twenty-nine million gallons a day of drain water using advanced technology commercially available. The plant shall effect recovery initially of not less than 70 per centum of the drain water as product water, and shall effect reduction of not less than 90 per centum of the dissolved solids in the feed water. The Secretary shall use sources of electric power supply for the desalting complex that will not diminish the supply of power to preference customers from Federal power systems operated by the Secretary.
(B) The Secretary is authorized to use electrical power and energy available from the Navajo Generating Station which is in excess of the Central Arizona Project pumping requirements for the purpose of supplying power and energy requirements of the desalting plant and protective pumping well field constructed pursuant to this subchapter: Provided, That revenues credited to the Lower Colorado River Basin Development Fund shall not be diminished below those amounts which would have accrued had the power been marketed at the rate determined by the Secretary of Energy for the sale of power from the Navajo Generating Station to utilities and public entities, as a result of the use of power and energy for the desalting, protective pumping works, and other uses authorized by law, and that power and energy from the Navajo Generating Station shall be used first to meet the pumping requirements of the Central Arizona Project and after those needs have been met, for the desalting and protective pumping facilities constructed pursuant to this subchapter, and finally for other uses: Provided further, That prior to obtaining power from the Navajo Generating Station under the authority of this subsection, the Secretary shall complete an analysis of alternative sources of supply, including but not limited to the possibility of developing an agreement with the Republic of Mexico whereby the United States (or a non-Federal entity) would enter into contractual arrangements with Mexico for a sufficient supply of power to operate the desalting plant, the regulatory pumping fields and appurtenant facilities.
(C) Effective October 1, 1979, and to such extent and in such amounts as are provided in advance in appropriation Acts, the Secretary of the Interior is authorized to purchase supplemental power and energy as required for the purposes of supplying the power and energy requirements of the desalting plant and protective pumping well field.
(c) Replacement water studies
Replacement of the reject stream from the desalting plant, Colorado River waters used for the mitigation of fish and wildlife habitat losses and of any Wellton-Mohawk drainage water bypassed to the Santa Clara Slough to accomplish essential operation except at such times when there exists surplus water of the Colorado River under the terms of the Mexican Water Treaty of 1944, is recognized as a national obligation as provided in
(d) Advancement of funds for that portion of bypass drain within Mexico
The Secretary is hereby authorized to advance funds to the United States section, International Boundary and Water Commission (IBWC), for construction, operation, and maintenance by Mexico pursuant to Minute No. 242 of that portion of the bypass drain within Mexico. Such funds shall be transferred to an appropriate Mexican agency, under arrangements to be concluded by the IBWC providing for the construction, operation, and maintenance of such facility by Mexico.
(e) Desalted water exchange
Any desalted water not needed for the purposes of this subchapter may be exchanged at prices and under terms and conditions satisfactory to the Secretary and the proceeds therefrom shall be deposited in the General Fund of the Treasury. The city of Yuma, Arizona, shall have first right of refusal to any such water.
(f) Return flow reduction
For the purpose of reducing the return flows from the division to one hundred and seventy-five thousand acre-feet or less, annually, the Secretary is authorized to:
(1) Accelerate the cooperative program of Irrigation Management Services with the Wellton-Mohawk Irrigation and Drainage District, hereinafter referred to as the district, for the purpose of improving irrigation efficiency. The district shall bear its share of the cost of such program as determined by the Secretary.
(2) Acquire by purchase or through eminent domain or exchange, to the extent determined by him to be appropriate, lands or interests in lands to reduce the existing seventy-five thousand developed and undeveloped irrigable acres authorized by the Act of July 30, 1947 (
(g) Disposal of acquired lands
The Secretary is authorized to dispose of the acquired lands and interests therein on terms and conditions satisfactory to him and meeting the objective of this chapter.
(h) Assistance to water users for installation of system improvements
The Secretary is authorized, either in conjunction with or in lieu of land acquisition, to assist water users in the division in installing system improvements, such as ditch lining, change of field layouts, automatic equipment, sprinkler systems and bubbler systems, as a means of increasing irrigation efficiencies: Provided, however, That all costs associated with the improvements authorized herein and allocated to the water users on the basis of benefits received, as determined by the Secretary, shall be reimbursed to the United States in amounts and on terms and conditions satisfactory to the Secretary.
