CHAPTER 12C —FORT PECK PROJECT
§833. Completion and maintenance of project; generation of electricity
For the purpose of improving navigation on the Missouri River, and for other purposes incidental thereto, the dam and appurtenant works now under construction at Fort Peck, Montana, and a suitable power plant for the production of hydroelectric power (which dam, power plant, and appurtenant works are hereinafter called Fort Peck project), shall be completed, maintained, and operated under the direction of the Secretary of the Army and the supervision of the Chief of Engineers, subject to the provisions of this chapter relating to the powers and duties of the Bureau of Reclamation (hereinafter called the Bureau), as provided for in
(May 18, 1938, ch. 250, §1,
Statutory Notes and Related Subsidiaries
Change of Name
Department of War designated Department of the Army and title of Secretary of War changed to Secretary of the Army by section 205(a) of act July 26, 1947, ch. 343, title II,
Transfer of Functions
Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833a. Administration of project
(a) Disposal of energy; temporary administration; installation and maintenance of equipment
The electric energy generated in the operation of the said Fort Peck project shall be disposed of by the Bureau as hereinafter provided. The Bureau shall exercise the powers and perform the duties provided for in this chapter under the supervision and direction of the Secretary of the Interior in accordance with
(b) Construction and maintenance of electric transmission lines, substations, and interconnections
In order to encourage the widest possible use of all electric energy that can be generated and marketed and to provide reasonable outlets therefor, and to prevent the monopolization thereof by limited groups, the Bureau is authorized and directed to provide, construct, operate, maintain, and improve such electric transmission lines and substations, and facilities and structures appurtenant thereto, as it finds necessary, desirable, or appropriate for the purpose of transmitting electric energy, available for sale, from the Fort Peck project to existing and potential markets, and, for the purpose of interchange of electric energy, to interconnect the Fort Peck project with either private or with other Federal projects and publicly owned power systems now or hereafter constructed.
(c) Acquisition of real and personal property
The Secretary of the Interior is authorized, in the name of the United States, to acquire, by purchase, lease, condemnation, or donation, such real and personal property, or any interest therein, including lands, easements, rights-of-way, franchises, electric transmission lines, substations, and facilities and structures appurtenant thereto, as he finds necessary or appropriate to carry out the purposes of this chapter. Title to all property and property rights acquired by said Secretary shall be taken in the name of the United States.
(d) Acquisition of any property or property rights
The Secretary of the Interior shall have power to acquire any property or property rights, including patent rights, which in his opinion are necessary to carry out the purposes of this chapter, by purchase, lease, donation, or by the exercise of the right of eminent domain and to institute condemnation proceedings therefor in the same manner as is provided by law for the condemnation of real estate.
(e) Disposal of real and personal property
The Secretary of the Interior is authorized, in the name of the United States, to sell, lease, or otherwise dispose of such personal property as in his judgment is not required for the purposes of this chapter and such real property and interests in land acquired in connection with construction or operation of electric transmission lines or substations as in his judgment are not required for the purposes of this chapter.
(f) Contracts by Bureau
Subject to the provisions of this chapter, the Bureau is authorized, in the name of the United States, to negotiate and enter into such contracts, agreements, and arrangements as it shall find necessary or appropriate to carry out the purposes of this chapter.
(May 18, 1938, ch. 250, §2,
Statutory Notes and Related Subsidiaries
Change of Name
Department of War designated Department of the Army and title of Secretary of War changed to Secretary of the Army by section 205(a) of act July 26, 1947, ch. 343, title II,
Transfer of Functions
Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by
Transfer of Certain Facilities
Act Aug. 31, 1951, ch. 375, title I, §101,
Transfer of Transmission Lines, Substations, etc.; Cost Price; Authority of Secretary
Act Feb. 27, 1948, ch. 75,
"
"
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833b. Definitions
As employed in this chapter, the term "public body," or "public bodies," means States, public power districts, counties, and municipalities, including agencies or subdivisions of any thereof.
As employed in this chapter, the term "cooperative," or "cooperatives," means any form of nonprofit-making organization or organizations of citizens supplying, or which may be created to supply, members with any kind of goods, commodities, or services, as nearly as possible at cost.
(May 18, 1938, ch. 250, §3,
§833c. Preference to public bodies and cooperatives
In order to insure that the facilities for the generation of electric energy at the Fort Peck project shall be operated for the benefit of the general public, and particularly of domestic and rural consumers, the Bureau shall at all times, in disposing of electric energy generated at said project, give preference and priority to public bodies and cooperatives.
(May 18, 1938, ch. 250, §4,
Statutory Notes and Related Subsidiaries
Transfer of Functions
Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833d. Rate schedules; preparation, approval, and uniformity
Schedules of rates and charges for electric energy produced at the Fort Peck project and sold to purchasers as in this chapter provided shall be prepared by the Bureau and become effective upon confirmation and approval thereof by the Secretary of Energy. Subject to confirmation and approval by the Secretary of Energy, such rate schedules may be modified from time to time by the Bureau and shall be fixed and established with a view to encouraging the widest possible diversified use of electric energy. The said rate schedules may provide for uniform rate or rates uniform throughout prescribed transmission areas in order to extend the benefits of an integrated transmission system and encourage the equitable distribution of the electric energy developed at the Fort Peck project.
(May 18, 1938, ch. 250, §5,
Statutory Notes and Related Subsidiaries
Transfer of Functions
Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by
"Secretary of Energy" substituted in text for "Federal Power Commission" pursuant to
The Federal Power Commission was terminated, and its functions, personnel, property, funds, etc., were transferred to the Secretary of Energy (except for certain functions which were transferred to the Federal Energy Regulatory Commission) by
Executive Documents
Transfer of Functions
Executive and administrative functions of Federal Power Commission, with certain reservations, transferred to Chairman of such Commission, with authority vested in him to authorize their performance by any officer, employee, or administrative unit under his jurisdiction, by Reorg. Plan No. 9 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3175,
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833e. Factors in determining rate schedules
It is the intent of Congress that rate schedules for the sale of electric energy which is or may be generated at the Fort Peck project in excess of the amount required for operating the dam and appurtenant works at said project shall be determined with due regard to and predicated upon the fact that such electric energy is developed from water power created as an incident to the construction of the dam in the Missouri River at the Fort Peck project for the purposes set forth in
(May 18, 1938, ch. 250, §6,
Statutory Notes and Related Subsidiaries
Transfer of Functions
"Secretary of Energy" substituted in text for "Federal Power Commission" pursuant to
The Federal Power Commission was terminated, and its functions, personnel, property, funds, etc., were transferred to the Secretary of Energy (except for certain functions which were transferred to the Federal Energy Regulatory Commission) by
Executive Documents
Transfer of Functions
Executive and administrative functions of Federal Power Commission, with certain reservations, transferred to Chairman of such Commission, with authority vested in him to authorize their performance by any officer, employee, or administrative unit under his jurisdiction, by Reorg. Plan No. 9 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3175,
§833f. Purchase of supplies and services
Notwithstanding any other provision of law, all purchases and contracts made by the Bureau or the Secretary of the Army for supplies or for services, except for personal services, shall be made after advertising, in such manner and at such times, sufficiently in advance of opening bids, as the Bureau or Secretary of the Army, as the case may be, shall determine to be adequate to insure notice and opportunity for competition. Such advertisement shall not be required, however, when (1) an emergency requires immediate delivery of the supplies or performance of the services; or (2) repair parts, accessories, supplemental equipment, or services are required for supplies or services previously furnished or contracted for; or (3) the aggregate amount involved in any purchase of supplies or procurement of services does not exceed $500; in which cases such purchase of supplies or procurement of services may be made in the open market in the manner common among businessmen. In comparing bids and in making awards, the Bureau or the Secretary of the Army, as the case may be, may consider such factors as relative quality and adaptability of supplies or services, the bidder's financial responsibility, skill, experience, record of integrity in dealing, and ability to furnish repairs and maintenance services, the time of delivery or performance offered, and whether the bidder has complied with the specifications.