(i) Contract amendment
The Secretary is authorized to amend the contract between the United States and the district dated March 4, 1952, as amended, to provide that—
(1) the portion of the existing repayment obligation owing to the United States allocable to irrigable acreage eliminated from the division for the purposes of this subchapter, as determined by the Secretary, shall be nonreimbursable; and
(2) if deemed appropriate by the Secretary, the district shall be given credit against its outstanding repayment obligation to offset any increase in operation and maintenance assessments per acre which may result from the district's decreased operation and maintenance base, all as determined by the Secretary.
(j) Acquisition of land for storage
The Secretary is authorized to acquire through the Corps of Engineers fee title to, or other necessary interests in, additional lands above the Painted Rock Dam in Arizona that are required for the temporary storage capacity needed to permit operation of the dam and reservoir in times of serious flooding in accordance with the obligations of the United States under Minute No. 242. No funds shall be expended for acquisition of land or interests therein until it is finally determined by a Federal court of competent jurisdiction that the Corps of Engineers presently lacks legal authority to use said lands for this purpose. Nothing contained in this subchapter nor any action taken pursuant to it shall be deemed to be a recognition or admission of any obligation to the owners of such land on the part of the United States or a limitation or deficiency in the rights or powers of the United States with respect to such lands or the operation of the reservoir.
(k) Transfer of funds
To the extent desirable to carry out subsections (f)(1) and (h), the Secretary may transfer funds to the Secretary of Agriculture as may be required for technical assistance to farmers, conduct of research and demonstrations, and such related investigations as are required to achieve higher on-farm irrigation efficiencies.
(l) Nonreimbursable costs
All cost associated with the desalting complex shall be nonreimbursable except as provided in subsections (f) and (h).
(
Editorial Notes
References in Text
Act of July 30, 1947 (
Amendments
1980—Subsec. (b)(2).
Subsec. (c).
Statutory Notes and Related Subsidiaries
Short Title
§1572. Canal or canal lining
(a) Authorization of construction
To assist in meeting salinity control objectives of Minute No. 242 during an interim period, the Secretary is authorized to construct a new concrete-lined canal or, to line the presently unlined portion of the Coachella Canal of the Boulder Canyon project, California, from station 2 plus 26 to the beginning of siphon numbered 7, a length of approximately forty-nine miles. The United States shall be entitled to temporary use of a quantity of water, for the purpose of meeting the salinity control objectives of Minute No. 242, during an interim period, equal to the quantity of water conserved by constructing or lining the said canal. The interim period shall commence on completion of construction or lining said canal and shall end the first year that the Secretary delivers main stream Colorado River water to California in an amount less than the sum of the quantities requested by (1) the California agencies under contracts made pursuant to
(b) Repayment
The charges for total construction shall be repayable without interest in equal annual installments over a period of forty years beginning in the year following completion of construction: Provided, That, repayment shall be prorated between the United States and the Coachella Valley County Water District, and the Secretary is authorized to enter into a repayment contract with Coachella Valley County Water District for that purpose. Such contract shall provide that annual repayment installments shall be nonreimbursable during the interim period, defined in subsection (a) and shall provide that after the interim period, said annual repayment installments or portions thereof, shall be paid by Coachella Valley County Water District.
(c) Acquisition of private lands
The Secretary is authorized to acquire by purchase, eminent domain, or exchange private lands or interests therein, as may be determined by him to be appropriate, within the Imperial Irrigation District on the Imperial East Mesa which receive, or which have been granted rights to receive, water from Imperial Irrigation District's capacity in the Coachella Canal. Costs of such acquisitions shall be nonreimbursable and the Secretary shall return such lands to the public domain. The United States shall not acquire any water rights by reason of this land acquisition.
(d) Credit to Imperial Irrigation District against final payments for relinquished capacity in Coachella Canal
The Secretary is authorized to credit Imperial Irrigation District against its final payments for certain outstanding construction charges payable to the United States on account of capacity to be relinquished in the Coachella Canal as a result of the canal lining program, all as determined by the Secretary: Provided, That, relinquishment of capacity shall not affect the established basis for allocating operation and maintenance costs of the main All-American Canal to existing contractors.
(e) Transfer of lands to Cocopah Tribe of Indians
The Secretary is authorized and directed to cede the following land to the Cocopah Tribe of Indians, subject to rights-of-way for existing levees, to be held in trust by the United States for the Cocopah Tribe of Indians:
Township 9 south, range 25 west of the Gila and Salt River meridian, Arizona;
Section 25: Lots 18, 19, 20, 21, 22, and 23;
Section 26: Lots 1, 12, 13, 14, and 15;
Section 27: Lot 3; and all accretion to the above described lands.
The Secretary is authorized and directed to construct three bridges, one of which shall be capable of accommodating heavy vehicular traffic, over the portion of the bypass drain which crosses the reservation of the Cocopah Tribe of Indians. The transfer of lands to the Cocopah Indian Reservation and the construction of bridges across the bypass drain shall constitute full and complete payment to said tribe for the rights-of-way required for construction of the bypass drain and electrical transmission lines for works authorized by this subchapter.
(
§1573. Construction and maintenance of well fields; land acquisition; land replacement; nonreimbursable costs
(a) The Secretary is authorized to:
(1) Construct, operate, and maintain, consistent with Minute No. 242, well fields capable of furnishing approximately one hundred and sixty thousand acre-feet of water per year for use in the United States and for delivery to Mexico in satisfaction of the 1944 Mexican Water Treaty.
(2) Acquire by purchase, eminent domain, or exchange, to the extent determined by him to be appropriate, approximately twenty-three thousand five hundred acres of lands or interests therein with approximately five miles of the Mexican border on the Yuma Mesa: Provided, however, That any such lands which are presently owned by the State of Arizona may be acquired or exchanged for Federal lands.
(3) Any lands removed from the jurisdiction of the Yuma Mesa Irrigation and Drainage District pursuant to clause (2) of this subsection which were available for use under the Gila Reauthorization Act (
(4) Effective October 1, 1979, and to such extent and in such amounts as are provided in advance in appropriation Acts, enter into contracts under the terms and conditions of the Act of June 17, 1902 (
(b) The cost of work provided for in this section, including delivery of water to Mexico, shall be nonreimbursable; except to the extent that the waters furnished are used in the United States.
(
Editorial Notes
References in Text
The Gila Reauthorization Act, referred to in subsec. (a)(3), is act July 30, 1947, ch. 382,
Act of June 17, 1902, referred to in subsec. (a)(4), is act June 17, 1902, ch. 1093,
The IBWC, referred to in subsec. (a)(4), is identified in
Amendments
1980—Subsec. (a)(4).
§1574. Modification of projects
The Secretary is authorized to provide for modifications of the projects authorized by this subchapter to the extent he determines appropriate for purposes of meeting the international settlement objective of this subchapter at the lowest overall cost to the United States. No funds for any such modification shall be expended until the expiration of sixty days after the proposed modification has been submitted to the appropriate committees of the Congress, unless the Congress approves an earlier date by concurrent resolution. The Secretary shall notify the Governors of the Colorado River Basin States of such modifications.
(
§1575. Contract authority
The Secretary is authorized to enter into contracts that he deems necessary to carry out the provisions of this subchapter in advance of the appropriation of funds therefor.
(
§1575a. Administration and disposition of lands and constructed facilities; revenues credited to general fund of Treasury
The Secretary is hereby authorized to administer and dispose of lands and interests in lands acquired, and facilities constructed under this subchapter, and revenues received in connection with this authority shall be credited to the general fund of the Treasury.
(
Editorial Notes
Prior Provisions
A prior section 106 of
§1576. Interagency cooperation
In carrying out the provisions of this subchapter, the Secretary shall consult and cooperate with the Secretary of State, the Administrator of the Environmental Protection Agency, the Secretary of Agriculture, and other affected Federal, State, and local agencies.
(
Editorial Notes
Prior Provisions
A prior section 107 of
§1577. Existing Federal laws not modified
Nothing in this chapter shall be deemed to modify the National Environmental Policy Act of 1969 [
(
Editorial Notes
References in Text
The National Environmental Policy Act of 1969, referred to in text, is
The Federal Water Pollution Control Act, as amended, referred to in text, probably means act June 30, 1948, ch. 758, as amended generally by
Prior Provisions
A prior section 108 of
§1578. Authorization of appropriations
There is hereby authorized to be appropriated the sum of $356,400,000 for the construction of the works and accomplishment of the purposes authorized in
(
Editorial Notes
References in Text
The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, referred to in text, is
Amendments
1980—
Statutory Notes and Related Subsidiaries
Effective Date of 1980 Amendment
§1579. Fish and wildlife habitat; mitigation of losses
Effective October 1, 1979, and to such extent and in such amounts as are provided in advance in appropriate 1 Acts, in order to provide measures determined by the Secretary of the Interior to be appropriated to mitigate loss of fish and wildlife habitat associated with other measures taken under this subchapter:
(a) Appropriation of funds; acquisition and disposal of lands; facilities undertakings; funds restriction for non-Federal facilities
The Secretary is authorized to—
(1) acquire lands by purchase, eminent domain, or exchange;
(2) dispose of land, facilities, and equipment;
(3) construct, operate, maintain, and make replacements of facilities: Provided, however, That no funds will be provided for operation, maintenance, or replacement of non-Federal facilities.