(May 18, 1938, ch. 250, §7,
Statutory Notes and Related Subsidiaries
Change of Name
Department of War designated Department of the Army and title of Secretary of War changed to Secretary of the Army by section 205(a) of act July 26, 1947, ch. 343, title II,
Transfer of Functions
Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833g. Miscellaneous administrative provisions
(a) Accounts
The Bureau, subject to the requirements of the Federal Power Act [
(b) Expenditures
The Bureau may make such expenditures for offices, vehicles, furnishings, equipment, supplies, and books; for attendance at meetings; and for such other facilities and services as it may find necessary for the proper administration of this chapter.
(May 18, 1938, ch. 250, §8,
Editorial Notes
References in Text
The Federal Power Act, referred to in subsec. (a), was in the original the "Federal Water Power Act", and was redesignated the Federal Power Act by
Amendments
1954—Subsec. (c). Act Aug. 30, 1954, repealed subsec. (c) which required the Secretary of the Interior to submit an annual financial statement and report to Congress concerning the transmission and sale of electric energy generated at the Fort Peck project.
Statutory Notes and Related Subsidiaries
Transfer of Functions
Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833h. Personnel; appointment and compensation
The Secretary of the Interior, the Secretary of the Army, and the Secretary of Energy, respectively, shall appoint such attorneys, engineers, and other experts as may be necessary for carrying out the functions entrusted to them under this chapter, and shall fix the compensation of each of such attorneys, engineers, and other experts; and they may, subject to the civil-service laws, appoint such other officers and employees as may be necessary to carry out such functions and fix their salaries in accordance with
(May 18, 1938, ch. 250, §9,
Editorial Notes
Codification
Provisions which authorized the Secretary of the Interior, the Secretary of the Army, and the Secretary of Energy to appoint such attorneys, engineers, and other experts as may be necessary for carrying out the functions entrusted to them under this chapter "without regard to the provisions of the civil-service laws", and to fix their compensation "at not to exceed $7,500 per annum", have been omitted as obsolete and superseded.
Such appointments are subject to the civil service laws unless specifically excepted by those laws or by laws enacted subsequent to Executive Order No. 8743, Apr. 23, 1941, issued by the President pursuant to the Act of Nov. 26, 1940, ch. 919, title I, §1,
As to the compensation of such personnel, sections 1202 and 1204 of the Classification Act of 1949,
"
Amendments
1949—Act Oct. 28, 1949, substituted "Classification Act of 1949" for "Classification Act of 1923".
Statutory Notes and Related Subsidiaries
Change of Name
Department of War designated Department of the Army and title of Secretary of War changed to Secretary of the Army by section 205(a) of act July 26, 1947, ch. 343, title II,
Repeals
Act Oct. 28, 1949, ch. 782, cited as a credit to this section, was repealed (subject to a savings clause) by
Transfer of Functions
Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by
"Secretary of Energy" substituted in text for "Federal Power Commission" pursuant to
The Federal Power Commission was terminated, and its functions, personnel, property, funds, etc., were transferred to the Secretary of Energy (except for certain functions which were transferred to the Federal Energy Regulatory Commission) by
Executive Documents
Transfer of Functions
Executive and administrative functions of Federal Power Commission, with certain reservations, transferred to Chairman of such Commission, with authority vested in him to authorize their performance by any officer, employee, or administrative unit under his jurisdiction, by Reorg. Plan No. 9 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3175,
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833i. Deposit of receipts; establishment of continuing fund; authorization of appropriations
All receipts from transmission and sale of electric energy generated at the Fort Peck project shall be covered into the Treasury of the United States to the credit of miscellaneous receipts, save and except that the Treasury shall set up and maintain from such receipts a continuing fund of $500,000, to the credit of the Bureau and subject to expenditure by it, to defray the operating expense of generation and transmission of power delivered to the Bureau for disposal under this chapter, to defray emergency expenses and to insure continuous operation. There is authorized to be appropriated from time to time, out of moneys in the Treasury not otherwise appropriated, such sums as may be necessary to carry out the provisions of this chapter, including installation of equipment and machinery for the generation of electric energy, and facilities for its transmission and sale.
(May 18, 1938, ch. 250, §10,
Statutory Notes and Related Subsidiaries
Transfer of Functions
Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833j. Suits for and against project; legal representation
The Secretary of the Interior may, in the name of the United States, under the supervision of the Attorney General, bring such suits at law or in equity as in his judgment may be necessary to carry out the purposes of this chapter; and he shall be represented in the prosecution and defense of all litigation affecting the status or operation of the Fort Peck project by the United States attorneys for the districts, respectively, in which such litigation may arise, or by such attorney or attorneys as the Attorney General may designate as authorized by law, in conjunction with the regularly employed attorneys of the Bureau.
(May 18, 1938, ch. 250, §11,
Statutory Notes and Related Subsidiaries
Transfer of Functions
Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833k. Separability
If any provision of this chapter or the application of such provision to any person or circumstances shall be held invalid, the remainder of the chapter and the application of such provisions to persons or circumstances other than those as to which it is held invalid shall not be affected thereby.
(May 18, 1938, ch. 250, §12,
§833l. Acquisition of Indian lands
In aid of the construction of the Fort Peck project, there is granted to the United States, subject to the provisions of
(Apr. 23, 1946, ch. 199, §1,
Editorial Notes
Codification
Section was not enacted as part of act May 18, 1938, which comprises this chapter.
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833m. Determination of compensation for acquisition of Indian lands; funds payable from; disposition of moneys
As lands or interests in lands are designated from time to time under
(Apr. 23, 1946, ch. 199, §2,
Editorial Notes
Codification
Section was not enacted as part of act May 18, 1938, which comprises this chapter.
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833n. Use of deposits by allottees; nontaxability of lands
Funds deposited to the credit of allottees, their heirs, or devisees may be used, in the discretion of the Secretary of the Interior, for the acquisition of other lands and improvements, or the relocation of existing improvements or construction of new improvements on the lands so acquired for the allottees or heirs whose lands and improvements are acquired under the provisions of
(Apr. 23, 1946, ch. 199, §3,
Editorial Notes
Codification
Section was not enacted as part of act May 18, 1938, which comprises this chapter.
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833o. Authority of Secretary of the Interior for acquisition of Indian land
The Secretary of the Interior is authorized to perform any and all acts and to prescribe such regulations as he may deem appropriate to carry out the provisions of
(Apr. 23, 1946, ch. 199, §4,
Editorial Notes
Codification
Section was not enacted as part of act May 18, 1938, which comprises this chapter.
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,
§833p. Reversion of title
All designations of Indian lands pursuant to
(Apr. 23, 1946, ch. 199, §5,
Editorial Notes
Codification
Section was not enacted as part of act May 18, 1938, which comprises this chapter.
§833q. Educational costs of dependents of employees; payments to school districts; reimbursement from continuing fund
Under regulations prescribed by the Secretary of the Army, payments may be made, in advance or otherwise, from any funds available for the Fort Peck project, Montana, to the school district or districts serving that project as reimbursement for educational facilities (including, where appropriate, transportation to and from school) furnished by the said district or districts to pupils who are dependents of persons engaged in the construction, operation, and maintenance of the project and living at or near Fort Peck upon real property of the United States not subject to taxation by State or local agencies and upon which payments in lieu of taxes are not made by the United States, which payments for any school year shall not exceed that part of the cost of operating and maintaining such facilities which the number of pupils aforesaid in average daily attendance during that year bears to the whole number of pupils in average daily attendance at those schools during that year: Provided, That of the whole amount so paid in any fiscal year, the Bureau of Reclamation, Department of the Interior, shall reimburse the Secretary of the Army from the continuing fund provided in
(June 3, 1948, ch. 389,
Editorial Notes
Codification
Section was not enacted as part of act May 18, 1938, which comprises this chapter.
Statutory Notes and Related Subsidiaries
Transfer of Functions
Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by
Executive Documents
Transfer of Functions
For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3174,