(b) Nonreimbursable costs
All costs authorized by this section are nonreimbursable.
(
1 So in original. Probably should be "appropriation".
§1580. Definitions
As used in this subchapter:
(a) Navajo Generating Station means—
(1) the United States entitlement to a portion of the output of power and energy from the Navajo Generating Station, Page, Arizona, pursuant to United States participation in that generating station;
(2) in the event that said United States entitlement is integrated with other generating facilities, then Navajo Generating Station means that amount of power and energy from the integrated system which is attributable to the United States Navajo entitlement;
(3) when the Navajo Generating Station is replaced at the end of its useful life or an alternative resource is established, then Navajo Generating Station means an amount of power and energy equivalent to the present United States entitlement from Navajo, from the replacement resource.
(b) All terms used herein that are defined in the Colorado River Compact shall have the meanings therein defined.
(
SUBCHAPTER II—MEASURES UPSTREAM FROM IMPERIAL DAM
§1591. Salinity control policy
(a) Implementation by Secretary of the Interior
The Secretary of the Interior shall implement the salinity control policy adopted for the Colorado River in the "Conclusions and Recommendations" published in the Proceedings of the Reconvened Seventh Session of the Conference in the Matter of Pollution of the Interstate Waters of the Colorado River and Its Tributaries in the States of California, Colorado, Utah, Arizona, Nevada, New Mexico, and Wyoming, held in Denver, Colorado, on April 26–27, 1972, under the authority of section 10 of the Federal Water Pollution Control Act (
(b) Expeditious investigation, planning, and implementation of salinity control program
The Secretary is hereby directed to expedite the investigation, planning, and implementation of the salinity control program generally as described in chapter VI of the Secretary's report entitled, "Colorado River Water Quality Improvement Program, February 1972". In determining the relative priority of implementing additional units or new self-contained portions of units authorized by
(c) Cooperation with other Federal agencies
In conformity with subsection (a) and the authority of the Environmental Protection Agency under Federal laws, the Secretary, the Administrator of the Environmental Protection Agency, and the Secretary of Agriculture are directed to cooperate and coordinate their activities effectively to carry out the objective of this subchapter.
(
Editorial Notes
References in Text
The Federal Water Pollution Control Act, referred to in subsec. (a), which was formerly classified to
Amendments
1984—Subsec. (b).
Statutory Notes and Related Subsidiaries
Effective Date of 1984 Amendment
§1592. Authorization to construct, operate, and maintain salinity control units and salinity control programs
(a) Authority of Secretary
The Secretary is authorized to construct, operate, and maintain the following salinity control units and salinity control programs as the initial stage of the Colorado River Basin salinity control program:
(1) The Paradox Valley unit, Montrose County, Colorado, consisting of facilities for collection and disposition of saline ground water of Paradox Valley, including wells, pumps, pipelines, solar evaporation ponds, and all necessary appurtenant and associated works such as roads, fences, dikes, power transmission facilities, and permanent operating facilities, and consisting of measures to replace incidental fish and wildlife values foregone.
(2) The Grand Valley unit, Colorado, consisting of measures and all necessary appurtenant and associated works to reduce the seepage of irrigation water from the irrigated lands of Grand Valley into the ground water and thence into the Colorado River. Measures shall include lining of canals and laterals, replacing canals and laterals with pipe, and the combining of existing canals and laterals into fewer and more efficient facilities implementing other measures to reduce salt contributions from the Grand Valley to the Colorado River, and implementing measures to replace incidental fish and wildlife values foregone..1 Prior to initiation of construction of the Grand Valley unit, or portion thereof, the Secretary shall enter into contracts through which the non-Federal entities owning, operating, and maintaining the water distribution systems, or portions thereof, in Grand Valley, singly or in concert, will assume the obligations specified in subsection (b)(2) relating to the continued operation and maintenance of the unit's facilities to the end that the maximum reduction of salinity inflow to the Colorado River will be achieved.
(3) The Las Vegas Wash unit, Nevada, consisting of facilities for collection and disposition of saline ground water of Las Vegas Wash, including infiltration galleries, pumps, desalter, pipelines, solar evaporation facilities, and all appurtenant works including but not limited to roads, fences, power transmission facilities, and operating facilities, and consisting of measures to replace incidental fish and wildlife values foregone.
(4) Stage I of the Lower Gunnison Basin unit, Colorado, consisting of measures and all necessary appurtenant and associated works to reduce seepage from canals and laterals in the Uncompahgre Valley, and consisting of measures to replace incidental fish and wildlife values foregone, essentially as described in the feasibility report and final environmental statement dated February 10, 1984. Prior to initiation of construction of stage I of the Lower Gunnison Basin unit, or of a portion of stage I, the Secretary shall enter into contracts through which the non-Federal entities owning, operating, and maintaining the water distribution systems, or portions thereof, in the Uncompahgre Valley, singly or in concert, will assume the obligations specified in subsection (b)(2) relating to the continued operation and maintenance of the unit's facilities.
(5) Portions of the McElmo Creek unit, Colorado, as components of the Dolores participating project, Colorado River Storage project, authorized by
(6) A basinwide salinity control program that the Secretary, acting through the Bureau of Reclamation, shall implement. The Secretary may carry out the purposes of this paragraph directly, or may make grants, commitments for grants, or advances of funds to non-Federal entities under such terms and conditions as the Secretary may require. Such program shall consist of cost-effective measures and associated works to reduce salinity from saline springs, leaking wells, irrigation sources, industrial sources, erosion of public and private land, or other sources that the Secretary considers appropriate. Such program shall provide for the mitigation of incidental fish and wildlife values that are lost as a result of the measures and associated works. The Secretary shall submit a planning report concerning the program established under this paragraph to the appropriate committees of Congress. The Secretary may not expend funds for any implementation measure under the program established under this paragraph before the expiration of a 30-day period beginning on the date on which the Secretary submits such report.
(7)
(A)
(B)
(C)
(i) cost-effective measures and associated works to reduce salinity from saline springs, leaking wells, irrigation sources, industrial sources, erosion of public and private land, or other sources;
(ii) operation and maintenance of salinity control features constructed under the Colorado River Basin salinity control program; and
(iii) studies, planning, and administration of salinity control activities.
(D)
(i)
(ii)
(b) Implementation of authorized units
In implementing the units authorized to be constructed pursuant to subsection (a), the Secretary shall carry out the following directions:
(1) As reports are completed describing final implementation plans for the unit, or any portion thereof, authorized by paragraph (5) of subsection (a), and prior to expenditure of funds for related construction activities, the Secretary shall submit such reports to the appropriate committees of the Congress and to the governors of the Colorado River Basin States.
(2) Non-Federal entities shall be required by the Secretary to contract for the long-term operation and maintenance of canal and lateral systems constructed pursuant to activities provided for in subsection (a): Provided, That the Secretary shall reimburse such non-Federal entities for the costs of such operation and maintenance to the extent the costs exceed the expenses that would have been incurred by them in the thorough and timely operation and maintenance of their canal and lateral systems absent the construction of a unit, said expenses to be determined by the Secretary after consultation with the involved non-Federal entities. The operation and maintenance for which non-Federal entities shall be responsible shall include such repairing and replacing of a unit's facilities as are associated with normal annual maintenance activities in order to keep such facilities in a condition which will assure maximum reduction of salinity inflow to the Colorado River. These non-Federal entities shall not be responsible, nor incur any costs, for the replacement of a unit's facilities, including measures to replace incidental fish and wildlife values foregone. The term replacement shall be defined for the purposes of this subchapter as a major modification or reconstruction of a completed unit, or portion thereof, which is necessitated, through no fault of the non-Federal entity or entities operating and maintaining a unit, by design or construction inadequacies or by normal limits on the useful life of a facility. The Secretary is authorized to provide continuing technical assistance to non-Federal entities to assure the effective and efficient operation and maintenance of a unit's facilities.
(3) The Secretary may, under authority of this subchapter, and limited to the purposes of this chapter, fund through a grant or contract, for any fiscal year only to such extent or in such amounts as are provided in appropriation Acts, a non-Federal entity to organize private canal and lateral owners into formal organizations with which the Secretary may enter into a grant or contract to construct, operate, and maintain a unit's facilities.
(4) In implementing the units authorized to be constructed or the programs pursuant to paragraphs (1), (2), (3), (4), (5), (6), and (7) of subsection (a), the Secretary shall comply with procedural and substantive State water laws.
(5) The Secretary may, under authority of this subchapter and limited to the purposes of this chapter, fund through a grant or contract, for any fiscal year only to such extent or in such amounts as are provided in appropriation Acts, a non-Federal entity to operate and maintain measures to replace incidental fish and wildlife values foregone.
(6) In implementing the units authorized to be constructed pursuant to subsection (a), the Secretary shall implement measures to replace incidental fish and wildlife values foregone concurrently with the implementation of a unit's, or a portion of a unit's, related features.
(c) Salinity control measures
The Secretary of Agriculture shall carry out salinity control measures (including watershed enhancement and cost-share measures with livestock and crop producers) in the Colorado River Basin as part of the environmental quality incentives program established under subchapter A of
(
Editorial Notes
References in Text
The Reclamation Act of 1902, referred to in subsec. (a)(5), probably means act June 17, 1902, ch. 1093,
The Food Security Act of 1985, referred to in subsec. (c), is
Codification
Amendments
2018—Subsec. (c).
2008—Subsec. (a).
Subsec. (a)(7).
Subsec. (b)(4).
1996—Subsec. (c).
1995—Subsec. (a).
Subsec. (b)(4).
1984—Subsec. (a).
Subsec. (a)(1).
Subsec. (a)(2).
Subsec. (a)(3).
Subsec. (a)(4).
Subsec. (a)(5).
Subsecs. (b), (c).
Statutory Notes and Related Subsidiaries
Effective Date of 2008 Amendment
Amendment of this section and repeal of
Effective Date of 1984 Amendment
Amendment by
§1593. Planning reports; research and demonstration projects
(a) The Secretary is authorized and directed to—
(1) Expedite completion of the planning reports on the following units, described in the Secretary's report, "Colorado River Water Quality Improvement Program, February 1972";
(i) Irrigation source control:
Lower Gunnison
Uintah Basin
Colorado River Indian Reservation
Palo Verde Irrigation District
(ii) Point source control:
LaVerkin Springs
Littlefield Springs
Glenwood-Dotsero Springs
(iii) Diffuse source control:
Price River
San Rafael River
Dirty Devil River
McElmo Creek
Big Sandy River
(2) Submit each planning report on the units named in paragraph (1) of this subsection promptly to the Colorado River Basin States and to such other parties as the Secretary deems appropriate for their review and comments. After receipt of comments on a unit and careful consideration thereof, the Secretary shall submit each final report with his recommendations, simultaneously, to the President, other concerned Federal departments and agencies, the Congress, and the Colorado River Basin States.
(b) The Secretary is directed—
(1) in the investigation, planning, construction, and implementation of any salinity control unit involving control of salinity from irrigation sources, to cooperate with the Secretary of Agriculture in carrying out research and demonstration projects and in implementing on-the-farm improvements and farm management practices and programs which will further the objective of this subchapter;
(2) to undertake research on additional methods for accomplishing the objective of this subchapter, utilizing to the fullest extent practicable the capabilities and resources of other Federal departments and agencies, interstate institutions, States, and private organizations;
(3) to develop a comprehensive program for minimizing salt contributions to the Colorado River from lands administered by the Bureau of Land Management and submit a report which describes the program and recommended implementation actions to the Congress and to the members of the advisory council established by
(4) to undertake feasibility investigations of saline water use and disposal opportunities, including measures and all necessary appurtenant and associated works, to demonstrate saline water use technology and to beneficially use and dispose of saline and brackish waters of the Colorado River Basin in joint ventures with current and future industrial water users, using, but not limited to, the concepts generally described in the Bureau of Reclamation Special Report of September 1981, entitled "Saline water use and disposal opportunities"; and
(5) to undertake advance planning activities on the Sinbad Valley Unit, Colorado, as described in the Bureau of Land Management Salinity Status Report, covering the period 1978–1979 and dated February 1980.
(
Editorial Notes
Amendments
1984—Subsec. (b)(3) to (5).
Statutory Notes and Related Subsidiaries
Effective Date of 1984 Amendment
Amendment by
§1594. Colorado River Basin Salinity Control Advisory Council
(a) There is created the Colorado River Basin Salinity Control Advisory Council composed of no more than three members from each State appointed by the Governor of each of the Colorado River Basin States.
(b) The Council shall be advisory only and shall—
(1) act as liaison between both the Secretaries of Interior and Agriculture and the Administrator of the Environmental Protection Agency and the States in accomplishing the purposes of this subchapter;
(2) receive reports from the Secretary on the progress of the salinity control program and review and comment on said reports; and
(3) recommend to both the Secretary and the Administrator of the Environmental Protection Agency appropriate studies of further projects, techniques, or methods for accomplishing the purposes of this subchapter.
(
Statutory Notes and Related Subsidiaries
Termination of Advisory Councils
Advisory councils established after Jan. 5, 1973, to terminate not later than the expiration of the 2-year period beginning on the date of their establishment, unless, in the case of a council established by the President or an officer of the Federal Government, such council is renewed by appropriate action prior to the expiration of such 2-year period, or in the case of a council established by the Congress, its duration is otherwise provided for by law. See
§1595. Salinity control units; authority and functions of Secretary of the Interior
(a) Allocation of costs
The Secretary shall allocate the total costs (excluding costs borne by non-Federal participants) of the on-farm measures authorized by
(1) In recognition of Federal responsibility for the Colorado River as an interstate stream and for international comity with Mexico, Federal ownership of the lands of the Colorado River Basin from which most of the dissolved salts originate, and the policy embodied in the Federal Water Pollution Control Act Amendments of 1972 (
(2) The reimbursable portion of the total costs shall be allocated between the Upper Colorado River Basin Fund established by section 5(a) of the Colorado River Storage Project Act (
(i) benefits to be derived in each basin from the use of water of improved quality and the use of works for improved water management;
(ii) causes of salinity; and
(iii) availability of revenues in the Lower Colorado River Basin Development Fund and increased revenues to the Upper Colorado River Basin Fund made available under
(3) Costs of construction and replacement of each unit or separable feature thereof authorized by sections 3 1592(a)(1), (2), and (3) of this title and costs of construction of measures to replace incidental fish and wildlife values foregone, when such measures are a part of the units authorized by sections 3 1592(a)(1), (2), and (3) of this title, allocated to the upper basin and to the lower basin under subsection (a)(2) shall be repaid within a fifty-year period or within a period equal to the estimated life of the unit, separable feature thereof, or replacement, whichever is less, without interest from the date such unit, separable feature, or replacement is determined by the Secretary to be in operation.
(4)(i) Costs of construction and replacement of each unit or separable feature thereof authorized by paragraphs (4) through (6) of section 1592 4 of this title, costs of construction of measures to replace incidental fish and wildlife values foregone, when such measures are a part of the on-farm measures authorized by
(ii) Costs allocated to the upper basin shall be repaid with interest within a fifty-year period, or within a period equal to the estimated life of the unit, separable feature thereof, replacement, or on-farm measure, whichever is less, from the date such unit, separable feature thereof, replacement, or on-farm measure is determined by the Secretary or the Secretary of Agriculture to be in operation.
(iii) Costs allocated to the lower basin shall be repaid without interest as such costs are incurred to the extent that money is available from the Lower Colorado River Basin development fund to repay costs allocated to the lower basin. If in any fiscal year the money available from the Lower Colorado River Basin development fund for such repayment is insufficient to repay the costs allocated to the lower basin, as provided in the preceding sentence, the deficiency shall be repaid with interest as soon as money becomes available in the fund for repayment of those costs.
(iv) The interest rates used pursuant to this chapter shall be determined by the Secretary of the Treasury, taking into consideration average market yields on outstanding marketable obligations of the United States with remaining periods to maturity comparable to the reimbursement period during the month preceding October 30, 1984, for costs outstanding at that date, or, in the case of costs incurred subsequent to October 30, 1984, during the month preceding the fiscal year in which the costs are incurred.
(5) Costs of operation and maintenance of each unit or separable feature thereof authorized by
(b) Costs payable from Lower Colorado River Basin Development Fund
(1) Costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof authorized by
(2) Omitted
(c) Costs payable from Upper Colorado River Basin Fund
Costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof authorized by
(d) Omitted
(e) Upward adjustment of rates for electrical energy
The Secretary is authorized to make upward adjustments in rates charged for electrical energy under all contracts administered by the Secretary under the Colorado River Storage Project Act (
(f) Up-front cost share
(1) In general
Effective beginning on the date of enactment of this paragraph, subject to paragraph (3), the cost share obligations required by this section shall be met through an up-front cost share from the Basin Funds, in the same proportions as the cost allocations required under subsection (a), as provided in paragraph (2).
(2) Basin States Program
The Secretary shall expend the required cost share funds described in paragraph (1) through the Basin States Program for salinity control activities established under
(3) Existing salinity control activities
The cost share contribution required by this section shall continue to be met through repayment in a manner consistent with this section for all salinity control activities for which repayment was commenced prior to the date of enactment of this paragraph.
(
Editorial Notes
References in Text
The Federal Water Pollution Control Act Amendments of 1972, referred to in subsec. (a)(1), is
The Colorado River Storage Project Act, referred to in subsec. (d), is act Apr. 11, 1956, ch. 203,
The date of enactment of this paragraph, referred to in subsec. (f)(1), (3), is the date of enactment of
Codification
Section is comprised of section 205 of
Amendments
2008—Subsec. (f).
1996—Subsec. (a).
Subsec. (f).
1995—Subsec. (a)(1).
Subsec. (a)(4)(i).
1984—Subsec. (a).
Subsec. (a)(1).
Subsec. (a)(3).
Subsec. (a)(4), (5).
Subsec. (b).
Subsec. (c).
Subsec. (e).
Statutory Notes and Related Subsidiaries
Effective Date of 2008 Amendment
Amendment of this section and repeal of
Effective Date of 1984 Amendment
Amendment by
Termination of Advisory Councils
Advisory councils established after Jan. 5, 1973, to terminate not later than the expiration of the 2-year period beginning on the date of their establishment, unless, in the case of a council established by the President or an officer of the Federal Government, such council is renewed by appropriate action prior to the expiration of such 2-year period, or in the case of a council established by the Congress, its duration is otherwise provided for by law. See
1 So in original. The comma probably should not appear.
2 So in original. Probably should be followed by a period.
3 So in original. Probably should be "section".
4 So in original. Probably should be section "1592(a)".
§1596. Biennial report to President, Congress, and Advisory Council
Commencing on January 1, 1975, and every two years thereafter, the Secretary shall submit, simultaneously, to the President, the Congress, and the Advisory Council created in
(
Editorial Notes
References in Text
Statutory Notes and Related Subsidiaries
Termination of Reporting Requirements
For termination, effective May 15, 2000, of provisions in this section relating to the requirement that the Secretary submit a biennial report to Congress, see section 3003 of
Termination of Advisory Councils
Advisory councils established after Jan. 5, 1973, to terminate not later than the expiration of the 2-year period beginning on the date of their establishment, unless, in the case of a council established by the President or an officer of the Federal Government, such council is renewed by appropriate action prior to the expiration of such 2-year period, or in the case of a council established by the Congress, its duration is otherwise provided for by law. See
§1597. Construction of provisions of subchapter
Except as provided in
(
Editorial Notes
References in Text
This subchapter, referred to in text, was in the original "this title", meaning title II of
The Colorado River Basin Project Act, referred to in text, is
The Colorado River Storage Project Act, referred to in text, is act Apr. 11, 1956, ch. 203,
The Colorado River Compact (
The Boulder Canyon Project Act, referred to in text, is act Dec. 21, 1928, ch. 42,
The Boulder Canyon Project Adjustment Act, referred to in text, is act July 19, 1940, ch. 643,
Section 6 of the Fryingpan-Arkansas Project Act [
The National Environmental Policy Act of 1969, referred to in text, is
The Federal Water Pollution Control Act, as amended, referred to in text, is act June 30, 1948, ch. 758, as amended generally by
§1598. Achieving project objectives
(a) Modification of projects
The Secretary is authorized to provide for modifications of the projects authorized by this subchapter as determined to be appropriate for purposes of meeting the objective of this subchapter. No funds for any such modification shall be expended until the expiration of sixty days after the proposed modification has been submitted to appropriate committees of the Congress, except that funds may be expended prior to the expiration of such sixty days in any case in which the Congress approves an earlier date by concurrent resolution. The Governors of the Colorado River Basin States shall be notified of these changes.
(b) Contract authority; authorization of appropriations
The Secretary is hereby authorized to enter into contracts that he deems necessary to carry out the provisions of this subchapter, in advance of the appropriation of funds therefor. There is hereby authorized to be appropriated the sum of $125,100,000 for the construction of the works and for other purposes authorized in section 1592(a) or (b) of this title, based on April 1973 prices, plus or minus such amounts as may be justified by reason of ordinary fluctuations in costs involved therein, and such sums as may be required to operate and maintain such works. The funds authorized to be appropriated by this section may be used for construction of any or all of the works or portions thereof and for other purposes authorized in subsection (a), including measures as provided for in subsection (b) of
(c) Implementation of basinwide salinity control program
In addition to the amounts authorized to be appropriated under subsection (b), there are authorized to be appropriated $175,000,000 for
(
Editorial Notes
References in Text
The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, referred to in subsec. (b), is
Amendments
2000—Subsec. (c).
1995—Subsec. (c).
1984—Subsec. (a).
Subsec. (b).
Statutory Notes and Related Subsidiaries
Effective Date of 1984 Amendment
Amendment by
§1599. Definitions
As used in this subchapter—
(a) all terms that are defined in the Colorado River Compact shall have the meanings therein defined;
(b) "Colorado River Basin States" means the States of Arizona, California, Colorado, Nevada, New Mexico, Utah, and Wyoming.
(